Li-ft Power Ltd. · TSXV:LIFT
Li-ft Power — Investor Presentation (October 2024)
32 slides from Li-ft Power's investor presentation, October 2024
Slide 1: Hard Rock Lithium Exploration in Canada
HARD ROCK LITHIUM EXPLORATION IN CANADA POWER TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 www.li-ft.com October 2024
Slide 2: Forward Looking Statements
Forward Looking Statements POWER Statements contained in this presentation that are not current or historical factual statements This presentation is being provided for information purposes only and does not constitute or may constitute “forward-looking information” within the meaning of applicable
Slide 3: Li-FT Power: Why Invest
Li-FT Power: Why Invest POWER INFRASTRUCTURE RESOURCE BASE • All projects have access to DISCOVERY POTENTIAL • Mineral resource estimate slated to existing roads and rail • Quebec Greenfields Project: High position Yellowknife as top 10 hard • Access to the Pacific coast: potential for major lithium
Slide 4: Li-FT Power: Our Projects
Li-FT Power: Our Projects POWER YELLOWKNIFE PROJECT QUEBEC GREENFIELDS Northwest Territories, Canada Québec, Canada • Inferred MRE: 50.4Mt at 1.00% Li2O • Largest land position in the James Bay region of Quebec (2,300 km2 ) • Excellent transport infrastructure – proximity to road and rail • 25 km lo
Slide 5: Li-FT People: Management
Li-FT People: Management POWER Francis MacDonald Alex Langer Andrew Marshall April Hayward David Smithson CEO & Director President & Director Chief Financial Officer Chief Sustainability Officer Senior Vice President, Geology • Co-founded Kenorland • Worked with Canaccord • Chartered Accountant & •
Slide 6: Li-FT People: Board
Li-FT People: Board POWER Francis MacDonald Alex Langer Advisors CEO & Director President & Director Paul Gruner Iain Scarr Ken Scott Don Hains Director Director Director Advisor • Former CEO for Det’on • Former Commercial Director & VP • Has over 30 years of public company • An industrial minerals
Slide 7: Yellowknife - Infrastructure in an Established District
Yellowknife - Infrastructure in an Established District POWER • The Yellowknife Lithium Project is accessible by road from the city of Yellowknife • Spodumene concentrate can be shipped to rail at Hay River by road or by barge in summer Ingraham Trail Barge between Hay River and Yellowknife A C CN R
Slide 8: Canadian Railway Infrastructure - Ports easily accessible
Canadian Railway Infrastructure - Ports easily accessible POWER TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 8
Slide 9: Yellowknife Lithium Project – Visible from Space
Yellowknife Lithium Project – Visible from Space POWER Abundant outcrop with almost complete exposure sets the Yellowknife Project apart Size potential and lithium grades are readily apparent based on outcrop exposure 9
Slide 10: 50,000 m of drilling completed across 8 deposits
50,000 m of drilling completed across 8 deposits POWER • 50,000 m of drilling completed to date at 8 pegmatites in the last 10 months • Most pegmatites are still open – more step-out drilling to be completed in order to define the limits of mineralization • Widths are between 10-30 m • Strike length
Slide 11: Yellowknife Lithium Project: Mineral Resource Estimate
Yellowknife Lithium Project: Mineral Resource Estimate POWER • Estimate includes 286 drill holes or 50,000 m of drilling Includes 8 of the 13 pegmatites across Li-FT’s land package, east of Yellowknife • 50.4 Mt at 1.0% Li2O of inferred resource category • Six of the eight dykes remain open in spodu
Slide 12: Yellowknife Lithium Project: Cut-off sensitivities
Yellowknife Lithium Project: Cut-off sensitivities POWER Big-East Fi Main and SW Cut-off Li 2 O% Li 2 O% In Situ Cut-off Grade In Situ Grade Tonnes Grade (%) Tonnes (Li 2 O%) Tonnes Grade (%) Tonnes (Li 2 O%) 0.00 18,420,000 0.97 179,000 0.00 17,303,000 0.86 149,000 0.20 17,648,000 1.01 178,000 0.20
Slide 13: Block Models and Sections
Block Models and Sections POWER Shorty Big East Echo Fi SW 13
Slide 14: Globally Significant Lithium Resource
Globally Significant Lithium Resource POWER TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 14
Slide 15: Peer Benchmarking – Initial Resource Estimates
Peer Benchmarking – Initial Resource Estimates POWER Resource Grade Project Location Operator Strategic Investor Maiden Current Current • 3rd largest initial resource for all spodumene projects in (Mt Li2O) (Mt Li2O) (% Li2O) SKWN Quebec Patriot 1.55 1.97 1.38% 1 1.55 1.97 Canada Adina Quebec Winsom
Slide 16: Yellowknife Metallurgy
Yellowknife Metallurgy POWER 79% recoveries producing high-quality spodumene concentrate grading 5.83% Li2O Summary of Results Wt. Grade (%) Recovery (%) • Global average recovery across all deposits on a Sample Flowsheet (%) Li Li2O Fe2O3 Li Fe2O3 DMS + flotation circuit is 79.1% BigE 21.1 2.7 5.79
Slide 17: Yellowknife Lithium Project vs. Sigma Lithium
Yellowknife Lithium Project vs. Sigma Lithium POWER Yellowknife and Sigma pegmatite districts: multiple dykes which could contribute to a global resource Mut Bin Bet Lens L.Antiga Ananias Samambaia • Sigma Lithium’s Grota do Cirilo VO L.Ramon project is very similar L. Grande Hid geologically to Li-
