Lincoln Gold Mining Inc · TSXV:LMG

Lincoln Gold Mining — Investor Presentation (July 2025)

27 slides from Lincoln Gold Mining's investor presentation, July 2025

  1. Slide 1: Bell Mountain & Pine Grove Gold-Silver Mines

    Slide 1: Bell Mountain & Pine Grove Gold-Silver Mines

    TSX.V: LMG Bell Mountain & Pine Grove Gold-Silver Mines 0 July 2025

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    TSX.V: LMG Cautionary Statement Certain statements contained herein regarding the Company and its operations constitute “forward-looking statements” or information. All statements other than statements of historical fact included in this presentation, including, without limitation: achieving gold an

  3. Slide 3: Management Team

    Slide 3: Management Team

    TSX.V: LMG Management Team CANADA DIRECTORS: Paul Saxton, P. Eng, MBA – President and CEO Ronald Coombes Paul Saxton is the President, CEO and Director; a mining engineer with over 45 years of mining industry Paul Saxton experience holding various positions including mining engineer, mine superinten

  4. Slide 4: Corporate Objectives

    Slide 4: Corporate Objectives

    TSX.V: LMG Corporate Objectives Lincoln acquired the Bell Mountain project effective January 6, 2025. Achieve production at the Bell Mountain gold-silver Mine and at the Pine Grove gold Mine in Nevada. Bell Mountain first to production, fully permitted, leading into Pine Grove production. Bell Mount

  5. Slide 5: Project Locations

    Slide 5: Project Locations

    TSX.V: LMG Project Locations Bell Mountain: • A short drive from Reno and Fallon, NV • Excellent Access • Churchill County, NV Pine Grove: • A short drive from Reno and Yerington, NV • Excellent access • Lyon County, NV Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  6. Slide 6: Project Locations on Walker Lane

    Slide 6: Project Locations on Walker Lane

    TSX.V: LMG Project Locations on Walker Lane Walker Lane is a major structural zone between California and Nevada. It contains numerous historic gold districts including the Comstock Lode (Virginia City). Recent Mineral Projects include: • Pumpkin Hollow (Cu) in production • Isabella Pearl (Au) in pr

  7. Slide 7: Bell Mountain Mine Project

    Slide 7: Bell Mountain Mine Project

    TSX.V: LMG Bell Mountain Mine Project Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  8. Slide 8: Bell Mountain Mine Project

    Slide 8: Bell Mountain Mine Project

    TSX.V: LMG Bell Mountain Mine Project Panoramic view of the Bell Mountain deposits area from the access road. Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  9. Slide 9: Project Highlights

    Slide 9: Project Highlights

    TSX.V: LMG Project Highlights Bell Mountain Mine Project: Containing four gold/silver deposits – Spurr, Varga, Sphinx and East Ridge Fully permitted, advanced stage project with detailed mining plan for a cost-effective, open-pit heap leach operation. Strip ratio is 1.06 waste tons to 1 ore ton, goo

  10. Slide 10: Bell Mountain – Exploration Targets

    Slide 10: Bell Mountain – Exploration Targets

    TSX.V: LMG Bell Mountain – Exploration Targets Lincon funding will: Conduct exploration drilling along three of the deposit ridges to potentially expand the resource bases at Bell Mountain. Commence initial site preparation at the project. Acquire | Explore | Develop w w w. l i n c o l n m i n i n g

  11. Slide 11: Bell Mountain – Exploration Targets

    Slide 11: Bell Mountain – Exploration Targets

    TSX.V: LMG Bell Mountain – Exploration Targets January 5, 2025, PEA completed by Welsh Hagen Associates, Reno, Nevada states that exploration drilling along trend with the Spurr and Varga deposits toward the East Ridge deposit and exploring known quartz/calcite veins along trend with the Sphinx depo

  12. Slide 12: Bell Mountain Claims & Facility

    Slide 12: Bell Mountain Claims & Facility

    TSX.V: LMG Bell Mountain Claims & Facility Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  13. Slide 13: Bell Mountain - Facilities Arrangement

    Slide 13: Bell Mountain - Facilities Arrangement

    TSX.V: LMG Bell Mountain - Facilities Arrangement Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  14. Slide 14: Bell Mountain – Mining Schedule

    Slide 14: Bell Mountain – Mining Schedule

    TSX.V: LMG Bell Mountain – Mining Schedule Conceputal Mining Schedule (1) All Pits Combined Item Units Totals Total Mineralized Material Tons 000’s 3,017.6 Au Equivalent Grade AuEq opt 0.024 Contained oz Au Equivalent Oz AuEq 000’s 73.77 Waste Rock Tons 000’s 3,207.7 Total Mined Tons 000’s 6,225.3 P

