Lincoln Gold Mining Inc · TSXV:LMG

Lincoln Gold Mining — Investor Presentation (October 2026)

27 slides from Lincoln Gold Mining's investor presentation, October 2026

  1. Slide 1: Two Nevada Gold Projects, One Development Strategy

    TSX.V: LMG Two Nevada Gold Projects, One Development Strategy 0 October 2026

  2. Slide 2: Cautionary Statement

    TSX.V: LMG Cautionary Statement Certain statements contained herein regarding the Company and its operations constitute “forward-looking statements” or information. All statements other than statements of historical fact included in this presentation, including, without limitation: achieving gold an

  3. Slide 3: Management Team

    TSX.V: LMG Management Team CANADA DIRECTORS: Ian Rogers, MBA, SCPM – Chief Executive Officer & Chairman of the Board Ian S. Rogers (Chair) Mr. Rogers has been the Chairman of Lincoln since August 2025. He is a leader and seasoned executive with over 25+ years of experience in the minerals and energy

  4. Slide 4: Corporate Objectives

    TSX.V: LMG Corporate Objectives Achieve production at the Bell Mountain gold-silver Mine and at the Pine Grove gold Mine in Nevada. Fully permitted Bell Mountain first to production, leading into Pine Grove production. Bell Mountain production goal of 20,000 – Pine Grove production goal of 35,000 ou

  5. Slide 5: Project Locations

    TSX.V: LMG Project Locations Bell Mountain: • A short drive from Reno and Fallon, NV • Excellent Access • Churchill County, NV Pine Grove: • A short drive from Reno and Yerington, NV • Excellent access • Lyon County, NV Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  6. Slide 6: Project Locations on Walker Lane

    TSX.V: LMG Project Locations on Walker Lane Walker Lane is a major structural zone between California and Nevada. It contains numerous historic gold districts including the Comstock Lode (Virginia City). Recent Mineral Projects include: • Pumpkin Hollow (Cu) in production • Isabella Pearl (Au) in pr

  7. Slide 7: Bell Mountain Mine Project

    TSX.V: LMG Bell Mountain Mine Project Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  8. Slide 8: Bell Mountain Mine Project

    TSX.V: LMG Bell Mountain Mine Project Panoramic view of the Bell Mountain deposits area from the access road. Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  9. Slide 9: Project Highlights

    TSX.V: LMG Project Highlights Bell Mountain Mine Project: Contains four gold/silver deposits – Spurr, Varga, Sphinx and East Ridge. Fully permitted, advanced stage project with detailed mining plan for a cost-effective, open-pit heap leach operation. Strip ratio is 1.06 waste tons to 1 ore ton, good

  10. Slide 10: Bell Mountain – Exploration Targets

    TSX.V: LMG Bell Mountain – Exploration Targets January 5, 2025, PEA completed by Welsh Hagen Associates, Reno, Nevada states that exploration drilling along trend with the Spurr and Varga deposits toward the East Ridge deposit and exploring known quartz/calcite veins along trend with the Sphinx depo

  11. Slide 11: Bell Mountain – Exploration Targets

    TSX.V: LMG Bell Mountain – Exploration Targets Lincoln funding will include: Conducting exploration drilling along the deposit ridges to potentially expand the resource bases at Bell Mountain. Commence initial site preparation at the project. Acquire | Explore | Develop w w w. l i n c o l n m i n i

  12. Slide 12: Bell Mountain Claims & Facility

    TSX.V: LMG Bell Mountain Claims & Facility Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  13. Slide 13: Bell Mountain - Facilities Arrangement

    TSX.V: LMG Bell Mountain - Facilities Arrangement Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  14. Slide 14: Bell Mountain – Resource Estimate

    TSX.V: LMG Bell Mountain – Resource Estimate Resource Estimate Summary for the Bell Mountain Project (1) Tons Gold Silver Gold Equivalent Classification (2) (x1000) (opt) (oz) (opt) (oz) (opt) (oz) Measured 754 0.024 18,355 0.621 468,417 0.027 20,005 Indicated 1,135 0.022 25,051 0.522 592,094 0.024

