Athens Water Supply and Sewerage Company S.A. · ATHEX:EYDAP

Athens Water Supply and Sewerage — Eydap — Investor Presentation (December 2006)

57 slides from Athens Water Supply and Sewerage's investor presentation, December 2006

  1. Slide 1: EYDAP S.A. Company Presentation

    Slide 1: EYDAP S.A. Company Presentation

    EΥDΑP S.A. COMPANY PRESENTATION December 2006

  2. Slide 2: Significant Dates

    Slide 2: Significant Dates

    Significant Dates 1925: Contract between the Greek State, the American Company “Ulen” and the Bank of Athens for the construction of the Marathon works and the formation of the Hellenic Water Company (EEY) with Ulen Company and the Bank of Athens each owning 50% 1953: Merger of the Bank of Athens wi

  3. Slide 3: Areas of Jurisdiction

    Slide 3: Areas of Jurisdiction

    EYDAP S.A. - EYDAP Fixed Assets Areas of Jurisdiction

  4. Slide 4: The Climate of Attica

    Slide 4: The Climate of Attica

    The Climate Of Attica Mean annual rainfall (mm) 301- 400 401- 600 601- 00 801-1000 1001-1200 1201-1400 1401-1600 1601-1800 1801-1908

  5. Slide 5: Technical Infrastructure

    Slide 5: Technical Infrastructure

    Technical Infrastructure

  6. Slide 6: Collection and Conveyance of Raw Water to Treatment Plants

    Slide 6: Collection and Conveyance of Raw Water to Treatment Plants

    System for the Collection and Conveyance of Raw Water to the Water Treatment Plants Useful Average Annual Ground Annual Pumping Capacity Capacity Discharge Aquifers (million cu.m.) Reservoirs (million m3) (million cu.m.) Kifissos 136,4 Marathon (1931) 31 14 mean flow Ylili Lake (1958) 584 295 Yliki

  7. Slide 7: Marathon, Yliki Lake, Mornos, Evinos

    Slide 7: Marathon, Yliki Lake, Mornos, Evinos

    Marathon Yliki Lake Mornos Evinos

  8. Slide 8: Conveyance of water to the Water Treatment Plants

    Slide 8: Conveyance of water to the Water Treatment Plants

    Conveyance of water to the Water Treatment Plants Total Length of the External Aqueducts: 496 km Total Discharge Capacity: 530 million m3 per year. ¾ Yliki ¾ Mornos ¾ Joint Aqueducts ¾ External Pumping Stations

  9. Slide 9: Industrial Infrastructure

    Slide 9: Industrial Infrastructure

    Industrial Infrastructure

  10. Slide 10: Industrial Water Treatment Plants

    Slide 10: Industrial Water Treatment Plants

    INDUSTRIAL WATER TREATMENT PLANTS Galatsi Water Treatment Plant (1931) Average Treatment Capacity: 400.000 m3 per day With the completion of works in 2006 the maximum capacity will be 800.000m3 per day Acharnes Water Treatment Plant (1978) Average Treatment Capacity: 600.000 m3 per day

  11. Slide 11: Industrial Water Treatment Plants

    Slide 11: Industrial Water Treatment Plants

    INDUSTRIAL WATER TREATMENT PLANTS Polydendri Water Treatment Plant (1986) Average Treatment Capacity: 200.000 m3 per day Aspropyrgos Water Treatment Plant (1996) Average Treatment Capacity: 200.000 m3 per day

  12. Slide 12: Industrial Wastewater Treatment Plants

    Slide 12: Industrial Wastewater Treatment Plants

    Industrial Wastewater Treatment Plants Psyttalia Wastewater Treatment Plant Capacity: 1.000.000 m3 / day Efficiency Rate: ¾ 35-40% First phase (1994) ¾ 95% Second phase operates since 12/2004 (224 Μ€) Metamorphosis Wastewater Treatment Plant Capacity: 44.000 m3 / day Second phase Efficiency Rate 93%

  13. Slide 13: Production of Electric Power, Industrial Research

    Slide 13: Production of Electric Power, Industrial Research

    PRODUCTION OF ELECTRIC POWER INDUSTRIAL RESEARCH Unit for the cogeneration of electric and thermal power with the use of biogas • Cogeneration of electric power: 7,14MW • Anticipated production capability: ¾ 53.000.000 kWh electric power ¾ 42.000.000 kWh thermal energy Sanitary Engineering Research

