Strike Resources Limited · ASX:SRK

Strike Resources — Shareholder Meeting (November 2010)

24 slides from Strike Resources's shareholder meeting presentation, Nov 25, 2010

  1. Slide 1: Annual General Meeting

    For personal use only Annual General Meeting Perth November 25, 2010

  2. Slide 2: Meeting Overview

    Meeting Overview For personal use only Chairman: Shanker Madan Managing Director: Ken Hellsten Directors: Farooq Khan William Johnson Malcolm Richmond A. Farhad Moshiri Mark Horn (Alternate Director for Mr Moshiri) Matthew Hammond Company Secretary: Stephen Gethin Notice of AGM: 15 October 2010 Prox

  3. Slide 3: Agenda

    For personal use only Agenda • Managing Director’s Overview & Presentation • Questions for the Managing Director • Financial and Director’s Reports • Questions for the Auditor • Resolutions 1 – 4 3

  4. Slide 4: Managing Director's Presentation

    For personal use only Managing Director’s Presentation

  5. Slide 5: Apurimac Project - Highlights

    Apurimac Project - Highlights For personal use only • 44% direct interest in concession owner (AF) • JORC resource of 269Mt @ Pictures here. 57.3% Fe* • Strong working relationship with major JV partner • High grade haematite with coarse, friable magnetite • Positive Initial Pre-feasibility Study Pi

  6. Slide 6: Apurimac Concessions: Exploration Upside

    Bouguer Gravity Opaban 1 Anomaly Apurimac Concessions: For personal use only Opaban 1 & 3: short term target of 300 – 350Mt* Opaban 3 Target mineralisation is based on • Undrilled gravity and magnetic anomalies Pictures here. • Both deposits open at depth • Broad mineralised zones • Skarn and hydrot

  7. Slide 7: Opaban has Excellent Metallurgical Properties

    Opaban has Excellent Metallurgical Properties For personal use only DTR Mass Recovery • Coarse particle liberation size (250 microns vs 30 – 40 microns) 60 -70% 80% • 60 - 70% mass recovery (vs 35 – 50%) 60% 39% 25% 30% Opaban Project 1 • Excellent productPictures grades here. with low 40% Project 2

  8. Slide 8: Up-side Opportunities – Cobber LIMS Potential

    Up-side Opportunities – Cobber LIMS Potential For personal use only • Initial testwork on high grade magnetite sample • Excellent mass recovery of 68% with product grade of 67% Fe • Low impurities and potential premium “sinter fines” product LIMS Mass Recovery - Opaban Opaban LIMS Impurity Rejection

  9. Slide 9: Up-side Potential - Rope Conveyor System

    Up-side Potential - Rope Conveyor System For personal use only • Option study completed • Up to 2km between support towers • Up to 20km per conveyor section • European designed and engineered • Facilitates lump/fines, coarse concentrate and ore transport options • Capex of $2.1B (Rail $3.0B) • Opex

  10. Slide 10: Building Strong Community Relations in Peru

    Building Strong Community Relations in For personal use only Peru • Community support is being fostered through long-term programs & building sustainable relationships of mutual trust and Pictures here. respect • Strong, experienced Community Relations team in place • Ongoing negotiations with commu

  11. Slide 11: Berau Thermal Coal Project – highlights

    Berau Thermal Coal Project – highlights • For personal use only Measured and Indicated Resource of 22.1Mt* • Reserves of 7.7Mt based on 10.4Mt of indicated resource • Haulage 30km to barge port • Capital Cost <US$20M (plus working capital) Pictures here. • Potential free cash flow of US$40M in the f

  12. Slide 12: Berau Thermal Coal Project – partner status

    Berau Thermal Coal Project – partner status For personal use only • Dialogue and negotiations over last 12 months regarding restructure of Cooperation Agreement • Extensive meetings during Pictures here. second half of 2010 • Numerous (generous) proposals offered to partner – all rejected • Proposal

  13. Slide 13: Looking Back

    Looking Back…….. For personal use only • Peru o AF Partner dispute settled and Peru team re-established o Excellent relations established with major AF partner – but more to do o Resource doubled at Opaban, more required o Community engagement achieved despite legacy issues o Drilling delays as comm

