Slide 1: Advancing the Earaheedy Zinc-Lead-Silver Discovery
Advancing the Earaheedy Zinc-Lead-Silver Discovery ‘Tier 1’ Sedex Style Potential and Pipeline of Projects June 2021 WWW.RUMBLERESOURCES.COM.AU ASX: RTR | PAGE 1
Slide 2: Pipeline of Projects Strategy
Pipeline of Projects Strategy Multiple Avenues to World Class Discoveries Clear Strategy Discovery History Near Term Catalysts • Generate a pipeline of projects at various Technical Director Brett Keillor • Scoping Earaheedy Zn-Pb-Ag Discovery stages of development • Discovered multiple deposits tha
Slide 3: Corporate Overview
Corporate Overview Capital Structure RTR 12 month share price chart Shares on Issue # 612m Unlisted Options on Issue 1,2 # 24.6M Cash3 A$ $43.3m Market Cap *as at 31 May A$ $330m 1. 9.55mil 15c Options (Various Expiry) 2. 15mil Performance Options Vesting 20c, 30c, 40c, 50c, $1 & $2 3. Cash position
Slide 4: Earaheedy Zn-Pb-Ag Discovery Tier 1 Sedex Type Scale Potential
Earaheedy Zn-Pb-Ag Discovery Tier 1 Sedex Type Scale Potential • Granted E69/3464 Rumble 75% / Zenith Minerals Ltd (ASX: ZNC) 25% • Application E69/3787 - Contiguous to E69/3464 is held 100% by RTR • Major Zn-Pb-Ag Discovery at Chinook prospect announced 19th April 2021 intersecting 34m @ 4.22% Zn-P
Slide 5: Chinook Zn-Pb-Ag Discovery Section AA
Chinook Zn-Pb-Ag Discovery Section AA • Section over 600m wide and up to 34m vertical (true thickness) – open • Inferred multiple higher grade Zn-Pb-Ag extension feeder faults (Sedex variant style) • Extension feeder faults strike N/NW and mineralisation dips shallow to N/NE ASX: RTR | PAGE 5
Slide 6: Chinook Zn-Pb-Ag Discovery Geology, Structure and Intercepts
Chinook Zn-Pb-Ag Discovery Geology, Structure and Intercepts • Zn-Pb mineralisation (3:1 average) flat lying, confirmed over 2km x 1.2km grid, up to 34m true width – all holes mineralised & open • Interpretation based on geological and airborne magnetics is Zn-Pb-Ag grades increase significantly nea
Slide 7: Chinook Zn-Pb-Ag Discovery Extension Feeder Faults
Chinook Zn-Pb-Ag Discovery Extension Feeder Faults • Each inferred north/north west extension feeder fault has the potential to develop higher-grade Zn-Pb- Ag zones over the length of the planes - Chinook has a multitude of extension faults over km’s of strike • Mineralisation dips shallow to north/
Slide 8: Magazine Zn-Pb-Ag Prospect Feeder Structures and Intercepts
Magazine Zn-Pb-Ag Prospect Feeder Structures and Intercepts • The style of mineralisation at Magazine Prospect is similar to Chinook • Zn-Pb grades increase significantly near interpreted inferred extension feeder faults • Each inferred north north/west extension feeder fault has the potential to de
Slide 9: Earaheedy Zn-Pb-Ag Discovery Geological Model – Tier 1 Sedex Variant Type
Earaheedy Zn-Pb-Ag Discovery Geological Model – Tier 1 Sedex Variant Type Mineralisation includes: • Associated Manganese (up to 26.6%) and Silver (up to 46.9 g/t) with main Zinc-Lead mineralisation Note: Historic intercept 4m @ 559g/t Ag highlights the potential for much higher silver grades • Dist
Slide 10: Earaheedy Zn-Pb-Ag Discovery Tier 1 Scale Potential – Sedex Type
Earaheedy Zn-Pb-Ag Discovery Tier 1 Scale Potential – Sedex Type • Sedex deposits accounts for 25% of Zn-Pb production and 50% of Zn & Pb reserves globally1 • Sedex deposits form Giant and Super Giant Tier 1 Deposits3 • 6 of the 10 largest active zinc mines globally are Sedex type deposits2 ASX: RTR
Slide 11: Earaheedy Zn-Pb-Ag Discovery First Stage Exploration Target
Earaheedy Zn-Pb-Ag Discovery First Stage Exploration Target Rumble’s Zn-Pb first stage exploration target at the Earaheedy Project is between 40 to 100 million tonnes at a grade ranging between 3.5% Zn-Pb to 4.5% Zn-Pb. The exploration target is at a shallow depth (80m), and over 45kms of prospectiv
Slide 12: Earaheedy Zinc-Lead-Silver Discovery Summary
Earaheedy Zinc-Lead-Silver Discovery Summary ❖ Major 30,000 Metre Drill Program Commenced ❑ 1 Diamond Rig – Geology and Metallurgy ❑ 3 RC Drill Rigs – Scope and Discover ❖ Gravity Program Completed – Interpretation pending ❖ Management Discovered and Defined Large Scale Mines ❖ First Goal – Upper Le
Slide 13: Rumble Contacts – Thank You