  14. Slide 14: Networks

    Slide 14: Networks

    Networks

  15. Slide 15: Water Supply - Sewerage

    Slide 15: Water Supply - Sewerage

    Water Supply - Sewerage Water Supply • 1.100.000 m3/day average water consumption • 56 Water Storage Tanks with a total volume of 868.343 m3 • 8.169 km Total Water Distribution Network Length • 76 Pumping Stations – power 16ΜW • 150.000 safety isolation valves & 500 checking valves • 24-hour Supervi

  16. Slide 16: Water vs Wastewater Supply Projections

    Slide 16: Water vs Wastewater Supply Projections

    Water vs Wastewater Supply Projections Projection of Total Effluent Supply at EYDAP's WWTPs vs Total Water Production 600 TOTAL WATER PRODUCTION / EFFLUENT SUPPLY 450 (hm3 ) 300 150 Historic Water Production (HWP) Linear Trend of HWP (1993-) with 15% reduction of UFW in 2015 Effluent supply based on

  17. Slide 17: Water Consumption

    Slide 17: Water Consumption

    Water Consumption 450 422 409 401 399 400 400 386 367 360 355 342 341 350 334 324 321 318 303 309 300 289 281 279 275 271 268 260 257 252 million m 3 250 200 150 100 50 0 80 82 84 86 88 90 92 94 96 98 00 02 04

  18. Slide 18: Customer Service

    Slide 18: Customer Service

    Customer Service 10 Regional Customer Service Offices Implementation of a new Billing and Customer Care information system since March 2006 24-hour Direct Telephone Hot-Line 24-hour Technical Support www.eydap.gr Reconstructed web-site

  19. Slide 19: Using State-of-the-art Technology

    Slide 19: Using State-of-the-art Technology

    Using State-of-the-art Technology Pipe Network Maintenance ™ Specially Designed Vehicle for the cleaning of stormwater drainage of the combined sewer system ™ 6 tankers specially equipped for sewage network maintenance using recycled wastewater. CCTV Inspection and Maintenance of Pipe Network ™ 5 sm

  20. Slide 20: Quality Control

    Slide 20: Quality Control

    Quality Control Raw Water Reservoirs • 300 chemicals and 200 microbiological tests executed yearly • 60 tests executed yearly for 38 organic micro-pollutants Water Treatment Units • 116 chemical + 44 microbiological determinations daily • 416 chemical analysis regarding metals (28 parameters) yearly

  21. Slide 21: Tariff Policy

    Slide 21: Tariff Policy

    Tariff Policy

  22. Slide 22: Service Pricing

    Slide 22: Service Pricing

    Service Pricing W ATER SU PPLY SEW ERAGE T a r iff C a t e g o r ie s C o n s u m p t io n F ro m F ro m / M o n th 15/12/04 15/12/04 m3 € % * W a t e r p r ic e 0 -5 0 ,3 9 D o m e s t ic 60 % ( O b li g a t o r y C o n s u m p t i o n 5 -2 0 0 ,6 1 o f 2 m 3/m o n th ) 2 0 -2 7 1 ,7 5 42 % g a rd

  23. Slide 23: Fixed Charges

    Slide 23: Fixed Charges

    Fixed Charges C onnection C ategories € C harg e For w ater m eters of 5 / 8 '' & 3 / 4 '' and fo r • Consum ption< 30m 3 1,59 • Consum ption from 30m 3 to 2,46 Q uarterly 60m 3 4,62 • Consum ption > 60m 3 M eter co nnection of 1'' 4,12 M eter co nnection of 1 1 / 2 '' 7,20 M eter co nnection of 2''

  24. Slide 24: Consumption Breakdown by Tariff Category (average 2005)

    Slide 24: Consumption Breakdown by Tariff Category (average 2005)

    Consumption Breakdown by Tariff Category (average 2005) Social Charity 0,11% Other Ships Supply 2,03% Municipalities 0,43% 18,74% Com.Faucets- Piraeus Port 1,12% Domestic Public 64,65% Municipalities 6,75% Industrial- Professional 6,16% Based on a 2002 market-research study, the demand elasticity am

  25. Slide 25: Income Breakdown by Tariff Category (2005)

    Slide 25: Income Breakdown by Tariff Category (2005)

