LCL Resources Limited · ASX:LCL
LCL Resources — Metminco — Investor Presentation (July 2010)
46 slides from LCL Resources's investor presentation, July 2010
Slide 1: Corporate presentation July 2010
Corporate presentation July 2010
Slide 2: Disclaimer
Disclaimer Metminco Limited (the Company) has prepared this presentation based on information available to it. Each recipient of this presentation is deemed to have agreed to accept the qualifications, limitations and disclaimers set out below. To the maximum extent permitted by law, none of Metminc
Slide 3: Metminco – background
Metminco – background • Hampton Mining Limited (Hampton) started operations in Chile in 2006, now has suite of 6 projects: one in Peru and 5 in Chile. • Hampton has strong business relationships in Chile/Peru, head office in Santiago. • Metminco (MNC) listed on ASX in 2007, in late 2008 bid for Hamp
Slide 4: Metminco – capital structure
Metminco – capital structure Highland Holdings Resources Inc 150,000,000 18.5% Junior Investment Company 132,787,500 16.3% Other shareholders 529,408,441 64.2% Total issued shares (ASX & AIM: MNC) 812,195,941 100.0% Total issued options (ASX:MNCO) 27,230,017 Convertible Notes – USD 4 million * * Con
Slide 5: Investment summary: value adding strategy
Investment summary: value adding strategy (all projects held by approx. 70% owned Hampton Mining) • Exploration – Advanced exploration : major Cu-Mo porphyry discovery at Los Calatos, far south coastal Peru, near large existing mines, within world class Cu-Mo porphyry belt • Total resources 926mt at
Slide 6: Projects (Hampton) – by stage and potential scale
Projects (Hampton) – by stage and potential scale? Chile Peru Notes: Los Calatos (Cu-Mo) (1) Vallecillo: Total current resources (Total current resources ~ 4.72mt ~ 0.125mt contained CuEq contained CuEq, at cutoff 0.2% Cu) (cutoff 0.3 g/t Au) (2) Mollacas: Total current resources ~ 0.09mt contained
Slide 7: Hampton Mining projects map
WAJONE! Cc u-Mo_ mines Jet Oe” proiecte Moquegua 4 i << Yer MOQUEPALA’Cu- Mo mine. Huasce?, Freirina Scale ~~(@)VALLENAR = Spfte del Carmen 100 km = a Valeriano Oo ISIDRO (Cu,Au) isla Choros tsta eel {O VALLECILLO (Au, Zn) ianee ‘Comber LOICA (Cu,Mo) r AETMINCO _ CAMARON (Au) > MOLLACAS (Cu) Los CAL
Slide 8: Explore
Adding value.... Explore 7
Slide 9: Los Calatos Cu-Mo porphyry: Emerging as world class discovery
Los Calatos Cu-Mo porphyry: Emerging as world class discovery Highlights : major Cu-Mo discovery in attractive location • Tenements: 230 km2. Hampton owns 100% of 202 km2, option on 28 km2 • Total resources 926mt at 0.37% Cu and 0.027% Mo, 0.51% CuEq, contains 4.72 mt CuEq (cutoff 0.2% Cu, copper eq
Slide 10: Los Calatos Cu-Mo porphyry: Geological model
Los Calatos Cu-Mo porphyry: Geological model Main Los Calatos geology and mineralising events: 1. The earliest porphyry regional in extent and not mineralised. 2. The second phase of porphyry injection ¨stoped out¨ most of the original porphyry and was accompanied by a low grade copper mineralising
Slide 11: Los Calatos grade-tonnage curve (June 2010)
Los Calatos Cu-Mo porphyry - grade-tonnage curve (June 2010) Indicated Resources Inferred Resources Total Cutoff Tonnage Cu Mo Tonnage Cu Mo Tonnage Cu Mo %Cu (´000) % % (´000) % % (`000) % % 0.3 64 0.49 0.049 464 0.47 0.032 528 0.47 0.034 0.25 86 0.43 0.044 594 0.43 0.030 681 0.43 0.032 0.2 111 0.3
Slide 12: Los Calatos Cu-Mo porphyry: Questions?
