Rare Element Resources Ltd. · OTC:REEMF

Rare Element Resources — Sidoti Conference (June 2013)

16 slides from Rare Element Resources's conference presentation, June 2013

  1. Slide 1: Bear Lodge Critical Rare Earth Project

    NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Developing the Next World-Class Rare Earth District June 2013 1

  2. Slide 2: Disclosure

    Disclosure The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its accuracy or completeness. The company is an exploration company and its mineral project has yet to be proven to be economic. Some references to geologic and technical i

  3. Slide 3: A World-Class Rare Earth District

    A World-Class Rare Earth District Critical Rare Earth Content Makes it a Top 5 Non-Chinese Rare Earth Deposit  Long-life resource with high-grade core and excellent exploration opportunity  Rich in Critical Rare Earth Oxides (CREO) – nearly 80% of anticipated revenues  Located in Wyoming and supp

  4. Slide 4: Top of Non-Chinese Projects in CREO Value

    Top 5 of Non-Chinese Projects in CREO Value Ranking Based on Value of Critical Rare Earth Content1 Project Ranking #7 Ranked - Bull Hill & Whitetail Deposits Combined (@ 1.5% cutoff grade) #5 Ranked - Whitetail Deposit only (@ 1.5% cutoff grade) #4 Ranked - Bull Hill & Whitetail High Grade (@ 3.0% c

  5. Slide 5: 2012 Drill Program Increased Resource by 65%

    2012 Drill Program Increased Resource by 65% Contained TREO Resource (Millions of lbs) 1000 944 900 800 65% Increase Current Measured 700 and Indicated 600 571 Resource* Supports 500 40+ Year Mine Life 400 300 200 100 0 2012 2013 Measured Indicated * Measured and Indicated Resource as defined by Can

  6. Slide 6: Long-Life Resource with High-Grade Core

    Long-Life Resource with High-Grade Core Measured and Indicated Resource (@ 1.5% cutoff grade) Tons Grade Contained TREO lbs Deposit (Millions) TREO % (Millions) Bull Hill Measured 1.94 3.93 153 Indicated 10.46 3.22 674 Whitetail Measured -- -- -- Indicated 2.25 2.61 117 Total 14.65 3.22 944 High-Gra

  7. Slide 7: Excellent Resource Growth Potential

    Excellent Resource Growth Potential Inferred Resource Tons Grade Grade Deposit % HREO (Millions) (%TREO) (%CREO) Bull Hill 23.4 2.63 0.67 4.9 Whitetail 8.0 2.82 0.75 7.2 @ 1.5% TREO Cutoff Grade  HREE-enriched zoning  2013 drill program focused upgrading Inferred resource at Whitetail LeapFrog ima

  8. Slide 8: Bear Lodge - Significant Value in Critical Rare Earths

    Bear Lodge - Significant Value in Critical Rare Earths Bear Lodge Rare Earth % Distribution by % Of Anticipated Oxides Wt1 Revenues2 Neodymium (Nd) 17.7% 38.4% Europium (Eu) 0.6% 18.5% Praseodymium (Pr) 5.0% 11.3% 78% of Dysprosium (Dy) 0.3% 5.9% Expected Revenues Terbium (Tb) 0.1% 3.0% Yttrium (Y)

  9. Slide 9: CREOs - They are Called Critical For a Reason

    CREOs - They are Called Critical For a Reason  The “seeds of modern technology” – possess unique magnetic, catalytic & phosphorescent properties – Day-to-Day apps include cell phones, TVs & light bulbs – Specialized apps include hybrid cars, solar panels & lasers – US Dept. of Energy, deemed Nd, Pr

  10. Slide 10: Anticipating Growth in Rare Earth Market

    Anticipating Growth in Rare Earth Market  Stockpiles accumulated during price run up are being drawn down – expect to see prices start to firm up  World-wide economic recovery will result in increased demand – Japan is major rare earths user – seeing improving economic grow in 1Q13 – A return to n

  11. Slide 11: Located in Wyoming – A Premier Mining State

    Located in Wyoming – A Premier Mining State  Top ranked mining jurisdiction by the Fraser Institute and Behre Dolbear1  Supports natural resource development – $300 million in state development bonds  Favorable community acceptance – Major coal mining area  Educated and skilled labor force with

  12. Slide 12: Well Developed Existing Infrastructure

    Well Developed Existing Infrastructure  Near Interstate-90 – Excellent access to project  Readily available, low-cost power  Good community support – Over 75% of those polled said they would support project development1  Mine located on land designated for “natural resource development” by the U

  13. Slide 13: Straightforward Recovery Process

    Straightforward Recovery Process Truck & Shovel • Initial production expected to focus on high grade, ramping up to 1,000 tpd Open Pit Operation • Existing resource supports 40+ year mine life at 1,000 tpd Physical Upgrade • Adjacent to mine site Plant (PUG) • Crushing, washing, magnetic separation

  14. Slide 14: Proprietary Process Delivers 90+% Pure Concentrate

    Proprietary Process* Delivers 90+% Pure Concentrate Process increases concentrate grade from original 45% to over 90% Closed system recycles HCl and H2O, reducing raw material costs *Filed for Provisional US Patent 14 14

  15. Slide 15: Well Positioned to Capitalize on Improving Market Conditions

    Well Positioned to Capitalize on Improving Market Conditions  Large identified resource with upside opportunity in inferred resource and identified exploration targets  Project designed to support production up to 1,000 tpd  Mix of critical rare earths complements existing rare earth sources  Lo

  16. Slide 16: NYSE MKT: REE & TSX: RES

    NYSE MKT: REE & TSX: RES 16 16

Rare Element Resources — Sidoti Conference (June 2013) on 6ix