    Income Breakdown by Tariff Category (2005) Social Charity 0,05% Fire Prevention Com. Faucets- 0,06% Other Piraeus Port Municipalities 0,37% 0,74% Support Ships Supply 8,59% 0,94% Public Municipalities 8,41% Industrial- Professional 7,48% Domestic 73,35% • Domestic consumers comprise the major and mo

  26. Slide 26: Income Breakdown by Core Business

    Slide 26: Income Breakdown by Core Business

    Income Breakdown by Core Business • In 2005 the sewerage 350 income percentage 300 increased by 2.4% due to a 92,9 tariff increase regarding 250 75,6 78,9 67,3 industries (sewerage rate increase from 39.2% to 200 60%) M€ 150 • In 2005, the revenues of 100 212,3 218,9 228,2 the Company derived from 1

  27. Slide 27: Low cost Tariff Policy

    Slide 27: Low cost Tariff Policy

    Low cost Tariff Policy Annual Water Charge for Average Consumption 200m3 (2004) 1000 • Only the tariff system of EYDAP and 800 Portuguese SINTRA contain all kinds of charges 600 • The sewerage services of Italian 400 SMA TORINO and German BERLINER are 200 more expensive than the water services 0 • I

  28. Slide 28: Affordable Tariff Policy

    Slide 28: Affordable Tariff Policy

    Affordable Tariff Policy Annual Water Charge for Average Consumption 200m3 (2004)/Affordability* 1.000 € 3,5 • EYDAP’s tariff 3 policy reflects its 800 € social and 2,5 environmental policy. The 600 € 2 financial capability of the 1,5 consumers 400 € exceeds the 1 Company charges while water 200 € 0

  29. Slide 29: Financial Data

    Slide 29: Financial Data

    Financial Data

  30. Slide 30: Financial Highlights

    Slide 30: Financial Highlights

    Financial Highlights y-o-y 9m 9m ∆% mil. € 2004 2005 04-05 2005 2006 05-06 Turnover 327,1 348,7 6,6% 265,9 273,2 2,8% Other Operating Expenses 1,7 3,3 94,2% 1,5 2,1 39,2% Gross Profits 136,1 142,9 5,0% 123,2 124,1 0,7% % of turnover 41,6% 41,0% 46,3% 45,4% EBITDA 61,9 66,7 7,8% 67,4 61,9 -8,1% % of

  31. Slide 31: Turnover

    Slide 31: Turnover

    Turnover (amounts in thousands of Euro) •Revenues from 355.000 water supply services 14.721 (2.667) increased by 4% as 350.000 247 348.741 the result of 345.000 increases in water tariffs in December 340.000 9.394 2004 335.000 330.000 327.046 • Revenue from sewerage services 325.000 increased by 18%

  32. Slide 32: Water Consumption Invoiced

    Slide 32: Water Consumption Invoiced

    Water Consumption Invoiced in millions cubic meters in millions € •Water Consumption 228 invoiced increased by 320 230 219 6% in the period 2000-2005 212 318 315 210 • Revenues from water consumption 194 invoiced increased by 185 312 27% in the same 310 190 180 period 311 305 307 170 306 301 300 150

  33. Slide 33: Operating Revenues

    Slide 33: Operating Revenues

    Operating Revenues (amounts in thousands of Euro) • Operating expenses increased by €18,6m 300.000 (+7%) reaching €285m from €267m +9.155 in 2004. This -2.532 290.000 increase is mainly 285.401 due to: a. the increase by 280.000 +9.198 €9,3m in expenditures for the transportation and 270.000 +2.782

  34. Slide 34: Allocation of Expenses

    Slide 34: Allocation of Expenses

    Allocation of Expenses Other Expenses Third Parties Expenses 4,2% Cost of disposals of dehydrated sludge 2004 0,9% 17,8% Provisions 1,7% Depreciation and amortization Wages & Salaries 7,9% 67,5% 2005 Other Expenses Cost of disposal of 4,2% dehydrated sludge 3,8% Third Parties Expenses 15,5% Provisio

  35. Slide 35: EBITDA

    Slide 35: EBITDA

    EBITDA (amounts in thousands of Euro) 100.000 • EBITDA increased by 7,6% or 90.000 -13.599 €4,7m, +21.695 +1.619 reaching €66,6m, 80.000 -1.234 -3.679 70.000 • EBITDA margin 66.646 61.934 was 19,1% from 60.000 18,9% in 2004. 50.000 40.000 30.000 20.000 10.000 0 EBITDA 2004 Turnover Other Cost of Sel

