PT ANTAM (Persero) Tbk · IDX:ANTM

PT ANTAM (Persero) Tbk — PT Antam — Non-Deal Roadshow (May 2008)

27 slides from PT ANTAM (Persero) Tbk's roadshow presentation, May 2008

  1. Slide 1: Poised For Growth

    Slide 1: Poised For Growth

    Poised For Growth PT Antam Tbk An Overview of Performance and Outlook Global NDR and Conference May 2008

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer • We are not in a position to advise you, we are not advising you and the contents of this presentation must not be you, construed as any advice to you, on (a) whether to purchase any of our securities or, (b) if you hold an investment in our securities, the value of your investment or ho

  3. Slide 3: Our Key Message

    Slide 3: Our Key Message

    Our Key Message • We are poised for growth and with large reserves and resources and good partnerships, partnerships we will create substantial value in the years to come. • We W h have a strong t g and d strengthening t gth i g fifinancial i l structure, healthy cash flows and a large project pipel

  4. Slide 4: Got Three Minutes? Consider:

    Slide 4: Got Three Minutes? Consider:

    Got Three Minutes? Consider: • Diversified. Vertically-Integrated. Indonesian. Experienced. • Gold. Nickel. Bauxite. A great mix. • Large quality reserves and resources. • Low cost operations. p • Unique position to lower costs. • Industry-beating margins and returns. returns • Possible ferronickel

  5. Slide 5: How Antam Makes Its Money

    Slide 5: How Antam Makes Its Money

    How Antam Makes Its Money • Profitably exploring, discovering, excavating, processing and refining mineral deposits and then selling them around the world as we have been doing for four decades – locate and add to our vast reserves and resources – develop those deposits with a view to extracting max

  6. Slide 6: How Antam Makes Its Money

    Slide 6: How Antam Makes Its Money

    How Antam Makes Its Money DIVERSE PRODUCT MIX EXPORT ORIENTED* 41% 1% 9% RPS, 79 3pinion 48% RP4, 769 eaon Ferronickel = Nickel Ore Eastern Euro Gold Bauxite Silver RP 1 30oa00 Japan China

  7. Slide 7: Our Strategy

    Slide 7: Our Strategy

    Our Strategy • We will create maximum shareholder value by: y – diversify horizontally into other commodities where suitable – focus on those commodities we know best, which are nickel, gold and bauxite. – diversify through an active exploration program and through strategic acquisitions – maintain

  8. Slide 8: Vertically-Integrated, Diversified

    Slide 8: Vertically-Integrated, Diversified

    Vertically--Integrated, Diversified Vertically CGA Tayan Project Mornopo (Bauxite) (Nickel Ore) Gee Geomin (Nickel Ore) (Exploration Unit) Pomalaa (Ferronickel and Tanjung Buli Kijang Nickel Ore) (Nickel Ore) (Bauxite) Pearl FeNi IV Logam Mulia Project (Precious Metals (Nickel) Refinery and Pearl Pr

  9. Slide 9: Minority Joint Ventures – Blue Sky

    Slide 9: Minority Joint Ventures – Blue Sky

    Minority Joint Ventures – Blue Sky PT Dairi Prima Minerals PT Pelsart Tambang Kencana (Base Metals) 20% (Gold) 15% PT Gorontalo PT Nusa Halmahera PT Galuh Cempaka Minerals Minerals (Diamond) 20% (Gold) 20% (Gold) 17.5% PT Sorikmas Mining (G ld) 25% (Gold) PT Cibaliung PT Straits PT Sumbawa PT Weda B

  10. Slide 10: What it All Boils Down to: Our Large Resources and Reserves

    Slide 10: What it All Boils Down to: Our Large Resources and Reserves

    What it All Boils Down to: Our Large R Resources and dR Reserves

  11. Slide 11: Quarterly Income

    Slide 11: Quarterly Income

    Quarterly Income (Rp Billi (R Billion)) 3000 2386 2500 2092 2000 1425 1500 937 1000 600 1073 675 566 563 402 500 218 222 148 92 147 196 131 0 62 1Q03 1Q04 1Q05 1Q06 1Q07 1Q08 Sales Operating Profit Net Profit * FY07 results are unaudited

  12. Slide 12: Significant and Consistent Annual Income and Margin Growth

    Slide 12: Significant and Consistent Annual Income and Margin Growth

    Significant and Consistent Annual Income and Margin Growth (Rp Billi (R Billion)) 14000 12008 12000 10000 8000 6796 5629 6000 5132 4000 3251 2859 2139 2404 1771 2000 1097 1100 247 448 227 810 1553 0 177 842 2002 2003 2004 2005 2006 2007 Sales Operating Profit Net Profit * FY07 results are unaudited

  13. Slide 13: First Quarter 08 Performance

    Slide 13: First Quarter 08 Performance

    First Quarter 08 Performance Comparison Description 1Q07 1Q08 (%) Sales 2 386 2,386 2 092 2,092 -12 12 COGS 884 1,061 20 Operating p g Income 1,425 937 -34 34 Net Income 1,073 675 -37 Net Margin g 45% 32% -29 Assets 8,178 12,004 47 Cash , 2,095 4,568 , 118 Total LT Debt 891 685 -23 Long Term Debt /

