Pivotal Metals Limited · ASX:PVT

Pivotal Metals — 121 London Conference 2026

37 slides from Pivotal Metals's conference presentation, November 2026

  1. Slide 1: Copper in Québec Investor Presentation

    Slide 1: Copper in Québec Investor Presentation

    r personal use only Copper in Québec Investor Presentation 121 London Conference November 2026 ASX:PVT Simple. Low cost. Significant upside

  2. Slide 2: Disclaimers

    Slide 2: Disclaimers

    Disclaimers r personal use only The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe su

  3. Slide 3: Disclaimers: Horden Lake Scoping Study

    Slide 3: Disclaimers: Horden Lake Scoping Study

    Disclaimers r personal use only HORDEN LAKE SCOPING STUDY This presentation contains the results of a Scoping Study (Study) undertaken to assess the potential viability of the Horden Lake Project (Project). The Study is a preliminary, order-of-magnitude technical and economic assessment prepared to

  4. Slide 4: Investment highlights

    Slide 4: Investment highlights

    Investment highlights r personal use only Horden Lake (100%) Advanced pre-development copper project Corvette PMET ~A$920M 1 ~49% 1.3 yrs 29kt Li-FT Power Andina post-tax NPV₇ post-tax IRR payback CuEq a year, yrs 1–8 • Large copper endowment. 52Mt @ 1.05% CuEq1 Rio Tinto • Simple development. Open

  5. Slide 5: Horden Lake Scoping Study Highlights

    Slide 5: Horden Lake Scoping Study Highlights

    r personal use only Horden Lake Scoping Study Highlights 5

  6. Slide 6: Scoping Study key outcomes

    Slide 6: Scoping Study key outcomes

    Scoping Study key outcomes r personal use only POST-TAX NPV₇ PRE-TAX IRR POST-TAX IRR PAYBACK AISC ~A$920M ~56% ~49% 1.3 years US$1.00/lb ungeared, real. US$5.50/lb Cu ungeared ungeared post-tax, from first production Cu, net of by-product credits Spot A$1,343M Spot 75% Spot 63% Spot 1.0 years Spot

  7. Slide 7: Mid-scale pre-developer space is small, but alive

    Slide 7: Mid-scale pre-developer space is small, but alive

    Mid-scale pre-developer space is small, but alive r personal use only ASX copper pre-development projects, annual CuEq production (kt) > $1b capex 60 Other pre-study copper M&A 50 - Hammer Metals (Austral) - Mutooroo (Hillgrove JV) - Cygnus (CAML) 40 - Mattera/Mt Cuthbert (AIC) CuEq, kt/a 30 ~A$1.1B

  8. Slide 8: Horden Lake trades at 2% of its NPV

    Slide 8: Horden Lake trades at 2% of its NPV

    Horden Lake trades at 2% of its NPV r personal use only P/NPV, post-tax 0.63x 0.30x P/NPVx 0.12x 0.12x 0.02x 0.02x 0.03x Pre-tax LoM production scale CuEq per annum 34kt 35kt 26kt LoM kt CuEq/a 21kt 16kt 13kt 9kt Thursday's G (SVY) Horden Lake (PVT) Elizabeth Ck (COD) Orlando (CUF) Storm (AW1) Green

  9. Slide 9: Robust economics, leveraged to copper

    Slide 9: Robust economics, leveraged to copper

    Robust economics, leveraged to copper r personal use only Base case Spot Pre-tax NPV₇ sensitivity Cu US$5.50/lb Cu US$6.78/lb Cu Price 1,009 1,656 1,961 -15% / +15% Post-tax NPV₇ A$920M A$1,343M US$4.68/lb US$5.50/lb US$6.33/lb Spot: US$6.78/lb Other metals 1,158 1,508 Post-tax IRR 49% 63% -15% / +1

  10. Slide 10: Strong production and cashflow

    Slide 10: Strong production and cashflow

    Strong production and cashflow r personal use only Annual payable production, kt CuEq Cu (Cu kt) By-products (in kt CuEq) Inferred conversion SCALEABLE PRODUCTION 37kt 31kt 30kt 29kt 30% of mine plan Inferred; infill drilling 28kt 247kt CuEq 160kt Cu 25kt 26kt 27kt Resource growth 29kt CuEq/a averag

  11. Slide 11: Simple by design

    Slide 11: Simple by design

    Simple by design r personal use only Open pit mine Flotation plant Concentrates Tier 1 Jurisdiction 34Mt 0.90% 3.5Mtpa 92% 29kt 160kt 10km 99% production target1 LoM CuEq2 plant, ~10-yr life Cu recovery CuEq y1-8 LoM Cu prod. to highway renewable grid • Shallow deposit with minimal • Conventional fl

  12. Slide 12: Single open pit feeds 3.5Mtpa plant

    Slide 12: Single open pit feeds 3.5Mtpa plant

    Single open pit feeds 3.5Mtpa plant r personal use only Production Target Summary Mine plan vs 2026 MRE Scoping pit shell 60Mt 1.3% 1.1% 1.1% 1.0% 1.0% 1.0% 2026 MRE block model 0.9% 0.9% 40Mt 34Mt 7.9:1 ~10 yrs 3 mill feed LoM strip ratio at 3.5Mtpa mining phases 20Mt • Conventional truck-and-shove

  13. Slide 13: Conventional flowsheet makes two clean concentrates

    Slide 13: Conventional flowsheet makes two clean concentrates

    Conventional flowsheet makes two clean concentrates r personal use only LoM recovery by payable metal1 Rougher & regrind Copper 92% Silver 75% Gold 64% Palladium 60% Nickel 49% Crush & stockpile SAG + ball mill Cobalt 44% Platinum 28% Processing at a glance • Standard crush–grind–float flowsheet Cop

  14. Slide 14: Rapidly Growing Resource

    Slide 14: Rapidly Growing Resource

    Horden Lake 51,814m r personal use only of drilling Rapidly Growing Resource Tonnes CuEq (%) Mt CuEq kt CuEq % Cu % Ni % Au g/t Pd g/t Pt g/t Ag g/t Co ppm (mt) 60 1.2 In-pit 45.5 485 1.07 0.56 0.17 0.15 0.14 0.04 10.5 140 Out-of-pit 6.9 64 0.93 0.51 0.18 0.08 0.14 0.03 8.5 151 Total 52.4 549 1.05 0

  15. Slide 15: Open at depth and along strike, conductors undrilled

    Slide 15: Open at depth and along strike, conductors undrilled

    Open at depth and along strike, conductors undrilled r personal use only 2,800m Growth pathways • Limited by drilling: every hole into the Contact Zone is mineralised 250m North and south flanks • Mine plan uses a subset of the 52Mt undrilled below 200-250m MRE Only 8 holes below 300m • Remainder of

  16. Slide 16: Permitting & ESG

    Slide 16: Permitting & ESG

    Permitting & ESG r personal use only Clear permitting process in Eeyou Istchee Cree Territory (Eeyou Istchee) Deposit lies within the traditional territory of the Cree Nation of Nemaska, on N18 trapline. Adjacent to Cree Nation of Waskaganish & N06 trapline Community Commitment Prioritising strong r

  17. Slide 17: Belleterre Project

    Slide 17: Belleterre Project

    r personal use only Belleterre Project 17

  18. Slide 18: Belleterre Projects

    Slide 18: Belleterre Projects

    Belleterre Projects 200 km2 r personal use only Well established mineralising system Strategic greenstone belt landholding that is wildly underexplored 100% controlled, consolidated by Pivotal • Intensely mineralised system active at a regional scale • Drilling hyper-biased to 1960s outcropping disc