  36. Slide 36: Pre-tax profit

    Slide 36: Pre-tax profit

    Pre-tax profit (Amounts in thousands of Euro ) • Pre-tax profit increased by 50.000 9,8% or €3,3m, 45.000 +4.712 -882 reaching €36,9m, 40.000 -2.146 1.608 36.979 35.000 33.687 • Pre-tax profit margin 30.000 was 19,1% from 25.000 18,9% in 2004. 20.000 15.000 10.000 5.000 0 Pre-tax Ebitda Change in Ch

  37. Slide 37: Balance Sheet items

    Slide 37: Balance Sheet items

    Balance Sheet items (Amounts in thousands of Euro ) ASSETS 2005 2004 ∆% 04-05 Non current assets 1.072.390 1.056.431 1,5% Inventories 17.676 18.564 -4,8% Trade receivables 187.895 165.998 13,2% Other assets 93.553 88.868 5,3% TOTAL ASSETS 1.371.514 1.329.860 3,1% EQUITY AND LIABILITIES Non current l

  38. Slide 38: Cash Flows

    Slide 38: Cash Flows

    Cash Flows (Amounts in thousands of Euro ) 2005 2004 Cash Flows from operating activities Impressive growth of Profit before tax 36.979 33.687 447% in operating Adjustments for non-cash items 39.847 23.118 Cash flow. Changes in operating assets and liabilities -25.121 -26.089 Interest and related ex

  39. Slide 39: Receivables from the Greek State and Municipalities

    Slide 39: Receivables from the Greek State and Municipalities

    Receivables from the Greek State and Municipalities Contingent Assets: Investment grants €186,87m Trade Receivables: Municipalities and Greek State € 115,5m Long Term Receivables: Construction Contracts: Ministry of Public Works and Public Entity ‘‘EYDAP Fixed Assets’’ € 89,7m TOTAL OF RECEIVABLES:

  40. Slide 40: Net Financial Debt

    Slide 40: Net Financial Debt

    Net Financial Debt (Amounts in thousands of Euro ) 100.000 2.261 88.855 90.000 43.385 78.750 -27.411 80.000 70.000 60.000 -6.190 50.000 -1.940 40.000 30.000 20.000 10.000 0 Net Debt Cash Flow Proceeds Interest and Invest ments Dividends Net Debt 2004 f rom f rom other paid 2005 Operating customers’

  41. Slide 41: Financial Ratios

    Slide 41: Financial Ratios

    FINANCIAL RATIOS ROC ROE 6,0% 3,2% 3,5% 4,0% 2,7% 4,0% 2,0% 2,0% 0,7% 0,0% 0,0% 2004 2005 2004 2005 ROC: (Profit after tax)/ (Equity+Net Debt ) ROE: (Profit after tax)/(Equity)

  42. Slide 42: Financial Ratios

    Slide 42: Financial Ratios

    FINANCIAL RATIOS Enterprise Value – EV (Mil. €) Net Debt/EV 1.000,0 20% 800,0 16% 600,0 12% 854,9 400,0 606,3 8% 13,0% 10,4% 200,0 4% 0,0 0% 2004 2005 2004 2005 • The low level of financial leverage enables the formation of an ambitious investment program without EU investments grants as far as leve

  43. Slide 43: Stock Data

    Slide 43: Stock Data

    Stock Data tock D 7 a ™ ( y

  44. Slide 44: Shareholder Composition

    Slide 44: Shareholder Composition

    Shareholder Composition Other Legal Entities (Domestic & Foreign) 12,11% General Public 16,86% Greek State Agricultural 61,03% Bank of Greece 10,00%

  45. Slide 45: Share Trend

    Slide 45: Share Trend

    Share Trend In Relation to General Index and Mid/40 Index since 02.01.2004 5.000 12 4.000 10 3.000 8 6 2.000 4 1.000 MID 40 GEN INDEX EYDAP 2 0 0 1 /0 5 2 /0 5 3 /0 5 4 /0 5 5 /0 5 6 /0 5 7 /0 5 8 /0 5 9 /0 5 1 0 /0 5 1 1 /0 5 1 2 /0 5 1 /0 6 2 /0 6 3 /0 6 4 /0 6 5 /0 6 From 02.01.2005 to 05.05.2006