  14. Slide 14: Solid Annual Performance

    Slide 14: Solid Annual Performance

    Solid Annual Performance Comparison Description 2006 2007 (%) Sales 5 629 5,629 12 008 12,008 113% COGS 2,888 4,795 66% Operating p g Income 2,404 6,796 183% Net Income 1,553 5,132 230% Net Margin g 28% 43% 54% Assets 7,291 12,038 75% Cash , 1,194 4,744 , 297% Total LT Debt 1,070 700 -35% Long Term

  15. Slide 15: FeNi III – Holding Stable

    Slide 15: FeNi III – Holding Stable

    FeNi III – Holding Stable ● FeNi III is currently running at 32MW ● Rather than a complete redesign we seek to optimalize the design we have ● The repairs were covered under warranty. ● Big leap in size and new cooling system require time to get used to ● However, no bells or alarms went off at time

  16. Slide 16: Low Cost Operations – except FeNi

    Slide 16: Low Cost Operations – except FeNi

    Low Cost Operations – except FeNi

  17. Slide 17: Productive and Improving Workforce

    Slide 17: Productive and Improving Workforce

    Productive and Improving Workforce

  18. Slide 18: Industry Beating Margins and Returns

    Slide 18: Industry Beating Margins and Returns

    Industry dust y Beating eat g Margins a g sa and d Returns etu s Antam’s net profit margin was 43% in full year 2007 Source: PWC mineIndonesia 2006

  19. Slide 19: Production and Sales Outlook

    Slide 19: Production and Sales Outlook

    Production and Sales Outlook • In order to maintain safety and prevent further leakages, Antam currently operates the smelter at 30-32 megawatts. • Antam targets 2008 production of 17,000 tonnes of nickel contained in ferronickel. • In 2008, depending on demand from China, Antam expects t nickel i k

  20. Slide 20: Sources of Future Growth

    Slide 20: Sources of Future Growth

    Sources of Future Growth 1 - Indonesia Chemical Alumina (ICA) – (Antam 49%, with an option to increase ownership) ● 300,000 tonnes per annum of CGA20 ● Location: Tayan, y , West Kalimantan ● +US$350 million ● ICA established in February 2007 ● To maximize value of large bauxite reserves ● Attractive

  21. Slide 21: Sources of Future Growth

    Slide 21: Sources of Future Growth

    Sources of Future Growth 3– NCPI/Stainless Steel with Tsingshan (Antam 60%) ● First phase to construct blast furnace and produce nickel contained in pig iron (7,500t of contained nickel). Second phase to produce 200 and 300 series stainless steel ● US$150-$230 US$150 $230 million illi ● Agreement si

  22. Slide 22: Sources of Future Growth

    Slide 22: Sources of Future Growth

    Sources of Future Growth 6–SGA Mempawah with Hangzhou (Antam 55%) ● 1,000,000 tpa of Smelter Grade Alumina ● US$800-US1 billion ● Location: West Kalimantan ● Current progress: JVA, Feasibility studies 7– SGA Munggu Pasir with Rusal (Antam 49%) ● 1,200,000 1 200 000 tpa of Smelter Grade Alumina ● US$

  23. Slide 23: Sources of Future Growth

    Slide 23: Sources of Future Growth

    Sources of Future Growth 8. Acquisition of Herald Resources/PT Dairi Prima (lead/zinc): ● Antam/Zhongjin made takeover bid made for Herald, A$2.50 per share on January 29, 2008 ● Higher valuation then other bid justified due to introduction of experienced partner, Zhongjin ● Zhongjin, at its mine in

  24. Slide 24: Energy Conversion

    Slide 24: Energy Conversion

    Energy Conversion Mornopo, Tg Buli, Gee Kalimantan Lake Poso Tangguh Pomalaa Sengkang ENERGY CONVERSION ALTERNATIVES: 1 1. C l Coal ƒ Pre feasibility study completed on Target: use of SPLC (Smart Predictive Line Control) technology to reduce load ƒ Decision by 2008 and fluctuation. conversion by 201

  25. Slide 25: Big Picture Items:

    Slide 25: Big Picture Items:

    Big Picture Items: ● Regulatory and Investment Climate Improving ● Cautious Optimism ● Mining Law – will it or won’t it get passed. ● Possible upside for Antam as well as Industry ● Debate ongoing regarding the “transition transition period period” of 3-5 3 5 years after law is passed ● Ore Exports

  26. Slide 26: Our Key Message

    Slide 26: Our Key Message

    Our Key Message • We are poised for growth and with large reserves and resources and good partnerships, partnerships we will create substantial value in the years to come. • We W h have a strong t g and d strengthening t gth i g fifinancial i l structure, healthy cash flows and a large project pipel

  27. Slide 27: Thank You Any Question ?

    Slide 27: Thank You Any Question ?

    Thank You Any Question ? Visit our website: www.antam.com

Source: Internet Archive copy of antam.com

More decks from PT ANTAM (Persero) Tbk

All 38 PT ANTAM (Persero) Tbk decks