Soltec Power Holdings SA · BME:SOL
Soltec Power Holdings SA — 9M 2023 Earnings Presentation
27 slides from Soltec Power Holdings SA's earnings presentation, Nov 14, 2023

Slide 1: 9M 2023 Trading Update
9M 2023 TRADING UPDATE November 14th, 2023

Slide 2: Agenda
01 9M 2023 Key Highlights 02 Operational Indicators 03 9M 2023 Financial Update 04 Closing Remarks 05 Appendix 9M 2023 TRADING UPDATE Agenda

Slide 3: Key Highlights
01 Key Highlights

Slide 4: Key Highlights
KEY HIGHLIGHTS 9M 2023 CONSOLIDATED CONSOLIDATED REVENUES EBITDA FY 2023 €304.1 Mn €0.6 Mn GUIDANCE 9M 2023 9M 2023 CONFIRMED €119.6 Mn €10.8 Mn Q3 2023 Q3 2023 €329 Mn €16,971 Mn +8.6% EBITDA MARGIN BACKLOG PIPELINE Q3 2023 INDUSTRIAL 433 MW 200 MW 29.4 MW NEW CONSTRUCTION PPA ASSETS ROTATED (3) AU

Slide 5: Operational Indicators
QO2 Operational Indicators

Slide 6: Soltec at a Glance
SOLTEC AT A GLANCE BUSINESS AND GEOGRAPHICAL DIVERSIFICATION EUROPE 573 MW 5,926 MW INDUSTRIAL DEVELOPMENT USA 25 MW 5 MW CONSTRUCTION (4) OPERATION (3) 293 MW 100 MW INDUSTRIAL DEVELOPMENT 2 PRODUCTION 1 LOGISTIC FACILITIES (1) CENTER(2) 1 LOGISTIC CONTRIBUTION TO REVENUES CENTER (2) 27% CONTRIBUTI

Slide 7: Soltec Industrial
SOLTEC INDUSTRIAL CONTRACTS SIGNED 71 3.5 403 CONTRACTS SIGNED January-November 2023 (1) GW € Mn STRONG VALUE PROPOSITION OF SOLAR TRACKERS MW • Energy prices and the increasing demand for solar energy, together with the 4000 increasing production of trackers versus fixed tilt installations (+15%-25

Slide 8: Soltec Industrial: Operational Indicators
SOLTEC INDUSTRIAL OPERATIONAL INDICATORS BACKLOG(1)(2) +68% +49% €329 Mn +49% +14% BACKLOG SEP 2023 €289 €329 +1.5 GW Mn €221 Mn 1,402 Mn 2,094 MW + NEW CONTRACTS Orders to be closed before 1,245 year end, in markets with local MW MW €117 Mn production capabilities Mar 2023 Jun 2023 Sep 2023 CONTRAC

Slide 9: Soltec Industrial: Backlog and Pipeline by Region
SOLTEC INDUSTRIAL OPERATIONAL INDICATORS €329 Mn €16,971 Mn BACKLOG PIPELINE EUROPE NORTH AMERICA SPAIN AZERBAIJAN NA (1) UNITED STATES MEXICO Backlog: €119 Mn Pipeline: €29 Mn 28% Backlog: €91 Mn Pipeline: €1 Mn Pipeline: €2,272 Mn LATAM ARMENIA 30% Pipeline: €5,293 Mn CANADA ITALY Pipeline: €20 Mn

Slide 10: Soltec Development 14 GW
SOLTEC DEVELOPMENT 9M 2023 PLATFORM UNDER DEVELOPMENT TECHNICAL AND LOCAL 468 MW Total: 65% A QUALITY ENGINEERING PARTNERSHIPS in Spain Soltec: 35% Existing co-development partnerships with leaders in PLATFORM Lean Development platform the market. Soltec Development remains as developer 1.2 GW Aquil

Slide 11: Soltec Development: Pipeline Evolution
SOLTEC DEVELOPMENT PIPELINE EVOLUTION Projects mainly located in Italy & Spain: BACKLOG ADVANCED STAGE • Italy: 2,204 MW MW/year MW/year • 1,284 MW expected RTB in 2024. • 488 MW in the Backlog, correspond to • 57% in co-development with Aquila and projects in Brazil, at RTB status. (5%) 23% with AC

Slide 12: Soltec Assets: Capacity
SOLTEC ASSETS CAPACITY CAPACITY UNDER OPERATION 303 MW 255 MW Pedranópolis Araxá La Asomada (1) 48 MW 112.5 MW 112.5 MW 4.5 MW 117 MW 230 MW CAPACITY UNDER CONSTRUCTION La Isla (1) Los Valientes I & II (1) Totana IV 138 MW 4.5 MW 14.9 MW 5.5 MW 25 MW 2022 Sep 2023 CAPACITY PRE- CONSTRUCTION Capacity

Slide 13: Soltec Assets: Capacity Under Operation
SOLTEC ASSETS CAPACITY UNDER OPERATION PEDRANÓPOLIS(1) ARAXÁ(1) LA ASOMADA(2) KEY PROJECT DATA KEY PROJECT DATA KEY PROJECT DATA Location Sao Paulo (Brazil) Location Minas Gerais (Brazil) Location Murcia (Spain) Capacity 112.5 MWp Capacity 112.5 MWp Capacity 4.5 MWp Net Energy Generated Net Energy G