  19. Slide 19: Midrim Project

    Slide 19: Midrim Project

    Midrim Project r personal use only Strongest concentration of occurrences Globally significant mineralisation • 21.1m @ 2.5% Cu, 1.7% Ni & 2.8 g/t 3PGE (from 29m, Midrim) • 14.4m @ 2.8% Cu, 2.4% Ni & 4.1 g/t 3PGE (from 57m, Midrim) • 24.2m @ 2.3% Cu, 1.2% Ni & 1.9 g/t 3PGE (from 53m, Alotta) • 15.7m

  20. Slide 20: Bambino Acquisition

    Slide 20: Bambino Acquisition

    Bambino Acquisition r personal use only Strategic Consolidation New option agreement, PVT to earn 100% Consolidates a 6km trend of high-grade Cu- Ni-PGM occurrences Lack of modern exploration • Zullo last drilled 1987, Delphi-Patry 2002 • Fragmented ownership Vast gabbro host, with interpreted fold

  21. Slide 21: LaForce & Shanty Lake

    Slide 21: LaForce & Shanty Lake

    LaForce & Shanty Lake r personal use only LaForce Shanty Lake Established mineralising system IP has substantially enlarged the search space Bonanza Drilling and DHEM has refined thegrade target gold target • 102.7m @ 0.39% Cu, 0.76% Ni from 1.3m • 1.4km untested IP trend extending from the • 350x14

  22. Slide 22: Lorraine Mine – new targets in underexplored trend

    Slide 22: Lorraine Mine – new targets in underexplored trend

    Lorraine Mine – new targets in underexplored trend r personal use only Bonanza grade gold target Bonanza gold grades: Au-Cu quartz vein system encountered during 1960’s Cu-Ni mining • 28m @ 45.2 g/t Au & 3.2% Cu (6th level u/g crosscut) • 9.5m @ 14.1 g/t Au & 3.2% Cu (6th level u/g crosscut) • 1m @

  23. Slide 23: Next steps

    Slide 23: Next steps

    Next steps r personal use only Exploration: Resource Conversion and Deposit Growth Scoping Study Pre-Feasibility Feasibility Detail Engineering Construction Environmental Baseline + Stakeholder Engagement ESIA approval A$920m NPV7, 49% IRR 2026 MRE Update Summer 2026 complete Grow and de-risk the re

  24. Slide 24: Investment Highlights

    Slide 24: Investment Highlights

    Investment Highlights r personal use only EXPLORATION VALUE IS VALUE PREMIER COPPER ENGINE UNDERPINNED CATALYSTS JURISDICTION LEVERAGE • Horden Lake • Horden Lake • Surfacing of • Québec is skills and • Clear structural production target trading at 0.02x strategic value infrastructure rich, supply c

  25. Slide 25: Corporate overview

    Slide 25: Corporate overview

    Corporate overview r personal use only Experience, Commitment, Alignment $0.030 30 Volume Close Ivan Fairhall Simon Gray $0.025 25 Managing Director & CEO Independent Non-Exec Chair  Chartered engineer, 20 years across mining,  Lawyer with a strong capital markets Volumne (M shares) finance and ca

  26. Slide 26: Appendix

    Slide 26: Appendix

    r personal use only Appendix

  27. Slide 27: Lorraine

    Slide 27: Lorraine

    Lorraine Scale Potential - Copper – regional Past producing with exciting gold and copper targets r personal use only Significant potential to make additional discoveries Geophysics demonstrate scale opportunity • Classic magmatic Cu-Ni-PGM sulphide mineralization at the contact, base of a large reg

  28. Slide 28: Scoping Study Supplementary Information

    Slide 28: Scoping Study Supplementary Information

    Scoping Study Supplementary Information r personal use only Mine Production Profile LoM Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 ROM (kt) 34,032 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 2,532 Cu (%) 0.54% 0.81% 0.64% 0.66% 0.51% 0.50% 0.65% 0.59% 0.64% 0.19