  15. Slide 15: Next Steps Planned

    TSX.V: LMG Next Steps Planned Bell Mountain Project: 2026 – 2027 Welsh Hagen Associates engaged as Engineers of Record. Welsh Hagen will lead a structured engineering and technical work program to advance the project. A three-phase engineering and development program has been established. Phase One

  16. Slide 16: Moving to Production

    TSX.V: LMG Moving to Production Bell Mountain Project: 2026 – 2027 A six-month exploration work program has been planned. Work programs include surveying, detailed design of the plant layout, conveyor systems and pit designs, along with submitting required permits. Finalize Plan of Operations. Obtai

  17. Slide 17: Second Property Pine Grove Gold Project

    TSX.V: LMG Second Property Pine Grove Gold Project Panoramic view taken from on the Wilson deposit looking east towards the Wheeler deposit, showing Sugarloaf with Mount Grant in the far distance and access road into the valley between the two deposits. Acquire | Explore | Develop w w w. l i n c o l

  18. Slide 18: Pine Grove - Nevada

    TSX.V: LMG Pine Grove - Nevada In the permitting process to pre-construction, construction and gold production Historic Production: Discovered in 1866; produced 240,000 ounces gold until 1887. Mined high-grade with average > 1 opt gold only down to 160 ft – 180 ft Modern Exploration: 1990’s – Teck R

  19. Slide 19: Project Highlights

    TSX.V: LMG Project Highlights Pine Grove Project Development includes 280 drill holes and a detailed NI 43-101. Final stages of permitting with anticipated full permitting within the next 12-16 months. Resource estimate gold equivalent: 210,962 ounces measured and indicated with significant potentia

  20. Slide 20: Pine Grove – Resource Estimate

    TSX.V: LMG Pine Grove – Resource Estimate Geology & Mineralization: Total Optimized Open Pit Wheeler and Wilson Cut-off Metric Imperial Host Rocks: Jurassic Granodiorite, 176 g/t opt tonnes g/t Tons opt ounces million years old. Leach Pad Indicated 0.24 0.007 5,038,448 0.93 5,553,937 0.03 149,956 Lo

  21. Slide 21: Pine Grove Resource Grade

    TSX.V: LMG Pine Grove Resource Grade Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  22. Slide 22: Pine Grove Gold - Nevada

    TSX.V: LMG Pine Grove Gold - Nevada Wilson Pit Wheeler Pit Open Open Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  23. Slide 23: Exploration Potential

    TSX.V: LMG Exploration Potential Exploration Target Areas Step Out Expansion Areas Section Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  24. Slide 24: Pine Grove 2021 Drilling

    TSX.V: LMG Pine Grove 2021 Drilling Drilling on Wilson Deposit with a view of the Wheeler Deposit in the background. Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  25. Slide 25: Next Steps Planned

    TSX.V: LMG Next Steps Planned Pine Grove Project: 2027 – 2028 Submit Studies to regulatory bodies. Complete permitting for Pine Grove in 2028. Update and Finalize Plan of Operations in 2028. Complete financial plan for 2028. Earthworks and Construction estimate to begin from cash flow at Bell Mounta

  26. Slide 26: Share Structure

    TSX.V: LMG Share Structure TSX Venture Exchange symbol LMG & Frankfurt Exchange symbol ZMG Issued & Outstanding: (as of October 1, 2026) 28,783,010 Options: Granted 04/17/26, for a five-year term / $0.60 1,850,000 Convertible Debentures: (as of September 2026) 6,116,667 Warrants – Expiry/Price: Jan.

  27. Slide 27: Company Information

    TSX.V: LMG Company Information Head Office: Lincoln Gold Mining Inc. Suite 400 - 789 West Pender Street Vancouver, British Columbia V6C 1H2 Tel. Main: (604) 688-7377 & Ian Rogers – CEO & Director Email: info@lincolnmining.com Direct: (403) 991-6991 Website: www.lincolnmining.com Email: isrogers@linc

Lincoln Gold Mining — Investor Presentation (October 2026) on 6ix