Pivotal Metals Limited · ASX:PVT

Pivotal Metals — Investor Presentation (September 2026)

37 slides from Pivotal Metals's investor presentation, Sep 29, 2026

  1. Slide 1: Pivotal Metals Investor Presentation: Horden Lake Scoping Study

    Pivotal Metals Investor Presentation Horden Lake Scoping Study September 2026 ASX:PVT Copper in a Tier-1 Jurisdiction

  2. Slide 2: Disclaimers

    Disclaimers The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe such restrictions. DIS

  3. Slide 3: Disclaimers: Horden Lake Scoping Study

    Disclaimers HORDEN LAKE SCOPING STUDY This presentation contains the results of a Scoping Study (Study) undertaken to assess the potential viability of the Horden Lake Project (Project). The Study is a preliminary, order-of-magnitude technical and economic assessment prepared to an AACE Internationa

  4. Slide 4: Investment highlights

    Investment highlights Horden Lake (100%) Advanced pre-development copper project Corvette PMET ~A$920M ~49% 1.3 yrs 29kt Li-FT Power Andina post-tax NPV₇ post-tax IRR payback CuEq a year, yrs 1–8 • Large copper endowment. 52Mt @ 1.05% CuEq1 Rio Tinto • Simple development. Open pit, flotation, two cl

  5. Slide 5: Horden Lake Scoping Study Highlights

    Horden Lake Scoping Study Highlights 5

  6. Slide 6: Scoping Study key outcomes

    Scoping Study key outcomes POST-TAX NPV₇ PRE-TAX IRR POST-TAX IRR PAYBACK AISC ~A$920M ~56% ~49% 1.3 years US$1.00/lb ungeared, real. US$5.50/lb Cu ungeared ungeared post-tax, from first production Cu, net of by-product credits Spot A$1,343M Spot 75% Spot 63% Spot 1.0 years Spot US$0.71/lb PRE-PRODU

  7. Slide 7: 29kt CuEq a year, and room to grow

    29kt CuEq a year, and room to grow Annual payable production, kt CuEq Cu (Cu kt) By-products in kt CuEq (Ni, Co, Au, Ag, PGM) SCALEABLE PRODUCTION Years 1–8: 29kt CuEq/a average 247kt CuEq 160kt Cu 29kt CuEq/a average, years 1–8 Inferred conversion Ni 20kt · Co 1.0kt · Au 83koz · Ag 5.9Moz · Pd 29ko

  8. Slide 8: Mid-scale pre-developer space is small, but alive

    Mid-scale pre-developer space is small, but alive ASX copper pre-development projects, annual CuEq production (kt) > $1b capex 60 Other pre-study copper M&A 50 - Hammer Metals (Austral) - Mutaroo (Hillgrove JV) - Cygnus (CAML) 40 - Mattera/Mt Cuthbert (AIC) CuEq, kt/a 30 ~A$1.1B market cap 20 Fully

  9. Slide 9: Robust economics, leveraged to copper

    Robust economics, leveraged to copper Pre-tax NPV₇ sensitivity Base case Spot Cu US$5.50/lb Cu US$6.78/lb Base A$1,333M Post-tax NPV₇ A$920M A$1,343M Cu Price 1,009 1,656 1,961 -15% / +15% Post-tax IRR 49% 63% US$4.68/lb US$5.50/lb US$6.33/lb Spot: US$6.78/lb Pre-tax NPV₇ / IRR A$1,333M 56% A$1,961M

  10. Slide 10: Horden Lake trades at 2% of its NPV

    Horden Lake trades at 2% of its NPV P/NPV, post-tax 0.63x 0.55x 0.26x P/NPVx 0.16x 0.02x 0.03x 0.04x LoM production scale CuEq per annum 34kt 35kt 26kt LoM kt CuE/a 16kt 15kt 13kt 9kt Horden Lake (PVT) Thursday's G (SVY) Elizabeth Ck (COD) Storm (AW1) Orlando (CUF) Green Bay (FFM) Greater D (CNB) 10

  11. Slide 11: Strong cash flow drives robust returns & low costs

    Strong cash flow drives robust returns & low costs Annual & Cumulative Cashflow NSR by concentrate NSR by metal 600 1,500 Payback 1.3 years Silver Nickel A$1,369M 17% 11% Gold… 438 Nickel Copper Cumulative FCF, A$M 391 Copper Annual cash flow, A$M 10% 65% 352 83% 300 750 306 307 306 284 252 89 Unit

  12. Slide 12: Simple by design

    Simple by design Open pit mine Flotation plant Concentrates Tier 1 Jurisdiction 34Mt 0.90% 3.5Mtpa 92% 29kt 160kt 10km 99% production target1 LoM CuEq2 plant, ~10-yr life Cu recovery CuEq y1-8 LoM Cu prod. to highway renewable grid • Shallow deposit with minimal • Conventional flotation • Saleable g

