Li-ft Power Ltd. · TSXV:LIFT

Li-ft Power — Investor Presentation (June 2026)

30 slides from Li-ft Power's investor presentation, Jun 22, 2026

  1. Slide 1: Unlocking Hard Rock Lithium Potential in Canada

    Unlocking Hard Rock Lithium Potential in Canada POWER For personal use only TSXV: LIFT | ASX: LFT | OTCQX: LIFFF | FRA: WS0 www.li-ft.com June 2026

  2. Slide 2: Important Information

    Important Information Li-FT Power Limited (Australian Registered Body Number: 696 815 595) incorporated in the Province of British Columbia, POWER FORWARD LOOKING STATEMENTS Canada. The liability of its members is limited by shares Statements contained in this Presentation that are not current or hi

  3. Slide 3: Important Information (Continued)

    Important Information (Continued) POWER FORWARD LOOKING STATEMENTS (Continued) CAUTIONARY NOTE REGARDING TECHNICAL DISCLOSURE NI 43-101 The technical and scientific information in this Presentation related to Li-FT’s projects has been reviewed and approved by Ron Voordouw, Ph.D., P.Geo., Partner, Di

  4. Slide 4: Building a Tier-One Hard Rock Lithium Platform in Canada

    Building a Tier-One Hard Rock Lithium Platform in Canada with Visible Path to Development For personal use only 1. 2. 3. 4. 3rd Largest Hard Aiming to be Expedited Integrated Lithium Rock Lithium Canada’s next Li Permitting Solution Carbonate Resource Base in producer + Low CAPEX Downstream North Am

  5. Slide 5: Combined Company Leadership Team

    Combined Company Leadership Team POWER Proven Leadership Team with a Demonstrated Track Record of Value Creation in the Lithium Sector Francis MacDonald Anthony Tse Andrew Marshall President, CEO & Director Executive Chairman CFO 15+ years of experience in the mining 30 years of private and public c

  6. Slide 6: Portfolio at a Glance

    Portfolio at a Glance POWER North America’s 3rd largest hard-rock lithium resource base ADINA-GALINÉE PROJECT YELLOWKNIFE PROJECT Québec, Canada Northwest Territories, Canada Near-surface, open-pit deposit Top-5 lithium resource in North America — 60.5 Mt at 1.14% Li2O (indicated) For personal use o

  7. Slide 7: Adina Overview

    Adina Overview POWER Adina Lithium Project (100% Owned) • One of the largest lithium resources in Canada - 60.5 Mt at 1.14% For personal use only Li2O (indicated) 15.9 Mt at 1.17% Li2O (inferred) current resource estimate1,2 • Near surface, hard rock spodumene lithium deposit with low strip ratio of

  8. Slide 8: Adina & Galinée: Better Together

    Adina & Galinée: Better Together POWER Adina • Ownership: 100% Li-FT • Size: 44 km2 For personal use only Québec Resource: 60.5 Mt at 1.14% Li2O (indicated) 15.9 Mt at 1.17% Li2O (inferred) current resource estimate1,2 • The Adina deposit is located adjacent to the claim boundary between the Adina a

  9. Slide 9: Unlocking Upside: Removing a Boundary

    Unlocking Upside: Removing a Boundary POWER Eliminating the Existing Constraint on Adina Has the Potential to Materially Increase the Mineral Resource Adina Pit Design3 vs. Pegmatites Shell Commentary • The Adina deposit currently hosts a For personal use only resource of 60.5 Mt at 1.14% Li2O (indi

  10. Slide 10: Development timeline 2026-2030

    POWER Today 2026 2027 2028 2029 2030 Renard Negotiations Lock in DFS MRE Final Investment Decision Corporate Project Finance For personal use only Operational Readiness Begins EXPECTED 1ST CONCENTRATE MRE Update Resource Drilling (Infill) Exploration Drilling Exploration Drilling Geology & Explorati

  11. Slide 11: Market Positioning

    Market Positioning POWER Li-FT Has One Of the Largest Hard Rock Lithium Resource Profiles Globally and Significant Re-Rate Potential Global M&I + Inferred Resources1 (Mt LCE) M&I Resources 9.91 Inf. Resources For personal use only 1.10 1.712,3,4 0.08 3.74 0.64 0.78 0.05 1.712,3,4 1.75 0.33 0.10 1.33

  12. Slide 12: Yellowknife Lithium Project

    Yellowknife Lithium Project POWER Abundant outcrop with almost complete exposure sets the Yellowknife Project apart Size potential and lithium grades are readily For personal use only apparent based on outcrop exposure 12

  13. Slide 13: Yellowknife - Infrastructure in an Established District

    Yellowknife - Infrastructure in an Established District POWER • The Yellowknife Lithium Project is accessible by road from the city of Yellowknife For personal use only • Spodumene concentrate can be shipped to rail at Enterprise by road Ingraham Trail Highway 3–Yellowknife to Hay River A A B B CN R

  14. Slide 14: Canadian Railway Infrastructure - Ports easily accessible

    Canadian Railway Infrastructure - Ports easily accessible For personal use only POWER 14

  15. Slide 15: Li-FT Expands Downstream Project Scope

    Li-FT Expands Downstream Project Scope1 POWER • 30ktpa LCE Battery Grade Lithium Carbonate LITHIUM CARBONATE CONVERTER STUDY WITH Converter ENGINEERING PARTNER 1 • Feedstock: spodumene concentrate from the Yellowknife Lithium Project (NWT) For personal use only • Includes a high-level site evaluatio

