  1. Slide 1: Investor Presentation October 2022

    Investor Presentation October 2022 India’s First Multi-National Infrastructure Company in the Highways Sector Press Release – Preferential Allotment October 2021

  2. Slide 2: Table of Contents

    Table of Contents Financial Highlights Page 2 Result Highlights Page 4 Business Overview IRB Parent Overview Page 26 Private InvIT Overview Page 33 Public InvIT Overview Page 39 Appendix – Additional Financial Info Page 46 Appendix II – Overview of InvIT Page 50

  3. Slide 3: Financial Highlights for H1FY23

    Financial Highlights for H1FY23 • In general, WPI linked toll roads • Interim dividend of Rs 750 Mn (1.25 • IRB member of India Global provides a natural hedge against per share) in line dividend policy Compact UN Since August 2022 interest rate hikes (e.g., Ahmedabad Vadodara tariff and 9 assets of

  4. Slide 4: Result Highlights

    Result Highlights Private & Confidential

  5. Slide 5: Financial Summary (Half Yearly)

    Financial Summary (Half Yearly) INR in Million Total all segments Construction Segment BOT Segment Particulars H1FY23 H1FY22 H1FY23 H1FY22 H1FY23 H1FY22 Revenue 34,342 31,749 24,125 23,152 10,218 8,597 EBITDA 18,924 15,015 9,583 7,234 9,342 7,781 EBITDA margin 55% 47% 40% 31% 91% 91% Financial expen

  6. Slide 6: Financial Summary (Quarterly YoY)

    Financial Summary (Quarterly YoY) INR in Million Total all segments Construction Segment BOT Segment Particulars Q2FY23 Q2FY22 Q2FY23 Q2FY22 Q2FY23 Q2FY22 Revenue 14,388 15,044 9,444 10,474 4,944 4,570 EBITDA 7,610 7,569 3,113 3,413 4,497 4,156 EBITDA margin 53% 50% 33% 33% 91% 91% Financial expense

  7. Slide 7: Financial Summary – Net cash for H1FY23

    Financial Summary – Net cash for H1FY23 6

  8. Slide 8: Consolidated Financials: Strong Track Record

    Consolidated Financials: Strong Track Record REVENUE (INR MN) EBITDA & MARGIN (INR MN) 53% 45% 45% 49% 69,026 70,472 31,329 31,664 33,492 54,875 63,554 27,016 50% 53% 15,044 14,388 7,569 7,610 FY 2019 FY 2020* FY 2021* FY 2022 Q2FY22 Q2FY23 FY 2019 FY 2020* FY 2021* FY 2022 Q2FY22 Q2FY23 NET DEBT &

  9. Slide 9: Business Overview

    Business Overview Private & Confidential

  10. Slide 10: Integrated Highway Developer Connecting India by Developing World Class Highway Infrastructure

    Integrated Highway Developer Connecting India by Developing World Class Highway Infrastructure Pan India presence c. 18 years c. 20% INR 600 bn+ Weighted Of Golden 10 Highway asset 11,930 lane average Quadrilateral States in India base, one of the KM residual owned and where assets largest in India

  11. Slide 11: Owns and Manages c. 12,000 Lane KM of Roads across 10 States

    Owns and Manages c. 12,000 Lane KM of Roads across 10 States in India India’s leading portfolio of road assets (lane KMs)1 11,930 1,806 8,400 6,890 5,379 4,919 4,400 3,755 2,596 10,124 2,072 3,400 1,852 8,400 4,031 226 604 4,642 851 668 4,818 4,174 3,152 3,400 1,493 737 888 1,744 1,184 283 Operation

  12. Slide 12: Fully Integrated Player with In-House Design, Construction, O&M

    Fully Integrated Player with In-House Design, Construction, Operations and Maintenance Capabilities  Highly evolved design capabilities  In-house capabilities, with a pool of through 40+ years of experience expert workforce, to carry out EPC  Use of high-grade polymer modified (Construction) and

  13. Slide 13: Efficient O&M Practices, Employing Latest Technology, With a Strong Focus on ESG

    Efficient O&M Practices, Employing Latest Technology, With a Strong Focus on ESG Technology driven maintenance regime  Site level data capture  Predictive analytics  Timely preventive & corrective maintenance  Benchmarking with global standards Real time operations, monitoring & control ESG comp

