Huaneng Power International, Inc. Class A · SSE:600011

Huaneng Power International, Inc. Class A — FY2025 Earnings Presentation

14 slides from Huaneng Power International, Inc. Class A's earnings presentation, Mar 26, 2026

  1. Slide 1: Annual Results Conference

    iS | 46 BE El Bo FA TAR BR ZS al HUANENG POWER INTERNATIONAL, INC. Annual Results Conference March 26, 2026

  2. Slide 2: Agenda

    01 Performance Brief 02 Operation Results 03 Major Achievements During 14th-Five-Year-Plan Period 04 Industry Landscape 05 Expectations & Missions

  3. Slide 3: Performance Brief

    Total Assets Equity Based Net Assets 619.7 Billion yuan 148.6 Billion yuan YoY +4.04% YoY +3.31% Operation Equity Based EPS Revenue Net Profit 229.3 Billion 14.5Billion yuan 0.75 yuan YoY yuan -6.62% YoY +42.73% YoY +0.29yuan

  4. Slide 4: Power Production, Utilization Hours and Average Tariff

    01 Domestic Power Production 02 Utilization Hour 437.56 Billion KWH in 2025 3111 Hours in average for domestic plants Decreased by 15.38 Billion Kwh YoY(-3.39%) YoY decreased by 445Hr COAL FIRED GAS FIRED 340.2 Billion Kwh (77.7%) 28.9 Billion Kwh (6.6%) 03 Average Tariff (VAT included) 3959 Hr 1982

  5. Slide 5: Unit Fuel Cost and Shares of Coal Contracts

    Unit Fuel Cost Shares of Coal Contracts (Mid-long term, Spot Market, Imported) Yuan/MWH 211.72 206.58 180.62 326.43 Mid-long Term Spot Market 50.37% 51.65% 46.32% Imported 300.31 33.86% 32.72% 1066 1067 32.40% 862 20.96% 266.88 15.78% 717 15.96% 609 669 390 334 330 In Million Ton 2023 2024 2025 76.1

  6. Slide 6: Newly Installed Renewables and Gas Capacity

    Newly Installed Newly Installed Renewables Capacity Gas Units 12055MW* 4193MW 10004MW 9693MW 35% 9418MW 8859MW 7862MW 44% 11924MW Built in’25 21% Wind PV 5353MW 2023 2024 2025 2378MW *Including 131MW Wind Capacity from Acquisition.

  7. Slide 7: Overseas Plants: Tuas Power and Sahiwal

    Tuas Power, Singapore Total Revenue in 2025, 2.11 Billion yuan Sahiwal Plant, Pakistan Total Revenue in 2025, 860 Million yuan

  8. Slide 8: Promise of Dividends Distribution

    Promise of Dividends Distribution When the Company’s earning and accumulative retained profits for the current year are positive, and the company's cash flow is able to meet the need for its operation and development, the Company’s cash dividend payout shall be no less than 50% of the distributed pr

  9. Slide 9: Introducing Regulation on Market Value Management

    Introducing Regulation Enhancing Delivering Feasible on Market Value Communication and Deepening Researches Scheme for Share Optimizing Dividends Management for the Connection with on M&A Repurchase and Buying Dispatching Company by Major Shareholders Pioneering the latest Market Expanding the chann

  10. Slide 10: Total Installed Capacity

    Total Installed Capacity During China’s 14th-Five- In Our Total PV Year-Plan Period Installed Capacity 25,069 MW The Company 16.1% Keeps a 6.6% Annual Average Renewable Energy Growth in Capacity takes 29.31% Gas Fired 11.4% 17,700M 155,869 W 35043MW Renewables Added Low Carbon Clean MW 13.2% With it

  11. Slide 11: Technology Achievements and R&D Investment

    1 2 3 4 World’s First 650℃ Ultra- Low-Temperature Supercritical Coal-Fired Near-Zero Peak Load Home-Developed Unit Emission Management via Floating PV farm DCS Utilized into Introduced in Yuhuan Plant Molten Salt Thermal Production Technology in Zhejiang Province Storage Technology Applied 40+ Billi

  12. Slide 12: Electricity Market and Coal Market

    Electricity Market Faster construction in electricity spot market Market based settlement system established at provincial level Tariff continues to fluctuate as market entities competing intensely. Estimated Power Consumption Nationwide Coal Market Market stabilization oriented policy introduced 5%

  13. Slide 13: Expectations and Missions

    Securing supply while control Development Transformation the coal cost Coal Improving the quality of mid- Promoting high quality development of renewables Procurement long term coal contract Optimizing the structure of coal-fired capacity Take all actions to promote competitiveness Optimizing the pr

  14. Slide 14: Building a Flagship Company

    Building a Flagship Company Adding Vitality to Huaneng’s Paragraph In the Cause of National Modernization Three Strengths, Three Excellences Strategy in building leading capabilities: Stronger innovation capability, stronger competitiveness and stronger Party leadership. Together with excellent inte