Los Calatos Cu-Mo porphyry: Questions? • Tonnage? Exploration at very early stage • Only ~ 21,000 metres drilling to date • Small area drilled (~ 900m x 500m), within large NW-SE surface anomalism, > 10km x 5km, despite recent volcanic cover • Located in same porphyry belt as three large existing Cu
Slide 13: Los Calatos Cu-Mo porphyry: Action, planned activity
Los Calatos Cu-Mo porphyry: Action Planned activity • 50,000 metre drill program (phase 3 of drilling) to: • Extend existing resources • Step out: drill test some of other 7 current exploration targets • Geophysics, to help refine drill targets • Ongoing surface mapping and sampling • Further metall
Slide 14: Los Calatos Cu-Mo porphyry: favourable location
Los Calatos Cu-Mo porphyry: favourable location 13
Slide 15: Los Calatos tenements, eight current targets
Los Calatos Cu-Mo porphyry: tenements, eight current targets
Slide 16: Views at Los Calatos
Views at Los Calatos (a) ABOVE: east, across drilled area, (b) BELOW: southeast across target 4 15
Slide 17: Los Calatos E-W longitudinal section, July 2010
Los Calatos Cu-Mo porphyry: E-W longitudinal section, July 2010 16
Slide 18: Los Calatos N-S cross section (286,500E)
Los Calatos Cu- Mo porphyry: N-S cross section (286,500E) 17
Slide 19: Los Calatos N-S cross section (286,600E)
Los Calatos Cu-Mo porphyry: N-S cross section (286,600E) 18
Slide 20: Build mines
Adding value.... Build mines 19
Slide 21: Mollacas Cu porphyry: Cu leach-SX-EW project in pre-feasibility
Mollacas Cu porphyry: Cu leach-SX-EW project in pre-feasibility Background: Hampton Mining owns 50% • Tenements 32.55 sq.km • Classic Cu-Au porphyry with enriched (supergene) Cu zone near surface • Underlying porphyry Cu-Au primary mineralisation Location / permitting: well located • Well located fo
Slide 22: Mollacas Cu leach SXEW project
Mollacas Cu leach SXEW project View to SE across Mollacas deposit, towards main east – west valley. Mollacas deposit Leach heaps planned for foreground smaller north-south valley 21
Slide 23: Mollacas surface geology
Mollacas Cu leach SXEW project : surface geology Limit of leachable ore Scale = 200m 22
Slide 24: Vallecillo breccia / porphyry: possible Au-Zn production
Vallecillo breccia / porphyry: possible Au-Zn production Background: Hampton Mining owns 50% • Tenements 54 sq.km • Porphyry related breccia with high grade veins Location / permitting: well located • Good access, near infrastructure, power, water • Access agreement in place La Colorada deposit: Au-
Slide 25: Vallecillo Au-Zn project: La Colorada deposit
Vallecillo Au-Zn project : La Colorada deposit Scale = 200m View to SW across drilled La Colorada deposit Mineralisation shell (Au > 0.2 g/t), and drillholes, looking SW La Colorada: Surface geology & drill holes 24
Slide 26: Vallecillo: seven current exploration targets
Vallecillo Au-Zn La Colorada deposit (JORC resources) project: seven current exploration targets (Pb/Au/Cu) Scale = 2 km 25
Slide 27: Other exploration
Adding value.... Other exploration 26
Slide 28: Camaron Au project: Large untested low sulphidation epithermal Au system
Camaron Au project: Large untested low sulphidation epithermal Au system Background • Hampton owns 100% of 100km2; and option to acquire 100% of Genesis areas, 30km2 • Well located: moderate elevation and easy access Geology • Large anomalous untested low sulphidation Au system • Large hydrothermal
Slide 29: Camaron Au project: gold anomalies
Camaron Au project: large low sulphidation epithermal Au system Gold anomalies (within dashed boundaries) Scale = 2 km 28
Slide 30: Isidro Cu-Au project: large untested Cu-Au mantos
Isidro Cu-Au project: large untested Cu-Au mantos Background: Hampton own / option • Hampton Mining Mining owns 100% of main tenements and 50% of the San Lorenzo tenements • Over 250 sq km of tenements • Located immediately north of Camaron project • Well located for development Geology: large anoma
Slide 31: Loica Cu-Mo porphyry: Large lower grade Cu-Mo system
Loica Cu-Mo porphyry: Large lower grade Cu-Mo system • Hampton Mining owns 50% Loica • Cu – Mo porphyry system, approximately 4 km long, north-south • Tenements 35 sq.km • Loica with initial Hampton deal in January 2006 • Hampton drilling of upper part of Loica system in 2007 intersected long widths
Slide 32: Appendices
Al —— — Appendices <
Slide 33: Corporate structure – project ownership
Corporate structure – project ownership METMINCO LIMITED Approx. 70% 100 % HAMPTON MINING LIMITED NORTH HILL Option to acquire 100% Pre-mining : Mollacas (50%) Vallecillo (50%) Los Calatos Exploration: Loica (50 %) Late Stage Exploration Camaron (100%) (28 sq km) 100% Isidro (100% - 50% San Lorenzo)