  14. Slide 14: Supported by Marquee Financial and Strategic Investors

    Supported by Marquee Financial and Strategic Investors IRB recently concluded the largest equity fund raise by a listed Indian infrastructure developer in the roads and highways sector Ownership structure post transaction Access to technical expertise, global experience and long term capital 1 ‒ Cin

  15. Slide 15: Only Integrated Development Platform in India

    Only Integrated Development Platform in India Catering to Shareholders with Diverse Risk Appetite Distribution1 Strategy: To Offer HAM Distribution1 assets to Public InvIT after Construction completion Holdco 16% Margin + / - WC 100% 100% BOT / TOT / HAM CONSTRUCTION Private InvIT (IRB 51%, 7 Assets

  16. Slide 16: Approach Adopted by Analysts for Valuation of Integrated Developer Model

    Approach adopted by analysts for valuation of Integrated Developer Model Particulars Methodology Value of concession Business DCF of FCFE over concession life Value of Construction Business PE Multiple or EV/EBIDTA Value of Non core assets (Land bank and airport) Multiple on Investment Total Value o

  17. Slide 17: Value evolution for a typical BOT Concession over its life cycle

    Value evolution for a typical BOT Concession over its life cycle 16

  18. Slide 18: Significant Improvement in Leverage Position Post Equity Infusion by GIC and Cintra

    Significant Improvement in Leverage Position Post Equity Infusion by GIC and Cintra Net Debt position before and after the deal Pre deal net debt Post deal net debt Out of INR 53,470 mn equity infused as a part of the deal, INR 32,500 mn was used for deleveraging, resulting in significant improvemen

  19. Slide 19: Current Ratings for Long Term Credit Facilities

    Current Ratings for Long Term Credit Facilities IRB Infrastructure Developers 2 Modern Road Makers Private Limited 1 Limited Ind AA- / Stable CARE A+ / Stable IRB MP Expressway Private 3 Limited Ind AA / Stable IRB Ahmedabad Vadodara Super 4 VK1 Expressway Private Limited 5 Express Tollway Private L

  20. Slide 20: Share Price Performance

    Share Price Performance DEC 2021: Cintra & GIC close IRB transaction. IRB share price (rebased to 100) 500.0 DEC 2021: IRB is awarded Ganga Expressway FEB 2021: Raised INR APR 2021: Awarded 1 21.9 bn through NCD new HAM project and issuance to FPIs backed 1 new BOT project AUG 2020: Awarded a by a U

  21. Slide 21: Projects, Spread Across India, for Optimal Risk – Return Mix

    Strategic Focus: Bid for a Diversified Portfolio of BOT, TOT and HAM Projects, Spread Across India, for Optimal Risk – Return Mix 1 Bid for new assets 2 Diversify presence  NHAI expected to award HAM projects to the tune of INR 4,000 bn, BOT projects worth INR  Strategically expand its presence ou

  22. Slide 22: Constantly Evolving EPC Capabilities: Moving Up the Project Complexity Value Chain

    Constantly Evolving EPC Capabilities: Moving Up the Project Complexity Value Chain, Successfully Raising Funds at Crucial Junctures 1977 1995 2004 2008 2016 2017 2018 2020 2021 Length: Length: 1,168 1,234 LKM LKM Cost: INR Cost: INR 11 bn 90 bn Raised Raised INR INR 50 bn Length: Length: 9.45 bn 1,9

  23. Slide 23: Strong Focus on Protecting the Environment and Giving Back to the Community

    Strong Focus on Protecting the Environment and Giving Back to the Community Ferrovial is a sustainability champion, ranking highly in various indices… IRB has a strong focus on environment, sustainability and community, which is expected to be further strengthened through Ferrovial’s expertise  Fer

  24. Slide 24: Board Driven Robust Governance Policies

    Board Driven Robust Governance Policies Policies Committees  Environment policy  Corporate Social Responsibility Committee  Code of Conduct  Risk Management Committee  ESG Committee of Management Assurance  ESG Commitments  Human rights Policy  Corporate Social Responsibility Policy  Health