Slide 14: Soltec Assets: Capacity Under Construction
SOLTEC ASSETS CAPACITY UNDER CONSTRUCTION LA ISLA(1) LOS VALIENTES I Y II(1) TOTANA IV KEY PROJECT DATA KEY PROJECT DATA KEY PROJECT DATA Location Murcia (Spain) Location Murcia (Spain) Location Murcia (Spain) Capacity 4.5 MWp Capacity 14.9 MWp Capacity 5.5 MWp Net Energy Generated 2,075 Net Energy

Slide 15: Soltec Assets: Capacity Pre-Construction
SOLTEC ASSETS CAPACITY PRE-CONSTRUCTION ALUMBRES(1) EL ROMERAL I Y II(1) FUENTE ÁLAMO I Y II(1) KEY PROJECT DATA KEY PROJECT DATA KEY PROJECT DATA Location Murcia (Spain) Location Murcia (Spain) Location Murcia (Spain) Capacity 8.2 MWp Capacity 20.0 MWp Capacity 19.9 MWp KEY DEVELOPMENT PERMITS KEY

Slide 16: Financial Update
OK: Financial Update

Slide 17: 9M 2023 Financial Update
9M 2023 FINANCIAL UPDATE SOLTEC POWER HOLDINGS CONSOLIDATED RESULTS (1) € Mn 9M 23 9M 22 23 vs.22 • Increasing quarterly demand driving healthy volumes in Q3 and Q4. Revenues 304.1 403.4 (99.3) • EBITDA margins rose to 9% in Q3 2023 and 1% in the 9M, increasing versus previous quarters, mainly due t

Slide 18: 9M 2023 Financial Update: Soltec Industrial
9M 2023 FINANCIAL UPDATE SOLTEC INDUSTRIAL(1) € Mn 9M 23 9M 22 23 vs.22 Strong orders and good visibility for coming months • € 329 Mn Backlog, expected to be recognized in the coming months. Revenues 291.0 423.4 (132.5) Revenues well diversified by client and also by country: Adj. EBITDA(1) 2.4 6.6

Slide 19: 9M 2023 Financial Update: Soltec Development
9M 2023 FINANCIAL UPDATE SOLTEC DEVELOPMENT € Mn 9M 23 9M 22 23 vs.22 • 9M 2023 Asset rotation : 432.5 MW Adj. EBITDA Proforma(1) (2) (5.6) 5.2 (10.8) • 302.5 MW rotated to Soltec Assets in 2023: • Araxá (Brazil): 112.5 MW • Pedranópolis (Brazil): 112.5 MW QUARTERLY EVOLUTION • La Asomada (Spain): 4

Slide 20: 9M 2023 Financial Update: Soltec Assets
9M 2023 FINANCIAL UPDATE SOLTEC ASSETS € Mn 9M 23 9M 22 23 vs. 22 • Financing secured: Revenues 7.6 N/A N/A • Successful equity raise of €100 Mn in 2023. • New financing agreement in Spain for 5.59 MW: Adj. EBITDA(1) 5.5 N/A N/A • Project finance 3.6 Mn € + 550,000 € from local communities. • This i

Slide 21: Closing Remarks
04 Closing Remarks

Slide 22: Turning Point in Q3 2023
TURNING POINT IN Q3 2023 TURNING POINT IN • €329 Mn BACKLOG +113% POTENTIAL (vs. T.P.) EBITDA MARGINS • €16,971 Mn PIPELINE AND INCREASING • +8.6% EBITDA MARGINS IN Q3 Share price versus target price VOLUMES UNIQUE • FINANCING AGREEMENT FOR 5.6 MW FINANCING IN SPAIN • SENIOR DEBT + LOCAL INVESTMENT

Slide 23: Appendix
05 Appendix

Slide 24: Alternative Performance Measures
ALTERNATIVE PERFORMANCE MEASURES EBITDA ADJUSTED EBITDA Net Margin + Other operating income - Losses, impairment EBITDA + Losses, impairment losses and changes in provisions losses and changes in provisions for trading operations for trading operations EBITDA is considered by the group’s management

Slide 25: Disclaimer
DISCLAIMER This document has been prepared by Soltec Power Holdings, S.A. (“Soltec”) exclusively for use during the trading update for the nine-month period ended on September 30th, 2023. Therefore, this document may not be disclosed or published, nor used by any other person or entity, for any othe

Slide 26: Disclaimer
DISCLAIMER This document contains certain financial measures of the Company that are not based on International Financial Reporting Standards (IFRS), but rather on its accounting records, which the Company considers as alternative performance measures (APMs) for the purposes of Commission Delegated

Slide 27
Source: Internet Archive copy of soltec.com
More decks from Soltec Power Holdings SA
H1 2026 Earnings Presentation26 slides · September 2026
H1 2026 Earnings Presentation26 slides · September 2026
FY2025 Earnings Presentation37 slides · Mar 26, 2026
H1 2024 Earnings Presentation54 slides · Feb 27, 2025
Investor Presentation (April 2024)54 slides · April 2024
FY2023 Earnings Presentation31 slides · Apr 1, 2024