  16. Slide 16: Yellowknife Lithium Project: Mineral Resource Estimate

    Yellowknife Lithium Project: Mineral Resource Estimate1,2 POWER • 314 drill holes or 57,314 m of drilling to date • Currently 50.4 Mt inferred resource at 1.0% Li2O (released Oct. 2024)1,2 For personal use only Includes 8 of the 15 pegmatites across Li-FT’s land package, east of Yellowknife • Six of

  17. Slide 17: Yellowknife Metallurgy

    Yellowknife Metallurgy POWER 79% recoveries producing high-quality spodumene concentrate grading 5.83% Li2O1,2 Summary of Results1,2 Wt. Grade (%) Recovery (%) • Global average recovery across all deposits on a Sample Flowsheet (%) Li Li2O Fe2O3 Li Fe2O3 For personal use only DMS + flotation circuit

  18. Slide 18: Environment, Social, Governance

    Environment, Social, Governance POWER Strong, collaborative relationships with local Indigenous communities in stable regulatory jurisdictions. For personal use only Executive Oversight (CSO) • Established, effective engagement processes. YELLOWKNIFE ADINA Project • Baseline environmental data colle

  19. Slide 19: Li-FT Timeline & Catalysts

    Li-FT Timeline & Catalysts POWER Jan-Jun 2026 Complete Adina-Galinée combined MRE Jan-Jun 2026 Run trade-off studies on combined deposit ADINA For personal use only July-Oct 2026 Adina: 35,000m Drill Campaign Oct 2026 onwards Updated PEA + Feasibility Study initiated Feb-Apr 2026 YLP Resource Drilli

  20. Slide 20: Capital Markets Profile

    Capital Markets Profile POWER Shareholder Summary Share Structure As of June 17th, 2026 Basic Shares Outstanding (including CDIs) 86,720,017 For personal use only Options 4,112,375 Retail / HNW 66% RSUs, DSUs & PSUs 234,263 Institutional Fully Diluted Shares Outstanding 91,066,655 20% Market Cap. (C

  21. Slide 21: Key Takeaways

    Key Takeaways POWER 1 2 For personal use only Building North 3rd Largest hardrock America’s next lithium lithium resource base producer in North America + room to grow 3 Feasibility study in 2027  First ore 4 Strengthened Leadership, Balance Sheet, and Market expected in 2030 Relevance Head Office

  22. Slide 22: Historical Price Performance of Spodumene

    Historical Price Performance of Spodumene POWER • Demand Inflection: EV + energy storage growth accelerating lithium For personal use only consumption • Supply constraint: new supply harder/slower to bring online → tighter market ahead • Room to Run: pricing remains well below prior- cycle peaks—cre

  23. Slide 23: Demand estimates continue to increase

    Demand estimates continue to increase POWER Long-term growth driven by stationary storage and EV; lithium demand expected +15-40% Y/Y in 2026 2026 lithium demand projected at ~1.6 million tonnes LCE For personal use only 2030 lithium demand range of 2.8 Mt -3.6 Mt LCE depending on: • Stationary stor

  24. Slide 24: Demand - 2025 Global EV Sales of 22M

    Demand - 2025 Global EV Sales of 22M POWER (+21% y/y), Driven by Growth in China and Europe For personal use only Resilient demand growth in Europe supported by policy and growing local supply chain 1 Source: EV Volumes registrations data as of Jan 31, 2026 TSXV: LIFT | ASX: LFT | OTCQX: LIFFF | FRA

  25. Slide 25: Global Stationary Storage Demand Up >80% in 2025

    Global Stationary Storage Demand Up >80% in 2025 POWER In China, support in the 15th 5-year plan and strong economics due to falling pack costs For personal use only promote stationary storage buildout In the US, stationary storage provides grid stability and resilience as energy needs increase due

  26. Slide 26: Supply struggles to keep pace

    Supply struggles to keep pace POWER Modest supply revisions meet surging demand — deficit market emerging in 2026 and widening through 2035 Supply revisions Global LCE Supply Forecast For personal use only (LCE kt) • Old vs New estimates, 2025A – 2035E • 2026 supply lowered 8% on Jianxiawo restart d

  27. Slide 27: Appendix

    Appendix For personal use only www.li-ft.com TSXV: LIFT | ASX: LFT | OTCQX: LIFFF | FRA: WS0 www.li-ft.com

  28. Slide 28: Li-FT Resources (Yellowknife)

    Li-FT Resources (Yellowknife) POWER Indicated Inferred Total Li2O Li2O Li2O Zone Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (%) (%) (%) Big East - - 16.5 1.06% 16.5 1.06% For personal use only Fi Main & Fi Sw - - 13.8 1.03% 13.8 1.03% Shorty - - 5.2 1.01% 5.2 1.01% Echo - - 6.2 0.94% 6.2 0.94% Ki - - 2.8 0

  29. Slide 29: Li-FT Resources (Adina)

    Li-FT Resources (Adina) POWER Indicated Inferred Cut-Off Grade Cut-Off Grade Method Tonnes (Mt) Tonnes (Mt) (%Li2O) (%Li2O) (%Li2O) (%Li2O) For personal use only Open Pit 0.5% 58.1 1.14 0.5% 14.4 1.16 Underground 0.7% 2.4 1.11 0.7% 1.5 1.23 Total 60.5 1.14 15.9 1.17 Adina Mineral Resource Estimate N

  30. Slide 30: Resource References (Comparables)

    Resource References (Comparables) POWER PMET Resources: PMET Resources MRE has an effective date of October 20, 2025. For more information refer to PMET's NI 43-101 Technical Report entitled "CV5 Pegmatite Lithium-Only Feasibility Study NI 43-101 Technical Report Shaakichiuwaanaan Project". More det

Li-FT Power — Investor Presentation (June 2026) on 6ix