  15. Slide 15: Bell Mountain – Resource Estimate

    Slide 15: Bell Mountain – Resource Estimate

    TSX.V: LMG Bell Mountain – Resource Estimate Resource Estimate Summary for the Bell Mountain Project (1) Tons Gold Silver Gold Equivalent Classification (2) (x1000) (opt) (oz) (opt) (oz) (opt) (oz) Measured 722.0 0.025 18,052 0.63 456,793 0.027 19,665 Indicated 1,064.6 0.023 24,289 0.53 567,865 0.02

  16. Slide 16: The Next Steps Planned

    Slide 16: The Next Steps Planned

    TSX.V: LMG The Next Steps Planned Bell Mountain Project: 2025 – 2026 A six -month work program has been planned. Work program includes surveying, detailed design of the plant layout, conveyor systems and pit designs, along with submitting required permits. Finalize Plan of Operations. Obtain constru

  17. Slide 17: Second Property Pine Grove Gold Project

    Slide 17: Second Property Pine Grove Gold Project

    TSX.V: LMG Second Property Pine Grove Gold Project Panoramic view taken from on the Wilson deposit looking east towards the Wheeler deposit, showing Sugarloaf with Mount Grant in the far distance and access road into the valley between the two deposits. Acquire | Explore | Develop w w w. l i n c o l

  18. Slide 18: Pine Grove - Nevada

    Slide 18: Pine Grove - Nevada

    TSX.V: LMG Pine Grove - Nevada In the permitting process to pre-construction, construction and gold production Historic Production: Discovered in 1866; produced 240,000 ounces gold until 1887. Mined high-grade with average > 1 opt gold only down to 160 ft – 180 ft Modern Exploration: 1990’s – Teck R

  19. Slide 19: Project Highlights

    Slide 19: Project Highlights

    TSX.V: LMG Project Highlights Pine Grove Project Development includes 280 drill holes and a detailed NI 43-101. Final stages of permitting with anticipated full permitting within the next 12-16 months. Resource estimate gold equivalent: 210,962 ounces measured and indicated with significant potentia

  20. Slide 20: Pine Grove – Resource Estimate

    Slide 20: Pine Grove – Resource Estimate

    TSX.V: LMG Pine Grove – Resource Estimate Geology & Mineralization: Total Optimized Open Pit Wheeler and Wilson Cut-off Metric Imperial Host Rocks: Jurassic Granodiorite, 176 g/t opt tonnes g/t Tons opt ounces million years old. Leach Pad Indicated 0.24 0.007 5,038,448 0.93 5,553,937 0.03 149,956 Lo

  21. Slide 21: Pine Grove Resource Grade

    Slide 21: Pine Grove Resource Grade

    TSX.V: LMG Pine Grove Resource Grade Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  22. Slide 22: Pine Grove Gold - Nevada

    Slide 22: Pine Grove Gold - Nevada

    TSX.V: LMG Pine Grove Gold - Nevada Wilson Pit Wheeler Pit Open Open Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  23. Slide 23: Exploration Potential

    Slide 23: Exploration Potential

    TSX.V: LMG Exploration Potential Exploration Target Areas Step Out Expansion Areas Section Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  24. Slide 24: Pine Grove 2021 Drilling

    Slide 24: Pine Grove 2021 Drilling

    TSX.V: LMG Pine Grove 2021 Drilling Drilling on Wilson Deposit with a view of the Wheeler Deposit in the background. Acquire | Explore | Develop w w w. l i n c o l n m i n i n g . c o m

  25. Slide 25: The Next Steps Planned

    Slide 25: The Next Steps Planned

    TSX.V: LMG The Next Steps Planned Pine Grove Project: 2025 – 2027 Submit Studies to regulatory bodies in 2025. Complete permitting for Pine Grove in 2026. Update and Finalize Plan of Operations in 2026. Complete financial plan for 2026. Earthworks and Construction estimate to begin from cash flow at

  26. Slide 26: Share Structure

    Slide 26: Share Structure

    TSX.V: LMG Share Structure TSX Venture Exchange symbol LMG & Frankfurt Exchange symbol ZMG2 Issued & Outstanding: (as of July 16, 2025) 23,797,164 Options: To be issued in 2025 0 Convertible Debentures: January 6, 2025 933,333 Warrants – Expiry/Price: May 14, 2026 & July 4, 2026 / $0.50 1,725,000 Ju

  27. Slide 27: Company Information

    Slide 27: Company Information

    TSX.V: LMG Company Information Head Office: Lincoln Gold Mining Inc. Suite 400 - 789 West Pender Street Vancouver, British Columbia V6C 1H2 Tel: (604) 688-7377 Email: info@lincolnmining.com Website: www.lincolnmining.com Nevada Office: Lincoln Resource Group Corp. 1318 Gambrel Drive Carson City, Nev

Source: Internet Archive copy of lincolnmining.com

More decks from Lincoln Gold Mining Inc

All 8 Lincoln Gold Mining decks