  25. Slide 25: Business Responsibility and Sustainability Reporting

    Business Responsibility and Sustainability Reporting, Mandatory for Listed Companies FY23 Onward1, to Bring About Reporting Transparency Business responsibility and sustainability reporting (BRSR) is intended towards having quantitative and standardized disclosures on ESG parameters, to enable compa

  26. Slide 26: IRB Parent Overview

    Overview IRB Parent Private & Confidential

  27. Slide 27: Strong In-house Project Design, Execution and Maintenance Capabilities

    Strong In-house Project Design, Execution and Maintenance Capabilities Strong construction track Efficient project execution Ability to independently record capabilities Large equipment bank bid for large contracts In-house O&M capabilities  Access to best global  One of the largest fleet of  Exp

  28. Slide 28: IRB is Well Poised to Maintain Margins with Adequate Escalation Provisions

    IRB is Well Poised to Maintain Margins with Adequate Escalation Provisions for Raw Material Prices Cement price (INR per bag) 273 293 266 250 266 258 246 246 227 234 234 238 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22  The Major material prices are in Reinfor

  29. Slide 29: WPI Linked Toll Rates Provide Protection to Toll Cash Flows

    WPI1 Linked Toll Rates Provide Protection to Toll Cash Flows in an Inflationary Environment with Increasing Interest Rates  Toll rates are linked to inflation  For NHAI projects that were bid for after 2008, toll rate is revised annually in April at 3% fixed rate, plus 40% of change in WPI for Dec

  30. Slide 30: Healthy Mix of BOT, TOT and HAM Projects

    Healthy Mix of BOT, TOT and HAM Projects Original S. Project cost Lane # of Project Counterparty State Concession Status No. (INR mn) KMs Lanes ( in Years) 2 BOT 1 Ahmedabad Vadodara NHAI Gujarat 48,800 987 6 25 Tolling start: January 1, 2013 projects Received Appointed Date as 2 Ganga Expressway –

  31. Slide 31: Mumbai Pune TOT – A Crown Jewel in IRB’s Portfolio

    Mumbai Pune TOT – A Crown Jewel in IRB’s Portfolio One of the busiest highway corridors in India which is a part of the Golden Quadrilateral on the Mumbai-Chennai arm Project highlights Project snapshot Project snapshot  Tolling operations, maintenance and transfer of Road  YCEW - 94 Km , NH-48 –

  32. Slide 32: BOT Toll Revenue Comparative – IRB Projects

    BOT Toll Revenue Comparative – IRB Projects Amount in INR mn MUMBAI - PUNE ** Quarter 2018-19 2019-20 2020-21* 2021-22* 2022-23 % Variance Jun 2,309 2,470 1,167 2,373 3,606 52.0% Sept 2,148 939 2,191 3,055 3,347 9.6% Dec 2,372 - 3,106 3,462 Mar 2,354 621 3,221 3,342 Total 9,182 4,031 9,685 12,232 6,

  33. Slide 33: IRB Private InvIT Overview

    InvIT IRB Private Private & Confidential 32

  34. Slide 34: Private InvIT: IRB Infrastructure Trust (Portfolio of 10 Assets)

    Private InvIT: IRB Infrastructure Trust (Portfolio of 10 Assets) Asset location Asset overview Sr. Project cost Project Lane KM Status No. (INR mn) Karnataka 758 1 Goa Kundapur 34,770 758 PCOD achieved Maharashtra 1,151 Haryana 2 Solapur Yedeshi 15,900 395 COD achieved Rajasthan Uttar Pradesh 3 Yede

  35. Slide 35: Strong Recovery in Toll Collection Across Projects

    Strong Recovery in Toll Collection Across Projects Daily toll collection (INR mn) 55.1 57.2 53.6 52.5 53.0 51.9 44.0 44.5 40.0 39.5 32.3 32.3 35.3 34.6 27.3 27.7 30.0 20.0 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar FY22 FY2023 Total toll collection (INR mn) 1716 5,032 1591 1709 1601 1626 1608 1

