Asiamet Resources Limited · LSE:ARS

Asiamet Resources — Shareholder Meeting (June 2020)

27 slides from Asiamet Resources's shareholder meeting presentation, June 2020

  1. Slide 1: Building a Leading Indonesian Mining Business

    Slide 1: Building a Leading Indonesian Mining Business

    BUILDING A LEADING INDONESIAN MINING BUSINESS ANNUAL GENERAL MEETING AIM 30 : ARS JUNE 2020 JUNE 2019

  2. Slide 2: Forward Looking Statement

    Slide 2: Forward Looking Statement

    Forward Looking Statement The information contained in this confidential document (the “Presentation”) has been prepared by Asiamet Resources Limited (the “Company” or "Asiamet") solely for informational purposes. Information contained herein does not purport to be complete and is subject to certain

  3. Slide 3: Forward Looking Statement

    Slide 3: Forward Looking Statement

    Forward Looking Statement The documented geometries of mineralised inventory or exploration targets are not intended to be a proxy, or used as a basis, for mineral resource calculations. It is not certain if additional exploration will result in the delineation of Mineral Resources in, or near, thes

  4. Slide 4: Copper Outlook is Strong

    Slide 4: Copper Outlook is Strong

    Copper Outlook is Strong Rising demand – forecast supply deficits • Worlds largest base metals market (22Mtpa consumption) • Multitude of industrial applications • Strong demand for electricity generation and transmission due to rising global population • Powering the InfoTech revolution • Renewable

  5. Slide 5: Net-Zero Carbon Policy

    Slide 5: Net-Zero Carbon Policy

    Net-Zero Carbon Policy Huge driver in Electrification of transport Demand for EVs Will Impact the Copper Market EV Sales to grow at an average of 12% p.a. between 2019 and 2040 Source; Teck Resources and Companies Websites 5

  6. Slide 6: Copper Supply Cliff

    Slide 6: Copper Supply Cliff

    Copper Supply Cliff Mt Possible Projects 35 Probable Projects 30 Base Case Production Capability 25 Primary Demand 20 15 10 5 0 1992 1997 2002 2007 2012 2017 2022 2027 2032 2037 • Multiple industrial uses – low substitution • All power generation and transmission requires copper • World population a

  7. Slide 7: Company Overview

    Slide 7: Company Overview

    Company Overview Asiamet Resources Limited (AIM:ARS) is focused on the development and growth of its high quality, large scale, copper-gold and base-metals deposits in Indonesia HIGH QUALITY COMPELLING VALUE PROVEN TEAM PORTFOLIO BIG GROWTH • Rare portfolio of base and • JORC Resources contain • Int

  8. Slide 8: Corporate Overview

    Slide 8: Corporate Overview

    Corporate Overview Experienced team with proven track record Board of Directors Tony Manini Feng (Bruce) Sheng Executive Chairman Non-Executive Director Geologist, +30 years, Rio Tinto, Oxiana/OZ Chairman Asipac Group, Vice Chairman Minerals, Tigers Realm, EMR Capital. Australian China Business Coun

  9. Slide 9: Corporate Overview

    Slide 9: Corporate Overview

    Corporate Overview  High Quality Portfolio of Advanced Copper, Copper-Gold Capital Structure (AIM: ARS) and Polymetallic Base-Precious Metals in Indonesia  Rare Development Ready Copper Asset at BKM As at June 30, 2020  Established JORC Resource Inventory (ARS Interest): 2.4Mt Cu, 1.6Moz Au, 23.0

  10. Slide 10: BKM Resources and Reserves with Huge Growth Potential

    Slide 10: BKM Resources and Reserves with Huge Growth Potential

    Kalimantan KSK CoW BKM Resources and Reserves with Huge Growth Potential Ore Reserves Category Mt Cu Grade % Copper Kt Proved 21.1 0.6 137 Probable 30.4 0.5 166 Total 51.1 0.6 303 Measured Mineral Resources Cut-off Cu % Mt Cu Grade % Copper Kt 0.2 20.6 0.7 148.5 0.5 14.9 0.8 124.9 0.7 8.6 1.0 87.6 I

  11. Slide 11: BKM Initial Project – Feasibility Study

    Slide 11: BKM Initial Project – Feasibility Study

    BKM Initial Project – Feasibility Study Strong Production and Cashflow with Huge Growth Potential PRODUCTION FINANCIALS 20-25kt Copper Cathode Revenue: US$1.27 billion EBITDA: US$563.3 million INITIAL CAPEX2 LOW CAPITAL US$223.4 million INTENSITY3 US$7,680/t NPV8 / IRR 1 C14 / AISC4 US$124.8 million

  12. Slide 12: BKM Initial Project – Feasibility Study

    Slide 12: BKM Initial Project – Feasibility Study

    BKM Initial Project – Feasibility Study Strong Production and Cashflow with Huge Growth Potential LOM Copper Cathode Production 25.0  Initial mine life 9 years with strong potential to convert Inferred Resources Copper Cathode Production (Kt) 20.0 to extend mine life 15.0  Production of LME Grade

  13. Slide 13: BKM Initial Project – Feasibility Study

    Slide 13: BKM Initial Project – Feasibility Study

    BKM Initial Project – Feasibility Study Identified Value Enhancement Opportunities  Pre-treatment of transition mineralisation using Albion leaching technology (~$20M)  Improved mineralisation geological controls (~$5M)  An electricity supply change from LNG to coal (~$4M)  Further refining the