Rumble Contacts – Thank You Shane Sikora, Managing Director https://twitter.com/RumbleResources E: info@rumbleresources.com.au Web: www.rumbleresources.com.au https://www.linkedin.com/company/ rumble-resources-ltd ASX: RTR | PAGE 13
Slide 14: Disclaimer
Disclaimer Disclaimer; ▪ This presentation has been prepared by Rumble Resources Limited (Rumble or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete
Slide 15: Appendix – Pipeline of Projects
Appendix – Pipeline of Projects ASX: RTR | PAGE 15
Slide 16: Western Queen Project – High-Grade Au System
Western Queen Project – High-Grade Au System 2.7km of Au Mineralisation and Open Western Queen Project (100% RTR) • Located within a 110km radius of three operating gold processing mills • WQ North-South Greenstone hosted Shear Zone 35km in length – Untested • Maiden Resources Estimate Underway West
Slide 17: Thunderstorm JV & Thunderbolt Projects - Tier 1 Fraser Range Au Targets
Thunderstorm JV & Thunderbolt Projects - Tier 1 Fraser Range Au Targets Thunderstorm JV Project (IGO 70% RTR 30%) • Reconnaissance AC drilling 1.5km by 400m intersected widespread gold throughout the project including high-grade gold at Themis: o 16m @ 6.69 g/t Au from 42m (20AFAC11321) o 6m @ 9.15
Slide 18: Fraser Range Ni-Cu Targets
Thunderdome JV Project – Tier 1 Fraser Range Ni-Cu Targets Thunderdome JV Project (IGO 70% RTR 30%) Sailfish Ni-Cu Tier 1 Targets • Magnetic low/gravity high features conceptual targets analogous of Legend Mining’s Mawson Ni-Cu discovery (Located 30km NE along trend) Old Soldiers Ni-Cu-Zn Tier 1 Tar
Slide 19: Lamil JV Project – Tier 1 Paterson Province Au-Cu Targets
Lamil JV Project – Tier 1 Paterson Province Au-Cu Targets Lamil JV Project (RTR 100% - AIC Earning up to 65%) • AIC Mines can earn 50% interest by spending $6 million at Lamil over 4 years, Thereafter AIC can earn a further 15% by spending $4 million over 1 year if Rumble does not elect to contribut
Slide 20: Munarra Gully Project Large Scale Au-Cu-Ag Targets
Munarra Gully Project Large Scale Au-Cu-Ag Targets Munarra Gully Project Amaryllis Prospect (100% RTR) ▪ Over 2300m of Au-Cu-Ag mineralised strike confirmed ▪ Open in all directions ▪ Au-Cu-Ag in wide alteration zones up to 50m true width ▪ Strong strike and dip length continuity of Au-Cu-Ag Signifi
Slide 21: Braeside Project – Large Scale System 45 Priority Cu-Au-Zn-Pb-Ag Targets
Braeside Project – Large Scale System 45 Priority Cu-Au-Zn-Pb-Ag Targets Braeside Project (70% RTR) • Regional Scale Porphyry, Epithermal and VMS mineralisation from surface • Large-scale mineralised system over 60km in strike and 8km in width • Discovery of shallow high-grade galena from surface at
Slide 22: Braeside Project – Barker Well Prospect High-Grade Pb-Zn-Ag Breccia Pipes
Braeside Project – Barker Well Prospect High-Grade Pb-Zn-Ag Breccia Pipes High-Grade Lead-Zinc-Silver Discovery • High-Grade Assays include: o 4m @ 18.63% Pb, 1.72% Zn, 11.7 g/t Ag from 17m (BRRC158) ⃰ o 6m @ 10% Pb, 0.87% Zn, 7.5 g/t Ag from 27m (BRRC159) ⃰ o 2m @ 6.76% Pb from 15m (BRRC161) ⃰ o 2m
Slide 23: Braeside Project – Camel Hump Prospect Potential Large Scale Cu VMS Province
Braeside Project – Camel Hump Prospect Potential Large Scale Cu VMS Province New Copper Discovery • New copper discovery confirmed with shallow RC results: o 35m @ 0.55% Cu from 8m (CHRC010) ⃰ Including: 8m @ 1% Cu from 11m & 5m @ 1.02% Cu from 36m o 37m @ 0.46% Cu from 19m (CHRC011) ⃰ Including: 5m
Slide 24: Warroo Project Potential Large Scale Cu VMS Province
Warroo Project Potential Large Scale Cu VMS Province Warroo Project (RTR 100 %) • Copper and zinc anomalism is associated with bimodal (felsic to mafic) volcanics and associated volcaniclastics/sediments of the Warroo Hill Member Synform. • Over 18km of highly prospective strike under shallow sand c
Slide 25: Pipeline of Project Strategy Upcoming Catalysts on other Projects
Pipeline of Project Strategy Upcoming Catalysts on other Projects Gold Resources ❖ Maiden Gold Resources at Western Queen Project JV Partners Advancing Tier 1 Projects – Potential for Multiple Discoveries ❖ Thunderdome – Fraser Range – Tier 1 Nickel-Copper Potential ❖ Thunderstorm – Fraser Range – T