  14. Slide 14: Moving Forward

    Moving Forward For personal use only • Drilling at Colcabamba from December, 2010 • Cusco resource estimate in December, 2010 • Revised (realistic) plan and budget being prepared • Opaban drilling and PFS timing will driven by community approvals • Continue to strengthen partner and community relati

  15. Slide 15: Formal Business

    For personal use only Formal Business • 2010 Director’s Report and Audited Financial Statements • Resolutions 1. Re-Elect Shanker Madan as a Director 2. Re-Elect Malcolm Richmond as a Director 3. Approve Issue of Director’s Options to Ken Hellsten 4. Adopt Remuneration Report 15

  16. Slide 16: Resolution: Re-Election of Shanker Madan

    For personal use only Resolution 1 Re-Election of Shanker Madan Proxy For Against Abstain Open Totals Pictures here. Summary All Proxies 23,741,654 114,500 21,363 9,470,134 33,347,651 Received Chairman’s Proxies 6,976,963 114,500 21,363 9,467,134 16,579,960 Received Pictures here. 16

  17. Slide 17: Resolution: Re-Election of Malcolm Richmond

    For personal use only Resolution 2 Re-Election of Malcolm Richmond Proxy For Against Abstain Open Totals Pictures here. Summary All Proxies 23,781,654 69,500 21,363 9,475,134 33,347,651 Received Chairman’s Proxies 7,016,963 69,500 21,363 9,472,134 16,579,960 Received Pictures here. 17

  18. Slide 18: Resolution: Approve Issue of Director's Options to Ken Hellsten

    For personal use only Resolution 3 Approve Issue of Director’s Options to Ken Hellsten Proxy For Against Abstain Open Totals Pictures here. Summary All Proxies 20,523,530 3,337,624 14,363 9,472,134 33,347,651 Received Chairman’s Proxies 3,758,839 3,334,624 14,363 9,472,134 16,579,960 Received Pictur

  19. Slide 19: Resolution: Adopt Remuneration Report

    For personal use only Resolution 4 Adopt Remuneration Report Proxy For Against Abstain Open Totals Pictures here. Summary All Proxies 23,562,693 313,461 4,363 9,467,134 33,347,651 Received Chairman’s Proxies 6,798,002 310,461 4,363 9,467,134 16,579,960 Received Pictures here. 19

  20. Slide 20: Thank you

    For personal use only Strike Resources Limited ASX : SRK www.strikeresources.com.au Thank you

  21. Slide 21: Appendix – Apurimac Project JORC Code Information

    Appendix 1 – Apurimac Project JORC Code Information For personal use only The total Mineral Resource at the Opaban 1 and 3 concessions is 269.4 Mt, consisting of a 127.19 Mt Inferred Resource at Opaban 1 at 56.7% Fe (using a cut-off grade of 40% Fe) a 133.71 Mt Indicated Resource at Opaban 1 at 57.5

  22. Slide 22: Appendix – Berau Project JORC Code Information

    Appendix 2 – Berau Project JORC Code Information For personal use only The Coal Resource at the Berau Coal Project in East Kalimantan is 27.7 million tonnes (Mt). Of the 27.7 Mt JORC Resources, 11 Mt is in the Measured category, 11.1 Mt is in the Indicated category and 5.6 Mt is in the Inferred cate

  23. Slide 23: Appendix (cont'd) – Berau Project JORC Code Information

    Appendix 2 (cont’d) – Berau Project JORC Code Information For personal use only The Coal Resource in the Nyapa West block is estimated to be 14 Mt, comprising 1.8 Mt of Measured Resource, 8.6 Mt of Indicated Resource and 3.6 Mt of Inferred Resource. The Coal Resource in the Nyapa East block is estim

  24. Slide 24: Appendix (cont'd) – Berau Project JORC Code Information

    Appendix 2 (cont’d) – Berau Project JORC Code Information For personal use only Within the 14Mt Coal Resources in the Nyapa West block described above, 7.7 Mt of Probable Reserves have been estimated. Probable Calorific Value kcal/kg Total Sulphur (as Ash Total Reserves(Mt) (gross as received) recei