Slide 34: Corporate structure - detailed
Corporate structure - detailed 100% Metminco Limited Minera MNC SAC (Chile) (ASX and AIM listed, code MNC) Notes: (1) If Minera Cerro Norte SA / Minera CN SAC MNC Peru - TBA undertakes a study (scoping or feasibility) and 1 million tons of copper equivalent metal contained within the Gamma, Nelson a
Slide 35: Summary - Hampton Projects
Summary - Hampton Projects Project Interest Geology Resources - current Comment Feasibility study Mollacas (Cu-Au) 50%, tenements 32.5 sq.km; Weathered Cu-Au porphyry JORC Indicated & Inferred: Scoping Study (2008) for CHILE 17.0mt @ 0.54% Cu (leach). 13,500tpa leach SXEW, opex Containing 92,000 ton
Slide 36: History / Corporate Milestones
History / Corporate Milestones Projects Corporate Funding 2005 Contact with Chilean interests 2006 Drilled Mollacas / Vallecillo / Loica Hampton 50% ownership agreement with Hampton raises ~ A$13m seed capital JORC resources for Mollacas and Chilean partner, re 3 projects in 2006 & 2007 (including r
Slide 37: Board & Management
Board & Management Executive William Howe (Santiago) Director, 30 years experience in production, mine construction and management and exploration Colin Sinclair (Santiago) GM Exploration, 40 years experience; GM for North Ltd in South America and North Parkes Cu-Au porphyry development, Chief Geolo
Slide 38: Country jurisdictions: low political risk
Country jurisdictions: low political risk • Operating in politically stable regions of the world with well understood legal and commercial processes for mining companies • Chile scores 80 and Peru 57 in latest Fraser Institute survey of mining risk* • Services of leading resources law firm in Santia
Slide 39: Adding value… by exploration
Adding value… by exploration • Los Calatos Cu-Mo porphyry project: • Tenements 230km2: Hampton owns 100% of 202km2, preparing to exercise an option over 100% of 28km2 • Current (revised) JORC resources: 926 mt at 0.51% CuEq (at cutoff grade of 0.2% Cu. Copper equivalence assumes ratio Mo/Cu prices o
Slide 40: Adding value… building mines
Adding value… building mines • Mollacas and Vallecillo • Hampton owns 50% of each • JORC resources • Small contribution to MNC’s current market capitalisation: A$10- 20 million?? • ADD VALUE – BUILD MINES • Mollacas: copper leach-SXEW operation, ~ 13,500 tonnes Cu pa • Vallecillo: gold-zinc gravity
Slide 41: Los Calatos: September 2007 Hampton signs agreement
Los Calatos Cu-Mo porphyry: September 2007 : Hampton signs agreement What we knew then • Hampton Mining (‘Hampton’) signs option agreement on 28km2 of tenements • Past drilling: • Mid 1990s drilling by Phelps Dodge & Barrick Gold • Approx 6,254 metres, RC and core, included: • Hole DDH 04, 712 metre
Slide 42: Los Calatos: January 2009 initial resources estimate
Los Calatos Cu-Mo porphyry: January 2009 : initial resources estimate Action • April 2008: Hampton gained funding injection, US$20 million from JIC (Chile) • November 2008 – January 2009: Hampton phase 1 drilling, 13 core holes / 6,387 metres Outcome • Resources – January 2009, initial resources est
Slide 43: Los Calatos: June 2010 revised resources estimate
Los Calatos Cu-Mo porphyry: June 2010 : revised resources estimate Action • November 2009 – March 2010: Hampton phase 2 drilling, 10 core holes / 9,516 metres, for ~ 15,900 metres total drilling by Hampton • Early 2010: preliminary metallurgical testing: flotation tests based on composite samples fr
Slide 44: Los Calatos: regional setting
Los Calatos: regional setting . Porphyry deposits typically occur in clusters or belts. The Calatos project is located in the Moquegua district of Southern Peru, within a major Paleocene / early Eocene belt of copper-molybdenum porphyry deposits (mineralization approximately 55 million years old): •
Slide 45: Los Calatos: comparative grades for Cu-Mo porphyry deposits
Los Calatos: comparative grades for Cu-Mo porphyry deposits - cutoff grade: 0.2% Cu / CuEq - ratio of Mo price to Cu price of 5, assumed for CuEq (copper equivalent) grades Measured Resources Indicated Resources Inferred Resources Total Resources Cutoff Ratio Ratio Ratio Ratio Deposit grade Mo CuEq
Slide 46: Corporate Directory
Corporate Directory www.metminco.com.au LONDON SYDNEY OFFICE SANTIAGO, CHILE OFFICE 119 Willoughby Rd, 4001 Av. Apoquindo, Las Condes Crows Nest, NSW 2065, Australia Santiago, Chile Ph: +61 (2) 9956 3845 Ph: +56 (2) 411 2600 Fax: +61 (2) 9439 2157 Fax: +56 (2) 411 2610 Contacts: Contacts: Contacts: