Asara Resources Limited · ASX:AS1

Asara Resources — Investor Presentation (April 2026)

26 slides from Asara Resources's investor presentation, April 2026

  1. Slide 1: The Kada Gold Project

    The Kada Gold Project Developing a Premier Gold Asset in the Siguiri Basin, Guinea April 2026 ASX : AS1 ASARARESOURCES.COM CORPORATE PRESENTATION ASX: AS1 ASARARESOURCES.COM 0

  2. Slide 2: Disclaimer / Forward-looking Statements

    Disclaimer / Forward-looking Statements This presentation has been prepared by Asara Resources Limited (ABN 39 006 710 774) (“Asara”) based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the info

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS Large Siguiri Basin footprint with 0.9 Moz1 anchor deposit and clear expansion opportunity PREMIER GOLD DISTRICT GROWING GOLD INVENTORY SIGNIFICANT UPSIDE POTENTIAL Positioned in the Siguiri Basin of Guinea, 923 koz Au MRE1 at the Massan and Over 15 km of highly prospective str

  4. Slide 4: A Guinea Gold Opportunity

    A GUINEA GOLD OPPORTUNITY Strategic basin-central position in a growing world- class gold district West Africa, a Leading Gold Province: Guinea contributes ~18% of West Africa’s (WA) gold production from the Siguiri Basin within the world’s largest gold-producing region. Stable, Mining-Friendly Juri

  5. Slide 5: Corporate Overview

    CORPORATE OVERVIEW Strong share price and market capitalisation growth driven by operational progress CAPITAL STRUCTURE1 OWNERSHIP Share Price AS$ 0.14 Enterprise Value 203M MAJOR SHAREHOLDERS LISTINGS Shares on Issue 1.6B Cash Balance2 21M Barbet LLC FZ ……… 14.94% Market Cap AS$ 225M Debt Nil Capit

  6. Slide 6: Board of Directors & Corporate Governance

    BOARD OF DIRECTORS & CORPORATE GOVERNANCE Experienced board with a proven track record in gold discovery and development JEFF QUARTERMAINE BRETT MONTGOMERY DOUG JONES TIM STRONG JOANNA KIERNAN Non-Executive Chairman Non-Executive Director Non-Executive Director Non-Executive Director Company Secreta

  7. Slide 7: Leadership Team

    LEADERSHIP TEAM Proven team with extensive experience advancing Guinean gold projects to production MATTHEW SHARPLES ANDREW DE KLERK ANDRE BEZUIDENHOUT MANDJOU KEITA SOULEYMANE SAADI Chief Executive Officer VP of Exploration Principal Geologist Geology Manager Country Manager ➢ Mining professional w

  8. Slide 8: ESG and Community Initiatives

    ESG AND COMMUNITY INITIATIVES Strengthening local communities through partnership and sustainable economic development, whilst upholding commitment to environmental responsibility COMMUNITY ROBUST CORPORATE LOCAL ECONOMIC ENVIRONMENTAL INFRASTRUCTURE GOVERNANCE PARTICIPATION RESPONSIBILITY INVESTMEN

  9. Slide 9: The Kada Gold Project

    THE KADA GOLD PROJECT District-scale gold project with flagship Resource Kada Project: Contiguous 101 km² land package (Kada & Bamfele permits) located along the N–S-trending Siguiri Mineralisation Trend. Massan Deposit (Flagship): Most advanced asset with a 2023 maiden MRE of 224 koz Indicated and

  10. Slide 10: Massan Deposit: JORC 2023 MRE

    MASSAN DEPOSIT: JORC 2023 MRE A Resource constrained by drill coverage, not mineralisation continuity Massan 2023 MRE Indicated and Inferred Material Indicated Inferred Total Material Tonnes Grade Tonnes Grade Tonnes Grade Gold Type Mt g/t Mt g/t Mt g/t Ounces Oxide 4.60 1.07 7.28 0.93 11.88 0.99 37

  11. Slide 11: Massan Deposit: The Upside

    MASSAN DEPOSIT: THE UPSIDE Mineralised Domains highlight significant Resource upside through continued drilling Highlights Massan 2023 MRE Mineralised Domains ➢ Proven strike continuity of mineralisation >3,500 m ➢ Mineralisation demonstrated to depths exceeding 600 m ➢ Significant potential to disc

  12. Slide 12: Massan's Potential Quick Wins

    MASSAN’S POTENTIAL QUICK WINS Demonstrated strike and depth potential to expand Indicated and Inferred Resources 1 1 1 4 4 4 2 3 Recent Asara drilling 1• Strike Continuity Confirmed by Drilling: The current Inferred confirms mineralisation Resource captures only ~1.3 km of the N–S mineralised strike

  13. Slide 13: Consistent Gold Intercepts Across Massan

    CONSISTENT GOLD INTERCEPTS ACROSS MASSAN Broad mineralised zones are characteristic of both oxide and fresh rock, as demonstrated by the selected significant intercept1 highlights below OXIDE ZONE FRESH ZONE HOLE ID FROM TO WIDTH GRADE HOLE ID FROM TO WIDTH GRADE KRC025 16 116 100 m 3.2 g/t MSRC25-0

