Slide 1: Diversified Industrial Mineral Developer with a Primary Focus on High Purity Silica Sands
INVESTOR DECK 2022 DIVERSIFIED INDUSTRIAL MINERAL DEVELOPER WITH A PRIMARY FOCUS ON HIGH PURITY SILICA SANDS ASX: IND

Slide 2: Disclaimer and Table of Contents
DISCLAIMER This presentation contains summary information about Industrial Minerals Ltd (IND) and is current as of 28 January 2022. The information in this presentation is affected by a range of variables which could cause actual results or trends to differ materially. IND disclaim any intent or obl

Slide 3: About Us: Company Highlights
ABOUT US Diverse product streams for both domestic and export Low CAPEX projects markets COMPANY HIGHLIGHTS Extensive operational Environmentally friendly experienced board and projects management Location, Location & Rigorous & strategic project Location – WA & proximity to selection process infras

Slide 4: High Purity Silica Sands Projects
PROJECT PORTFOLIO HIGH PURITY SILICA SANDS PROJECTS Stockyard Prospect – High Purity Silica Sand Unicup - High Purity Silica Sand • 20km south of VRX Silica’s Arrowsmith project • 180km to Bunbury Port • Concession pre dominantly covers cleared land currently • Historical auger sampling has returned

Slide 5: Project Selection - High Purity Silica Sands
PROJECT PORTFOLIO Tier 1 quality product, >99% SiO2, Low Fe2O3 & Al2O3, optimum size distribution PROJECT SELECTION - HIGH PURITY SILICA SANDS Proximity to haul road & port, majority of OPEX is transport THEMATIC The dynamic of High Purity Silica Sands industry is fast changing. Traditional supplier

Slide 6: Stockyard Silica Sand Project
PROJECT PORTFOLIO STOCKYARD SILICA SAND PROJECT • Located 10km from the town of Eneabba, proximal to Brand Highway to Geraldton and 160km from the Geraldton port • Substantial land package of 270km2 and growing. A further ~200km2 pegged • Targeting high purity silica sand across predominantly cleare

Slide 7: Stockyard – Recent Work
PROJECT PORTFOLIO METALURGICAL TEST WORK • Initial test work undertaken by Intertek Genalysis Perth shows the raw white sand samples taken from ground within the Stockyard Project has exceptional insitu product characteristics and upgrades STOCKYARD – RECENT WORK significantly based on only wet scre

Slide 8: 2022 Plan
PROJECT PORTFOLIO 2022 PLAN IND’s primary objective for 2022 is the rapid development of the Stockyard Project. This will entail achieving key results including: • Assessment and reporting of a Maiden Resource and Scoping Study; • The application and approval of a Mining Lease; • Submission and appr

Slide 9: To Replicate Stockyard Across Project Portfolio
PROJECT PORTFOLIO TO REPLICATE STOCKYARD ACROSS PROJECT PORTFOLIO PROXIMITY TO PROJECT NAME AREA KM 2 LAND ACCESS WORK PROGRAMME & RESULTS PORT (KM) Bookara 1191.2 50 Access agreement signed Soil sample results pending Mount Lefroy 83.7 85 Initial consultation with landholders Sampling Q1 2022 Arrow

Slide 10: High Purity Silica Sands Uses
PROJECT PORTFOLIO HIGH PURITY SILICA SANDS GLASS Float glass, bottle glass, lab glass, Borosilicate glass (food), solar panels & optical glass Electronics and optics products HIGH PURITY INDUSTRIAL Foundry, abrasive, building products SILICA SANDS USES & refractory CHEMICAL Sodium silicate, silicon

Slide 11: Chinese Market
PROJECT PORTFOLIO TYPICAL SPECS FOR CHINESE MANUFACTURERS CHINESE MARKET Classification Silica % Fe2O3 Max Fe2O3 Size Micron (μm) Fiber-optic 99.9-99.99 10-25 25 2-5 • Importing of silica sands is increasing Semiconductor 99.9-99.99 10-25 25 2-5 Electronics 99.9-99.99 10-25 25 2-5 • Domestic supply

Slide 12: Strategic Industrial Minerals Projects
PROJECT PORTFOLIO STRATEGIC INDUSTRIAL MINERALS PROJECTS Lake MacLeod- Gypsum & Salt Roebourne-Aggregate • Adjacent to Rio Tinto’s Lake MacLeod Gypsum and • Located adjacent to Point Samson Salt mining operation • Previous mining for aggregates utilised for railway ballast and other high end enginee

Slide 13: Lake MacLeod Gypsum & Salt Project
PROJECT PORTFOLIO LAKE MACLEOD GYPSUM & SALT PROJECT • Located directly north of Rio Tinto’s Lake MacLeod gypsum & salt operation RESOURCE DEFINITION • Lake MacLeod is the largest evaporite filled coastal salina in the world • Follow up infill and extensional auger drilling program planned • Maiden

Slide 14: Management Team
CORPORATE MANAGEMENT TEAM Ashley Pattison Jeff Sweet Alex Neuling Chairperson Operations Director Non-Executive Director/ Company Secretary Mr Pattison has over 20 years’ experience in the resources Mr Sweet has over 24 years’ quality experience in the quarry, Mr Neuling is a chartered accountant an

Slide 15: Capital Structure
CORPORATE CAPITAL STRUCTURE MARKET CAPITALISATION ASX: IND Based on $0.22 10.12.2021 Total Share on Issues 63.5M 9.75M Options on issue (strike between 30 and 40 cents) ~$4M Cash (approximate) Enterprise value ~$10M Top 20 shareholders ~73% Board & management ~15% 15 ASX: IND

Slide 16: Have Questions?
HAVE QUESTIONS? GET IN TOUCH WITH INDUSTRIAL MINERALS LTD Suite 20, 513 Hay Street Subiaco, WA, 6008 Australia +61 8 6270 6316 | admin@industmin.com www.industmin.com
Source: Internet Archive copy of industmin.com
More decks from Industrial Minerals Limited
Merger or Acquisition (May 2026)13 slides · May 13, 2026
RIU Sydney Resources Round-up 202518 slides · May 2025
RIU Sydney (May 2024)20 slides · May 2024
Investor Presentation (November 2023)20 slides · Nov 8, 2023
RIU Sydney Resources Roundup 202319 slides · May 2023
Investor Presentation (April 2023)18 slides · April 2023