Sable Resources Ltd. · TSXV:SAE

Sable Resources — Investor Presentation (2007)

20 slides from Sable Resources's investor presentation, 2007

  1. Slide 1: Sable Resources Ltd. – Gold & Silver Production in British Columbia

    Slide 1: Sable Resources Ltd. – Gold & Silver Production in British Columbia

    SABLE RESOURCES LTD. Gold & Silver Production in British Columbia

  2. Slide 2: Presentation Outline

    Slide 2: Presentation Outline

    Presentation Outline Introduction to Sable Our Management Team Share Capital Summary Our Toodoggone Mining Project Outlook for 2007 and beyond

  3. Slide 3: The Company

    Slide 3: The Company

    The Company Sable is in the business of Producing and Exploring for Gold, Silver and Copper in British Columbia, Canada

  4. Slide 4: Introduction

    Slide 4: Introduction

    Introduction z British Columbia z Focus on British Columbia Company z Since 1980 z TSX Venture Listed z Sable’s significant since 1980 investments: z Skyline Gold z Johnny Mountain Mine z Cons’d Barrier Reef z Blackdome Mine z International Taurus z Well Capitalized z Taurus Gold Mine z Few Issued S

  5. Slide 5: Management

    Slide 5: Management

    Management z Mel Rahal President z Brokerage background z President since 1980 z Ed Craft Director z Mining Engineer z Stephen Pearce Director z Corporate Lawyer z Fred Findler Director z Accountant z Serge Comeau Investor Relations

  6. Slide 6: Share Capital

    Slide 6: Share Capital

    Share Capital z 18.5 million Shares Issued z Fully-Diluted – 21.8 million z Recent Share Price $0.80 z Market Cap: $14.8 million

  7. Slide 7: Toodoggone Project

    Slide 7: Toodoggone Project

    Toodoggone Project Regional Interest z Over a dozen exploration companies z Northgate Minerals (KEMESS Mine) z Omineca Resource Road z year-round access from Prince George

  8. Slide 8: Landholdings

    Slide 8: Landholdings

    Landholdings z 100% Ownership z Two Past-Producing Gold & Silver mines z Over 58 km2 of mineral tenure z Fully-Permitted: z Mill z Tailings Ponds z 2 mining leases

  9. Slide 9: Project Areas

    Slide 9: Project Areas

    a SABLE RESOURCES

  10. Slide 10: Baker Mine

    Slide 10: Baker Mine

    Baker Mine z 15 historical zones identified z Production from 2 veins, the “A” and “B”. z Average grades of 0.5 oz/ton gold, and 5 to 10 oz/ton silver z Over 40,000 ounces of gold and 750,000 ounces of silver produced since 1980

  11. Slide 11: Baker Mine – Ridge Zone

    Slide 11: Baker Mine – Ridge Zone

    Baker Mine – Ridge Zone • Current exploration target for 2007 program •High Grade Float in area up to 12.6 oz/t gold and over 300 oz/t silver • Limited prior exploration

  12. Slide 12: Black Gossan Porphyry

    Slide 12: Black Gossan Porphyry

    Black Gossan Porphyry z Bulk tonnage Copper Gold target similar to the nearby Kemess Mine z Large zone of anomalous geochemistry and geophysics z Shallow drilling has confirmed porphyry system z Remains to be tested at depth

  13. Slide 13: Perry Mason Showing

    Slide 13: Perry Mason Showing

    Perry Mason Showing z High grade epithermal gold-silver veins z In situ surface showing of 4.8 oz/t gold, and 78.6 oz/t silver over 3 m width z 2.5 km from Baker Mill z Acquired in Spring 2007 z No exploration work since 1987

  14. Slide 14: Shasta Mine

    Slide 14: Shasta Mine

    Shasta Mine z 3 Developed Zones: average grade of 0.25 oz/t gold and 15-18 oz/t silver z “D” - Mined underground z “JM” - Underground & open-pit z “Creek” – Open pit 2004 & 2005 - Underground Development 2007

  15. Slide 15: Shasta Creek Zone

    Slide 15: Shasta Creek Zone

    Shasta Creek Zone Hole From (m) To (m) Au oz/t Ag oz/t Au eq oz/t z Well defined zone of mineralization DD06-21 46.3 59.6 0.343 21.01 0.763 DD06-17 14.9 17.0 0.245 10.10 0.447 DD06-16 62.3 63.7 0.391 13.01 0.651 DD06-09 DD06-07 38.8 47.9 53.8 50.6 0.257 0.421 10.00 3.22 0.457 0.485 z 112 drillholes

  16. Slide 16: Shasta Creek Zone

    Slide 16: Shasta Creek Zone

    Shasta Creek Zone Planned Existing Zone of underground underground mineralization development development (bright yellow) (dark yellow)

  17. Slide 17: Sable's Mill

    Slide 17: Sable's Mill

    go SABLE RESOURC

  18. Slide 18: On-Site Processing

    Slide 18: On-Site Processing

    On-Site Processing z Built for DuPont Canada in 1979 z Designed by Kilborn Engineering (cost over $45 million) z Expanded by Sable in 1991 to 250 tonnes per day z Well maintained with efficiency upgrades z Easily expandable to 500 tpd. z 2 million litres of fuel storage for year round production

  19. Slide 19: Baker Camp

    Slide 19: Baker Camp

    Baker Camp

  20. Slide 20: Outlook 2007

    Slide 20: Outlook 2007

    Outlook 2007 z Develop Creek Zone Decline - Q2 z Funding from Working Capital z Production from Creek Zone - Summer 2007 onwards. z Exploration: $1 Million Budget z Target high grade Ridge zone z Expand Creek zone at Shasta z Explore new targets at Shasta z Test Black Gossan at depth z Test Perry Ma

Source: Internet Archive copy of sableresources.com

More decks from Sable Resources Ltd.

All 8 Sable Resources decks