  14. Slide 14: BKM District Exploration - Huge Growth Potential

    Slide 14: BKM District Exploration - Huge Growth Potential

    Kalimantan KSK CoW BKM District Exploration - Huge Growth Potential  BKM (red) is the first to be evaluated - JORC Resource contains 404Kt Copper. Ore Reserves contain 303Kt Copper. Feasibility Study completed in Q2 2019  Drilling outside BKM is very limited. Four key target areas identified are e

  15. Slide 15: Regional Scale Tenement – Potential for multiple discoveries

    Slide 15: Regional Scale Tenement – Potential for multiple discoveries

    Kalimantan KSK CoW Regional Scale Tenement – Potential for multiple discoveries  Copper-rich polymetallic vein systems over 4 sqkm at Far East Zone (FEZ). Approximately 10sqkm of potential interest at Baroi Central and South  FEZ defined by outcropping massive bornite – chalcopyrite copper mineral

  16. Slide 16: Beutong Copper-Gold Project

    Slide 16: Beutong Copper-Gold Project

    Beutong Copper-Gold Project 16

  17. Slide 17: Beutong Project – Exciting Cu-Au Discovery

    Slide 17: Beutong Project – Exciting Cu-Au Discovery

    Beutong Project – Exciting Cu-Au Discovery High Quality Deposit with Big Upside Copper Model  Large, high quality porphyry Cu-Au-Mo deposit.  Measured + Indicated JORC Resources (100%)  1.2BIbs Cu, 0.4Moz Au, 5.7Moz Ag, 20Mlbs Mo  Inferred JORC Resources (100%)  4.1BIbs Cu, 1.7Moz Au, 14.9Moz A

  18. Slide 18: Appendix 1. Beutong Project – Mineral Resource

    Slide 18: Appendix 1. Beutong Project – Mineral Resource

    Appendix 1. Beutong Project – Mineral Resource Large Cu-Au-Mo deposit with higher grade core from surface Beutong 2019 Resource Estimate - Report at 0.3% Cu Lower Cut Classification Grade Metal Mineralisation Tonnes (Mt) (JORC 2012) Cu (%) Au (ppm) Ag (ppm) Mo (ppm) Cu (Kt) Au (kOz) Ag (kOz) Mo (Kt)

  19. Slide 19: Beutong Copper-Gold Deposit

    Slide 19: Beutong Copper-Gold Deposit

    Beutong Copper - Gold Deposit Large, High Quality, Globally Significant 2.50% 2.25% 2.00% Carrapateena 1.75% (Australia) 1.50% Copper Grade Marcona (Peru) 1.25% Olympic Dam Beutong Large Cu-Au Resource Expected to Grow (Australia) 1.00% Beutong High Grade Core 0.75% Beutong Sentinel (Indonesia) Anta

  20. Slide 20: Why Invest in Asiamet Resources?

    Slide 20: Why Invest in Asiamet Resources?

    Why invest in Asiamet Resources? Why Invest in Asiamet Resources?? Quality Assets & People Value Timing  Focussed team with a proven track  Copper market is projected to  Rare near-term development- record - Indonesia, discovery, mine enter a supply constrained phase ready copper project developm

  21. Slide 21: Asiamet – An outstanding opportunity

    Slide 21: Asiamet – An outstanding opportunity

    Asiamet – An outstanding opportunity 21

  22. Slide 22: Contact Information

    Slide 22: Contact Information

    Contact Information AIM | ARS Tony Manini Executive Chairman E: tony.manini@asiametresources.com W: www.asiametresources.com 22

  23. Slide 23: Appendices

    Slide 23: Appendices

    Appendices od ASIAMET RESOURCES 23

  24. Slide 24: BKM Copper Project – Mine Site Layout

    Slide 24: BKM Copper Project – Mine Site Layout

    Kalimantan KSK CoW BKM Copper Project – Mine Site Layout 24

  25. Slide 25: BKM Copper Project – Process Flow Sheet

    Slide 25: BKM Copper Project – Process Flow Sheet

    Kalimantan KSK CoW BKM Copper Project – Process Flow Sheet Conventional Process Design Process Route involves: 1. Crushing & grinding 2. Agglomeration 3. Heap-leach 4. Pls pond 5. Solvent Extraction/Electrowinning (SX-EW) 6. Producing Grade A Copper Cathode 25

  26. Slide 26: Beutong Project – Infrastructure Advantage

    Slide 26: Beutong Project – Infrastructure Advantage

    Beutong Project – Infrastructure Advantage Road, Power, Port Infrastructure Nearby  Located only 60km inland and north-east of the township of Meulaboh, Aceh  Access to project site is via partially sealed roads from the regional towns of Meulaboh and Takengon  Meulaboh - population 50,000. Comme

  27. Slide 27: Appendix 1. Beutong Project – Mineral Resource

    Slide 27: Appendix 1. Beutong Project – Mineral Resource

    Appendix 1. Beutong Project – Mineral Resource Large Cu-Au-Mo deposit with higher grade core from surface Beutong 2019 Resource Estimate - Report at 0.3% Cu Lower Cut Classification Grade Metal Mineralisation Tonnes (Mt) (JORC 2012) Cu (%) Au (ppm) Ag (ppm) Mo (ppm) Cu (Kt) Au (kOz) Ag (kOz) Mo (Kt)