Legend Mining Limited · ASX:LEG
Legend Mining — Paydirt Nickel Conference 2018
16 slides from Legend Mining's conference presentation, Oct 22, 2018
Slide 1: Paydirt Nickel Conference 23 October 2018
For personal use only ASX:LEG 1 Paydirt Nickel Conference 23October 2018
Slide 2: Disclosure
DISCLOSURE For personal use only This is not a disclosure document. Any material used in this presentation is a summary of selected data, and any investor in Legend Mining Limited should refer to all Legend Mining Limited ASX releases and statutory reports before considering to invest in the company
Slide 3: Contents
For personal use only CONTENTS 1. Nickel Market Commentary 2. About Legend Investment Case Rockford Project Location Rockford Project Activities 3. Summary 3 “Prospective Fraser Range”
Slide 4: Nickel Market Commentary – About Nickel
NICKEL MARKET COMMENTARY – ABOUT NICKEL Nickel Prices and Inventory For personal use only • Balance in deficit since 2016, predicted to continue • Stockpiles diminishing from peak 900Kt (2015)* • Price increase from US$3.80/lb to US$5.70/lb ($7.13 max 19/4/18) • Tariff and trade-war talk uncertainty
Slide 5: About Legend
ABOUT LEGEND For personal use only ASX listed exploration company Market capitalisation ~$70M (2B shares @ 3.5cps) Cash and liquids ~$6.5M as at 30 September 2018 (includes $3M receivable from Jindal) Fraser Range – Rockford Project Chairman Exec. Director - Technical Company Secretary Manag
Slide 6: Investment Case
INVESTMENT CASE Fundamentals For personal use only • Right People Experienced corporate and technical team JV Partner and major shareholder - Creasy Group (regional experience) • Biggest block on best street (2,621km2 in Fraser Zone) • Main Commodity – Nickel (stockpiles diminishing – price risi
Slide 7: Project Location
For personal use only PROJECT LOCATION Rockford Project • Located in northern Fraser Range district • 120km NE of Nova / 100km S of Tropicana • 100% within Fraser Zone (18% of total area) • Project potential for − Nova style Nickel-Copper − Tropicana style Gold • Infrastructure access – transport, p
Slide 8: Fraser Zone Land Holders
FRASER ZONE LAND HOLDERS For personal use only MAIN PLAYERS Legend Active & Funded Creasy Group Active & Private Independence (“IGO”) Active & ~$2.5B Mkt Cap Galileo Mining New IPO – Creasy backed Regional spend producing results – value add 8 Leverage play is Legend
Slide 9: Rockford Project Update – Systematic Approach
For personal use only ROCKFORD PROJECT UPDATE – SYSTEMATIC APPROACH Summary to Date • 25 Areas selected from aeromag and gravity • 21 conductors identified by innovative MLTEM • Drilling: 4 diamond holes for 2,652m 10 RC holes for 2,266m 485 aircore holes for 33,455m Area D • Exploration spend Sept
Slide 10: Area D – Right Location
AREA D – RIGHT LOCATION • Within the Fraser Zone For personal use only Defined by 430km long gravity “trend” Mapped as mafic / ultramafic intrusives Analogies to Thompson Belt in Canada which contains clusters of orebodies Contains three gravity “Hot Spots” • Area D lies on NE margin of cent
Slide 11: Area D – Aircore Drilling
AREA D – AIRCORE DRILLING • Multiple aeromag targets For personal use only within 16km x 5km feature • RC/DD Drilling – July 2016 Positive petrology • Nov 2017 – June 2018 153 holes for 13,315m • Ultimate aim to generate areas of focus for innovative EM surveys • Identified four zones of anomalous N
Slide 12: Area D – Right Geology
AREA D – RIGHT GEOLOGY • Thick blanket of nickel-copper-cobalt For personal use only enrichment • All holes ended in mineralisation • All holes ended in gabbronorite (Nova Host Rock) • Sulphides in hole RKAC183 Pent Cpy Po 12
Slide 13: Area D – Right Lithology
AREA D – RIGHT LITHOLOGY • RKDD002 - Ultramafic with cumulate texture containing disseminated pyrrhotite and minor For personal use only pentlandite-chalcopyrite • Sulphidic metasediments/granulite (sulphur source) • Identified basal contact – metased/gabbro – right position for mineralisation Legen
Slide 14: Current/Future Programmes
CURRENT/FUTURE PROGRAMMES 2018 For personal use only Ongoing regional aircore programme – total to date 485 holes – 33,455m Continued systematic approach MLTEM, FLTEM, LF EM surveys Follow up RC/DD testing Aircore Rig, Rockford Project EM Surveying , Rockford Project 14
Slide 15: Summary
For personal use only SUMMARY • Highly Prospective Rockford Project − Three years on ground <10% area first pass EM tested • Systematic/persistent/committed = going the distance! • Well Funded • Experienced Stable Team and JV Partner Creasy says to Wilson: “This is what it looks like – go find it!”
Slide 16: Thank You
SIR Nov 2011 (Nova discovery July 2012) For personal use only 16 THANK YOU LEG May 2018