  46. Slide 46: Investor Relations

    Slide 46: Investor Relations

    Investor Relations Visit EYDAP’S Web Site www.eydap.gr • Internet Infrastructure Upgrade • Analytical tables of stock indicators, historical stock- trends, application of funds, shareholder composition, dividends. • Real time stock display (10’) • Analytical tables of financial statements • Annual r

  47. Slide 47: Investment – Company Prospects

    Slide 47: Investment – Company Prospects

    INVESTMENT – COMPANY PROSPECTS

  48. Slide 48: Investments

    Slide 48: Investments

    Investments INVESTMENT PROGRAM 2000 – 2005 (million €) 80 70 60 (1) 50 40 70 73 30 57 56 44 20 10 0 2001 2002 2003 2004 2005

  49. Slide 49: Company Prospects

    Slide 49: Company Prospects

    COMPANY PROSPECTS EYDAP ‘s investment program is designed to support the implementation of company goals and focuses on four basic axes. 1. Protection of the Environment- Improvement of water supply and sewerage infrastructure 2. Increased Company Profitability 3. Improved Company effectiveness and

  50. Slide 50: Protection of the Environment

    Slide 50: Protection of the Environment

    COMPANY PROSPECTS 1. Protection of the Environment - Improvement of water supply & sewerage infrastructure 1.1 Upgrade of existing water supply infrastructure • Construction of new potable water reservoirs • Network replacement and upgrade • Implementation of a pressure management system 1.2 Complet

  51. Slide 51: Increased Company Profitability

    Slide 51: Increased Company Profitability

    COMPANY PROSPECTS 2. Increased Company Profitability 2.1 Geographic Expansion • Municipal network acquisition • Construction of new facilities and networks - New Thriasio WWTP and sewerage network of Western Attica - Sewerage Network Expansion in the Northern Suburbs of Attica after the construction

  52. Slide 52: Increased Company Profitability (continued)

    Slide 52: Increased Company Profitability (continued)

    COMPANY PROSPECTS 2. Increased Company Profitability (continued) 2.3 Reduction of Operational Expenses ¾ Works for the Co-production of Electric and Thermal Energy With the production of electric energy using biogas and natural gas we will achieve the parallel production of thermal energy for the de

  53. Slide 53: Improved Company Effectiveness and Overall Performance

    Slide 53: Improved Company Effectiveness and Overall Performance

    COMPANY PROSPECTS 3. Improved Company effectiveness and overall performance 3.1 Administrative Restructuring and Modernization of Internal Procedures • New “Billing & Customer Care” (BCC) system for the restructuring of the regional office into “one-stop shops” in conjunction with the redesign of re

  54. Slide 54: Increased Levels of Customer Service

    Slide 54: Increased Levels of Customer Service

    COMPANY PROSPECTS 4. Increased Levels of Customer Service 4.1 Customer Service Modernization • Upgrade and restructuring of regional commercial offices • New channels of company - client communication and customer service (i.e. via the internet) 4.2 Improved internal procedures & modernization of cu

  55. Slide 55: Organizational Chart

    Slide 55: Organizational Chart

    Organizational Chart PUBLIC BOARD OF DIRECTORS RELATIONS INTERNAL LEGAL AUDIT AFFAIRS CHAIRMAN CORPORATE MANAGING DIRECTOR PLANNING GENERAL MANAGER GENERAL MANAGER ADMINISTRATIVE GENERAL MANAGER GENERAL MANAGER GENERAL MANAGER HUMAN RESOURCES FINANCIAL LARGE PROJECTS FACILITIES NETWORKS & DEVELOPMEN

  56. Slide 56: Personnel levels

    Slide 56: Personnel levels

    Personnel levels PERSONNEL LEVELS 5000 4.745 4.617 4.493 4.411 4.262 4.189 4.390 4500 4.245 4.043 4000 3500 3000 1997 1998 1999 2000 2001 2002 2003 2004 2005

  57. Slide 57: EYDAP S.A.

    Slide 57: EYDAP S.A.

    EYDAP S.A. COMPANY PRESENTATION

Source: Internet Archive copy of eydap.gr

More decks from Athens Water Supply and Sewerage Company S.A.

All 32 Athens Water Supply and Sewerage decks