Lodestar Minerals Limited · ASX:LSR
Lodestar Minerals — Shareholder Meeting (November 2012)
17 slides from Lodestar Minerals's shareholder meeting presentation, Nov 27, 2012
Slide 1: Annual General Meeting Presentation
ASX ANNOUNCEMENT 27 November 2012 For personal use only COMPANY ter text here SNAPSHOT LODESTAR MINERALS LIMITED ANNUAL GENERAL MEETING PRESENTATION ABN: 32 127 026 528 CONTACT DETAILS Bill Clayton, Managing Director +61 8 9481 5455 Please find attached a copy of the presentation given by the Compan
Slide 2: Presentation to Annual General Meeting 27th November 2012
For personal use only Presentation to Annual General Meeting 27th November 2012
Slide 3: Disclaimer
Disclaimer For personal use only Forward Looking Statements Forward Looking Statements: This document may include forward‐looking statements. Forward‐looking statements include, but are not limited to, statements concerning Lodestar Minerals’ exploration program and other statements that are not his
Slide 4: Contents
Contents For personal use only Strategy Project Summary Peak‐Hill‐Doolgunna Little Well Neds Creek Brumby Halls Creek Work Program Summary Corporate Summary
Slide 5: Strategy
Strategy For personal use only Location ‐ projects located in regions of base metal and gold endowment & infrastructure Under‐explored terrains Sustained high levels of exploration investment in the region Leveraged to exploration success
Slide 6: Advancing Base Metal and Gold Projects in Western Australia
Advancing Base Metal and Gold Projects in Western Australia For personal use only Peak Hill‐Doolgunna ‐ Key Project (Cu‐Au) Base Metal & Gold Endowment and Production Centre Large strategic landholding Multiple targets – Neds Creek, Marymia and Western tenement blocks Halls Creek Project (Ni‐C
Slide 7: Regional Overview – Peak Hill-Doolgunna
Regional Overview – Peak Hill- Doolgunna For personal use only Location ‐ Jenkin Thrust Zone & McDonald Well Fault Proximity to recent discoveries in similar geological terrain Developing exploration targets – basin margins, structures & domain boundaries Largest land position on key regional
Slide 8: Tectonic Margins - Key to Base Metal Exploration in the Yerrida Basin
Tectonic Margins - Key to Base Metal Exploration in the Yerrida Basin For personal use only DeGrussa and Thaduna: base metal camps developing at tectonic margins to the Yerrida Basin Jenkin and McDonald Well Faults define northern and eastern tectonic margins Global precedents for development
Slide 9: Neds Creek – Part of the Thaduna Camp
Neds Creek – Part of the Thaduna Camp For personal use only TECTONIC MARGIN Eastern margin of the Yerrida Basin Growth fault ‐ a focus for hydrothermal fluids MAJOR MINERAL SYSTEM Fault‐controlled mineralisation is characteristic of the Thaduna Camp McDONALD WELL PROSPECTS Copper anomalies
Slide 10: Little Well - Copper Target
Little Well - Copper Target For personal use only Copper gossan identified 3.6km SE of Thaduna ‐ extensive Cu anomalies in rock samples Situated on major structural ENE break within de‐magnetised zone – chl‐ haem alteration on margins Hydrothermal breccia association with rock samples reportin
Slide 11: McDonald Well – Copper Targets
McDonald Well – Copper Targets For personal use only McDonald Well North 1600m x 800m ‐ blanket Cu anomaly in drilling Multi‐element lag signature Adjacent to regional structural break Breccia Hill 800m x 200m Cu‐Zn anomaly extending over McDonald Well Fault Evidence of hydrothermal ve
Slide 12: Brumby - A New Gold Target
Brumby - A New Gold Target For personal use only Brumby 900m x500m lag Au anomaly Faulted granite contact with adjacent quartz veining in deformed granite Visible gold observed in rock samples Geological and metal association similar to Plutonic Well GB deposits Magnetics suggest greenst
Slide 13: Exploration Program – Neds Creek
Exploration Program – Neds Creek For personal use only Little Well Prospect EM survey in progress POW and Heritage Approvals First stage aircore drilling planned RC drilling McDonald Well and Breccia Hill Prospects More targets being identified POW and Heritage Approvals Aircore/RC
Slide 14: Halls Creek Project
Halls Creek Project For personal use only 2012 Program First drilling of EM targets 9 Targets – 11 RC holes 3 Targets intersected disseminated Ni‐Cu sulphides (>0.5% Ni of 1‐2m thickness) within thicker low grade mineralisation Targeting Mineralisation occurs along western contact of Cor
Slide 15: Work Program Summary
Work Program Summary For personal use only Peak Hill‐Doolgunna Neds Creek Little Well Drilling scheduled for December quarter Brumby Additional sampling & mapping ‐ rapid advancement to drill targeting In‐fill Brumby to Contessa contact zone McDonald Well Continued target generatio
Slide 16: Corporate Overview
Corporate Overview For personal use only ASX code LSR Issued Capital (after placement 221 million shares and rights issue) 4.75 million unlisted options Cash (after placement @ 3.5 cents) $1.7M After rights issue (fully subscribed) $4M Market capitalisation @ 4.5 $6.0 million cents Top 20 Shareholde
Slide 17: For personal use only
For personal use only November 2012
Lodestar Minerals — Shareholder Meeting (November 2012) on 6ix