  14. Slide 14: A Deposit Favourable for Mining

    A DEPOSIT FAVOURABLE FOR MINING Stockwork mineralisation, low-strip ratio, free-digging and excellent recoveries Mineralisation is controlled by the intersection of two major cross-cutting regional structures, forming distinct high-grade lodes within a broader stockwork mineralised system Broad, con

  15. Slide 15: Massan's Clear Pathway to Resource Growth

    MASSAN’S CLEAR PATHWAY TO RESOURCE GROWTH Two concurrent, aggressive drill campaigns Massan remains significantly under-drilled, with mineralisation open along strike and at depth. Historical drilling defined ~3.5 km of mineralised strike, with both ends still open. Depth continuity confirmed by New

  16. Slide 16: Massan Indicated Drill Plan

    MASSAN INDICATED DRILL PLAN Drilling to rapidly grow the Indicated Resource N-S Strike & Depth Extension Drilling: Approximately 315 RC/DD drill holes targeting a minimum depth of 250m, for a total planned program of ~80,000m. The program is designed to expand the Indicated Resource footprint from a

  17. Slide 17: Drilling Supports a Deeper Pit Shell at Massan

    DRILLING SUPPORTS A DEEPER PIT SHELL AT MASSAN Phase 1 drilling confirms continuous mineralisation beyond the 2023 US$1,800 pit shell ASX: AS1 ASARARESOURCES.COM 16

  18. Slide 18: Inferred Growth Plan

    INFERRED GROWTH PLAN Systematic drilling to expand strike and depth Planned Strike Extension Drilling: Approximately 160 RC/AC drill holes targeting a minimum depth of 120m to 150m, for a total planned program of ~20,000m. The Inferred programme will test two key extensions: ➢ The broadly mineralise

  19. Slide 19: A Clear, Near-Term Growth Strategy

    A CLEAR, NEAR-TERM GROWTH STRATEGY Accelerated drilling to expand the pit shell and advance strike and depth extensions ASX: AS1 ASARARESOURCES.COM Note: Drill holes pending assay results are excluded. The long section shows only NS strike-aligned holes. 18

  20. Slide 20: Massan Deposit and Kada Project Highlights

    MASSAN DEPOSIT AND KADA PROJECT HIGHLIGHTS High-quality gold asset with scale, growth, and development potential FLAGSHIP MASSAN DEPOSIT WITH MATERIAL GROWTH UPSIDE Drilling to date has validated the targeting and underscored the scale of the prospectivity of the Massan Deposit. Demonstrated strike

  21. Slide 21: Our Strategy

    OUR STRATEGY Advancing a multi-deposit growth pipeline in West Africa’s prolific Siguiri Basin 01 02 03 04 05 Accelerate Resource Unlock Bereko’s Advance Damisso Koura Expand the Regional Build a Multi-Deposit Growth at Massan (906 Potential Targets Footprint Development Pipeline koz Au1) (18 koz Au

  22. Slide 22: Next Steps

    NEXT STEPS Ramped up drilling in 2026 to rapidly expand Massan’s Indicated and Inferred Resources PROGRAMME 2025 2026 & ACTIVITY Q4 Q1 Q2 Q3 Q4 MASSAN DRILLING Inferred RC/AC Strike Extension ~20,000m Update the MRE or continue Inferred DD Depth Extension drilling to expand the dataset prior to the

  23. Slide 23: Join our shareholder community

    Join our shareholder community +61 8 6374 2654 Matthew Sharples Chief Executive Officer info@asararesources.com Asara Resources | ASX : AS1 | FRA : ALM Suite 1, 130 Hay Street, asararesources.com Subiaco WA 6008 AUSTRALIA ABN: 39 006 710 774 This presentation was authorised for release to the ASX by

  24. Slide 24: Appendix 1: Kada Mineral Resource

    APPENDIX 1 Kada Mineral Resource (1 October 2023, US$1,800 Pit Shell) Measured Indicated Inferred Total Deposit Material Type Tonnes Gold Tonnes Gold Tonnes Gold Tonnes Gold Gold Mt g/t Mt g/t Mt g/t Mt g/t Ounces Oxide - - 4.60 1.07 7.28 0.93 11.88 0.99 377,000 Transitional - - 1.07 0.88 3.80 0.91

  25. Slide 25: Appendix 2: South American Portfolio

    APPENDIX 2 South American Portfolio: The Paguanta & Loreto Projects, Chile Loreto Copper Project Pursuant to the US$17 million Option and Joint Venture Agreement (OJVA) with Teck Resources Chile Limitada (Teck Chile), Teck Chile is continuing to engage with surface landowners and local communities t

  26. Slide 26: Appendix 3: Paguanta Mineral Resource

    APPENDIX 3 Paguanta Mineral Resource (May 2017) Resource Category Tonnes Zn (%) Pb (%) Ag (g/t) Au (g/t) Zn Eq (%) Ag Eq (g/t) Measured (M) 490,000 5.5 1.8 88 0.3 Indicated (I) 610,000 5.1 1.8 120 0.3 M+I 1,100,000 5.3 1.8 100 0.3 Inferred 1,300,000 4.8 1.1 75 0.3 TOTAL 2,400,000 5 1.4 88 0.3 9.7 23

Asara Resources — Investor Presentation (April 2026) on 6ix