Slide 18: ESG Highlights
ESG Highlights POWER Executive Oversight (Chief Sustainability Officer) Strong, collaborative relationships with local Yellowknife Lithium Project Employment Indigenous communities. (% Person Hours) • Established, effective engagement process. Indigenous (28.4%) Local (Northern) (26.4%) • Key Explor
Slide 19: Cali Lithium Project - Location
Cali Lithium Project - Location POWER Field work in 2023 preparing for initial 2024 drill program • The Cali Lithium Project is located on the border of the Northwest Territories and Yukon Territory Cali • 50 km to the north of the past- Lithium producing Cantung mine Project Cali Lithium Project •
Slide 20: Cali – The heart of a spodumene pegmatite district
Cali – The heart of a spodumene pegmatite district POWER FieldGeochemistry Rock work in 2023 preparing for initial 2024 drill program & Mapping • Prospecting and mapping in summer of 2023 defined a number of spodumene pegmatite corridors/dyke swarms • 1.5 km by 1 km area contains many individual dyk
Slide 21: Cali – The heart of a spodumene pegmatite district
Cali – The heart of a spodumene pegmatite district POWER Soil Geochemistry Soil geochemistry outlines outcropping pegmatite corridors Soil geochemistry anomalism similar magnitude to outcropping area – possibly due to additional spodumene pegmatites under cover? 22
Slide 22: Cali vs. Colina (Latin Resources)
Cali vs. Colina (Latin Resources) POWER Field work in 2023 preparing for initial 2024 drill program • Cali has a similar footprint to Latin A Resources’ Colina lithium deposit in Brazil A’ 200 m A’ • Similar geological setting – pegmatite dyke swarms with many narrow dykes • Potential for Cali to ha
Slide 23: Quebec Greenfields
Quebec Greenfields POWER Greenfields Exploration targeting Li pegmatites under cover in a prospective district • Li-FT has 3 projects in James Bay, Quebec; total area of 2,282 km2 • RUPERT • PONTAX • MOYENNE • The Rupert Project surrounds the Whabouchi Li deposit and covers ~1,000 km2 of similar geo
Slide 24: Till geochemistry results
Till geochemistry results POWER • 16,700 till geochemistry samples collected over 2 summers Galaxy – Arcadium Whabouchi – Arcadium 110 Mt at 1.30% Li2O 55 Mt at 1.45% Li2O Moyenne Project • Till geochemistry highlighted areas Li anomalism in the till/soil Pontax Project Rupert Project • Li anomalies
Slide 25: Spodumene grain counts in till
Spodumene grain counts in till POWER • 620 bulk till samples were collected and processed for spodumene grain counts in areas that had anomalism in Galaxy – Arcadium Whabouchi – Arcadium the till geochemistry survey 110 Mt at 1.30% Li2O 55 Mt at 1.45% Li2O • Samples were collected down- ice of Whabo
Slide 26: Pontax – 13 km by 6 km spodumene anomaly (in till)
Pontax – 13 km by 6 km spodumene anomaly (in till) POWER • 13 km by 6 km spodumene- in-till anomaly located within the Pontax Project • The number of spodumene grains in till at Pontax is similar to the spodumene counts located down-ice of the Whabouchi lithium deposit • The areal extent of the Pont
Slide 27: Pontax Spodumene Counts – Scale comparisons
Pontax Spodumene Counts – Scale comparisons POWER CV5 (Patriot Battery Metals) Galaxy (Arcadium) Adina (Winsome Resouces) • The scale of the Pontax 109 Mt at 1.42% Li2O 110 Mt at 1.30% Li2O 78 Mt at 1.15% Li2O spodumene grain-in-till anomaly CV9 is similar in scale to the CV trend of pegmatites owne
Slide 28: Timeline & Catalysts
Timeline & Catalysts POWER October 1st, 2024 MRE Released October – December 2024 Quebec Discovery/Till Sampling Sep 15 – Apr 2025 Preliminary Economic Assessment March – April 2025 Pontax drill program *contingent on results from summer 2024 till sampling program June – August 2025 YLP Summer Drill
Slide 29: Share Structure
Share Structure POWER Capital Structure Top Institutional Holders Analyst Coverage As Of October 1st, 2024 Top Institutional Holders Style Issued and Outstanding 42,745,337 1. Commodity Capital AG Growth Katie Lachapelle, CPA Options 1,070,000 2. Extract Capital Growth DSUs 7,544 3. Tribeca Investme
Slide 30: Li-FT Power Highlights
Li-FT Power Highlights POWER One of the most exciting exploration portfolios of hard rock lithium projects in North America YLP is Currently 10th largest spodumene project in the Americas Experienced Team 3rd largest maiden resource World-class Hard Rock Indigenous estimate in Canada – potential Lit
Slide 31: Contact
CONTACT Head Office 1218 - 1030 West Georgia Street Vancouver, BC V6E 2Y3 Email: Investors@Li-FT.com www.li-ft.com Francis MacDonald CEO Alex Langer President Daniel Gordon Investor Relations Manager Follow us: @Li_FTPower Li-FT Power TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 www.li-ft.com
Slide 32: Appendix A - Footnotes for Peer Benchmarking Table
Appendix A - Footnotes for Peer Benchmarking Table POWER • Patriot Battery Metals Inc. – SKWN • Rock Tech Lithium Inc. – Georgia Lake “NI 43-101 Technical Report – Mineral Resource Estimate for the CV5 Pegmatite, Corvette Property” effective June 25, 2023; Todd “Preliminary Economic Assessment for a