  13. Slide 13: Single open pit feeds 3.5Mtpa plant

    Single open pit feeds 3.5Mtpa plant Production Target Summary Mine plan vs 2026 MRE Scoping pit shell 60Mt 1.3% 1.1% 1.1% 1.0% 1.0% 1.0% 2026 MRE block model 0.9% 0.9% 40Mt 34Mt 7.9:1 ~10 yrs 3 mill feed LoM strip ratio at 3.5Mtpa mining phases 20Mt • Conventional truck-and-shovel, owner-operated fl

  14. Slide 14: Conventional flowsheet makes two clean concentrates

    Conventional flowsheet makes two clean concentrates LoM recovery by payable metal1 Rougher & regrind Copper 92% Silver 75% Gold 64% Palladium 60% Nickel 49% Crush & stockpile SAG + ball mill Cobalt 44% Platinum 28% Processing at a glance • Standard crush–grind–float flowsheet Copper cleaners Nickel

  15. Slide 15: Horden Lake 51,814m of drilling: Rapidly Growing Resource

    Horden Lake 51,814m of drilling Rapidly Growing Resource Tonnes CuEq (%) Mt CuEq kt CuEq % Cu % Ni % Au g/t Pd g/t Pt g/t Ag g/t Co ppm (mt) 60 1.2 In-pit 45.5 485 1.07 0.56 0.17 0.15 0.14 0.04 10.5 140 Out-of-pit 6.9 64 0.93 0.51 0.18 0.08 0.14 0.03 8.5 151 Total 52.4 549 1.05 0.56 0.17 0.14 0.14 0

  16. Slide 16: Open at depth and along strike, conductors undrilled

    Open at depth and along strike, conductors undrilled 2,800m Growth pathways • Limited by drilling: every hole into the Contact Zone is mineralised 250m North and south flanks • Mine plan uses a subset of the 52Mt undrilled below 200-250m MRE Only 8 holes below 300m • Remainder of MRE sits adjacent o

  17. Slide 17: Lorraine Scale Potential

    Lorraine Scale Potential - Copper – regional Past producing with exciting gold and copper targets Significant potential to make additional discoveries Magnetics demonstrate scale opportunity • Classic magmatic Cu-Ni-PGM sulphide mineralization at the contact, base of a large regional mafic intrusion

  18. Slide 18: Permitting & ESG

    Permitting & ESG Clear permitting process in Eeyou Istchee Cree Territory (Eeyou Istchee) Deposit lies within the traditional territory of the Cree Nation of Nemaska, on N18 trapline. Adjacent to Cree Nation of Waskaganish & N06 trapline Community Commitment Prioritising strong relationships based o

  19. Slide 19: Next steps

    Next steps Exploration: Resource Conversion and Deposit Growth Scoping Study Pre-Feasibility Feasibility Detail Engineering Construction Environmental Baseline + Stakeholder Engagement ESIA approval A$920m NPV7, 49% IRR 2026 MRE Update Summer 2026 complete Grow and de-risk the resource Advance the e

  20. Slide 20: Belleterre Projects

    Belleterre Projects 20

  21. Slide 21: Belleterre Projects 200 km2

    Belleterre Projects 200 km2 Well established mineralising system Strategic greenstone belt landholding that is wildly underexplored 100% controlled, consolidated by Pivotal • Intensely mineralised system active at a regional scale • Drilling hyper-biased to 1960s outcropping discoveries. Prior minin

  22. Slide 22: Lorraine Mine – new targets in underexplored trend

    Lorraine Mine – new targets in underexplored trend Bonanza grade gold target Bonanza gold grades: Au-Cu quartz vein system encountered during 1960’s Cu-Ni mining • 28m @ 45.2 g/t Au & 3.2% Cu (6th level u/g crosscut) • 9.5m @ 14.1 g/t Au & 3.2% Cu (6th level u/g crosscut) • 1m @ 56.2 g/t Au (DDH U-6

  23. Slide 23: Midrim Project

    Midrim Project Strongest concentration of occurrences Globally significant mineralisation • 21.1m @ 2.5% Cu, 1.7% Ni & 2.8 g/t 3PGE (from 29m, Midrim) • 14.4m @ 2.8% Cu, 2.4% Ni & 4.1 g/t 3PGE (from 57m, Midrim) • 24.2m @ 2.3% Cu, 1.2% Ni & 1.9 g/t 3PGE (from 53m, Alotta) • 15.7m @ 3.1% Cu, 1.6% Ni

  24. Slide 24: Bambino Acquisition

    Bambino Acquisition Strategic Consolidation New option agreement, PVT to earn 100% Consolidates a 6km trend of high-grade Cu- Ni-PGM occurrences Lack of modern exploration • Zullo last drilled 1987, Delphi-Patry 2002 • Fragmented ownership Vast gabbro host, with interpreted fold limb and noses • Ide