  29. Slide 29: Scoping Study Supplementary Information

    Slide 29: Scoping Study Supplementary Information

    Scoping Study Supplementary Information r personal use only Capital costs, A$M Economics Pre- Cash Flow, Valuation & Returns Base Spot Area Sustaining Total LoM production Mining Equip & Facilities 47 206 253 Pre-tax free cash flow (inc. capex) A$M 1,973 2,818 Mining Pre-strip 14 - 14 Post-tax free

  30. Slide 30: Québec – premier mining jurisdiction

    Slide 30: Québec – premier mining jurisdiction

    Québec – premier mining jurisdiction r personal use only ‘Flow-through scheme’ tax incentives With tangible • Québec has the highest tax credit in investment incentives Canada for critical metals exploration • Up to 2x leverage on money raised, without structural overhang Access to low-cost Excellen

  31. Slide 31: Geological Setting – Horden Lake deposit

    Slide 31: Geological Setting – Horden Lake deposit

    Geological Setting – Horden Lake deposit r personal use only Strong structural control for mineralisation • Mineralisation style supports good potential for resource extension • Magmatic sulphide deposit associated with mafic and ultramafic rocks • Mineralisation occurs along the contact of the gabb

  32. Slide 32: Midrim-Alotta deeps

    Slide 32: Midrim-Alotta deeps

    Midrim-Alotta deeps r personal use only Section 1 2 3 MT survey showing major conductive anomalies that link the string of pearls • Major regional system potential that links multiple high-grade surface bodies • 2023 MT survey has confirmed mafic contact deposit model hypothesis • Extensive contact

  33. Slide 33: Appendix: 2026 JORC Mineral Resource Estimate

    Slide 33: Appendix: 2026 JORC Mineral Resource Estimate

    Appendix r personal use only Refer ASX announcement dated 7 July 2026 for full MRE technical disclosure. The Mineral Resource Statement considers the portions of the resource within the optimised pit shell at a cut-off of US$25/t NSR, 2026 JORC Compliant and the portions of the mineral resources out

  34. Slide 34: References

    Slide 34: References

    References r personal use only Economic Parameters, Grade Based CuEq Equation (HL) Full Assay Breakdown of Referenced Drillholes Width Element Unit Price Recovery Sales Cost Factor Hole ID (m) CuEq Cu% Ni% Au g/t Pd g/t Ag g/t Pt g/t Co ppm From (m) Copper USD/t 11,000 90% 1,100 1.00 HN-24-98 32.1 0

  35. Slide 35: Supporting information – ASX Pre-Development Copper Projects

    Slide 35: Supporting information – ASX Pre-Development Copper Projects

    Supporting information – referenced project details r personal use only ASX Pre-Development Copper Projects LoM Production Average Annual Production LoM Project Company Study / Stage Study Date Reference Au Non-Cu (t (years) Cu (kt) Ag (oz) Zn (t) Ni Pt Pd Co Pb (t) CuEq total Cu (t/a) CuEq (t/a) (o

  36. Slide 36: Supporting information – P/NAV pre-development peer group

    Slide 36: Supporting information – P/NAV pre-development peer group

    Supporting information – referenced project details r personal use only P/NAV pre-development peer group Company Latest Post-tax Mkt Cap Discount Cu Price Project Study / Stage (A$m) Cash EV P/NAV NPV Rate (US$/lb) Study Date ASX Announcement (A$m) (A$m) Ticker Name https://cdn-api.markitdigital.com

  37. Slide 37: Pivotal Metals Limited

    Slide 37: Pivotal Metals Limited

    r personal use only Pivotal Metals Limited ABN 49 623 130 987 Level 10, 360 Queen Street Brisbane QLD 4000 GPO Box 2517 WA 6831 T: +61 8 9481 0389 E: info@pivotalmetals.com W: www.pivotalmetals.com

Source: ASX announcement, Nov 23, 2026

More decks from Pivotal Metals Limited

All 21 Pivotal Metals decks