  25. Slide 25: Corporate overview

    Corporate overview Experience, Commitment, Alignment $0.035 Volume 30 Close Ivan Fairhall Simon Gray $0.030 25 Managing Director & CEO Independent Non-Exec Chair ▪ Chartered engineer, 20 years across mining, ▪ Lawyer with a strong capital markets $0.025 Volumne (M shares) finance and capital markets

  26. Slide 26: Investment Highlights

    Investment Highlights EXPLORATION VALUE IS FULLY FUNDED PREMIER COPPER ENGINE UNDERPINNED CATALYSTS JURISDICTION LEVERAGE • Horden Lake • Horden Lake • Surfacing of • Quebec is skills and • Clear structural production target trading at 0.02x strategic value infrastructure rich, supply constraints, i

  27. Slide 27: Appendix

    Appendix

  28. Slide 28: Scoping Study Supplementary Information

    Scoping Study Supplementary Information Mine Production Profile LoM Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 ROM (kt) 34,032 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 2,532 Cu (%) 0.54% 0.81% 0.64% 0.66% 0.51% 0.50% 0.65% 0.59% 0.64% 0.19% 0.14% Ni (%) 0.16%

  29. Slide 29: Scoping Study Supplementary Information

    Scoping Study Supplementary Information Capital costs, A$M Economics Pre- Cash Flow, Valuation & Returns Base Spot Area Sustaining Total LoM production Mining Equip & Facilities 47 206 253 Pre-tax free cash flow (inc. capex) A$M 1,973 2,818 Mining Pre-strip 14 - 14 Post-tax free cash flow (inc. cape

  30. Slide 30: Québec – premier mining jurisdiction

    Québec – premier mining jurisdiction ‘Flow-through scheme’ tax incentives With tangible • Quebec has the highest tax credit in investment incentives Canada for critical metals exploration • Up to 2x leverage on money raised, without structural overhang Access to low-cost Excellent infrastructure ren

  31. Slide 31: Geological Setting – Horden Lake deposit

    Geological Setting – Horden Lake deposit Strong structural control for mineralisation • Mineralisation style supports good potential for resource extension • Magmatic sulphide deposit associated with mafic and ultramafic rocks • Mineralisation occurs along the contact of the gabbroic complex and met

  32. Slide 32: Midrim-Alotta deeps

    Midrim-Alotta deeps Section 1 2 3 MT survey showing major conductive anomalies that link the string of pearls • Major regional system potential that links multiple high-grade surface bodies • 2023 MT survey has confirmed mafic contact deposit model hypothesis • Extensive contact ‘host horizon mapped

  33. Slide 33: Appendix: 2026 JORC Mineral Resource Estimate

    Appendix Refer ASX announcement dated 7 July 2026 for full MRE technical disclosure. The Mineral Resource Statement considers the portions of the resource within the optimised pit shell at a cut-off of US$25/t NSR, 2026 JORC Compliant and the portions of the mineral resources outside (below) the opt

  34. Slide 34: References

    References Economic Parameters, Grade Based CuEq Equation (HL) Full Assay Breakdown of Referenced Drillholes Width Element Unit Price Recovery Sales Cost Factor Hole ID (m) CuEq Cu% Ni% Au g/t Pd g/t Ag g/t Pt g/t Co ppm From (m) Copper USD/t 11,000 90% 1,100 1.00 HN-24-98 32.1 0.96 0.57 0.19 0.08 0

  35. Slide 35: Supporting information – referenced project details

    Supporting information – referenced project details ASX Pre-Development Copper Projects LoM Production Average Annual Production LoM Project Company Study / Stage Study Date Reference Au Non-Cu (t (years) Cu (kt) Ag (oz) Zn (t) Ni Pt Pd Co Pb (t) CuEq total Cu (t/a) CuEq (t/a) (oz) CuEq) American We

  36. Slide 36: Supporting information – referenced project details

    Supporting information – referenced project details P/NAV pre-development peer group Company Latest Post-tax Mkt Cap Discount Cu Price Project Study / Stage (A$m) Cash EV P/NAV NPV Rate (US$/lb) Study Date ASX Announcement (A$m) (A$m) Ticker Name https://cdn-api.markitdigital.com/apiman-gateway/ASX/

  37. Slide 37: Pivotal Metals Limited

    Pivotal Metals Limited ABN 49 623 130 987 Level 10, 360 Queen Street Brisbane QLD 4000 GPO Box 2517 WA 6831 T: +61 8 9481 0389 E: info@pivotalmetals.com W: www.pivotalmetals.com

Pivotal Metals — Investor Presentation (September 2026) on 6ix