  36. Slide 36: BOT Toll Revenue Comparative – Private InvIT Projects

    BOT Toll Revenue Comparative –Private InvIT Projects Amount in INR mn Gulabpura Chittorgarh ** Yedeshi Aurangabad Quarter 2018-19 2019-20 2020-21* 2021-22* 2022-23 % Variance Quarter 2018-19 2019-20 2020-21* 2021-22* 2022-23 % Variance Jun 533 419 217 329 822 149.6% Jun - 288 153 346 574 65.8% Sept

  37. Slide 37: BOT Toll Revenue Comparative – Private InvIT Projects

    BOT Toll Revenue Comparative – Private InvIT Projects Amount in INR mn Kishangarh Gulabpura * Agra Etawah Quarter 2018-19 2019-20 2020-21* 2021-22* 2022-23 % Variance Quarter 2018-19 2019-20 2020-21* 2021-22* 2022-23 % Variance Jun 344 294 146 209 303 44.9% Jun 231 206 150 419 550 31.3% Sept 342 279

  38. Slide 38: BOT Toll Revenue Comparative – Private InvIT Projects

    BOT Toll Revenue Comparative – Private InvIT Projects Amount in INR mn Karwar Kundapura Palsit Dankuni Quarter 2018-19 2019-20 2020-21* 2021-22* 2022-23 % Variance Quarter 2021-22* 2022-23 % Variance Jun - - 93 156 298 91.7% Jun - 545 - Sept - - 156 197 262 32.8% Sept - 498 - Dec - - 218 250 Dec - M

  39. Slide 39: IRB Public InvIT Overview

    InvIT IRB Public Private & Confidential 38

  40. Slide 40: Structure of Public InvIT

    Structure of Public InvIT Fund structure Unit holders holding more than 1% % Investor in units of trust S. No. Unit holder holding IRB INFRASTRUCTURE DEVELOPERS 1 15.97 Quarterly LIMITED distribution 2 GOVERNMENT OF SINGAPORE 7.61 ADITYA BIRLA SUN LIFE TRUSTEE Invests in Distributes 3 PRIVATE LIMITE

  41. Slide 41: Public InvIT (Portfolio of 5 Assets)

    Public InvIT (Portfolio of 5 Assets)  Listed in My-2017 with initial portfolio of six operational assets; seventh asset was transferred in Sep-2017  BOT-Toll assets with proven traffic history and spread across different states incl. Maharashtra, Gujarat, Rajasthan, Karnataka, Punjab & Tamil Nadu

  42. Slide 42: Strong Recovery in Toll Collection Across Projects

    Strong Recovery in Toll Collection Across Projects Daily toll collection (INR mn) * 40.0 25.8 25.6 25.7 24.2 24.2 23.5 20.0 22.8 23.9 24.1 21.1 16.8 17.0 17.4 17.9 17.1 15.8 13.7 10.3 - Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar FY22 FY2023 Total toll collection (INR mn) * 775 794 771 726 2,203

  43. Slide 43: Financial Highlights

    Financial Highlights Gross income1 (INR mn) EBITDA (INR mn) CAGR: 9% 81% 81% 80% 80% 83% 12,701 14,003 12,334 11,609 11,584 10,052 9,989 10,218 9,343 8,191 FY18 FY19 FY20 FY21 FY22 FY18 FY19 FY20 FY21 FY22 EBITDA margin Net distributable cash flow (INR mn) Net debt (INR mn) 0.2x 0.2x 0.3x 0.3x 0.3x

  44. Slide 44: Unit Price Performance Since Inception

    Unit Price Performance Since Inception Price (rebased to 100) Distribution per unit (DPU) 300.0 INR FY18 FY19 FY20 FY21 FY22 DPU 10.6 12.3 10.0 8.5 9.0 Yield1 11.5% 16.4% 17.6% 20.8% 16.1% 200.0 74% 22% 100.0 - May-20 Aug-20 Nov-20 Feb-21 May-21 Aug-21 Nov-21 Feb-22 May-22 Aug-22 IRB InvIT 10 Y G-se

  45. Slide 45: Key Takeaways

    Key Takeaways 1 Large pipeline of future growth with upcoming national & state highway bids 2 Proven credentials in the highways space Significant improvement in financial metrics post GIC and Cintra –transaction ; further supported by 3 monetization of VK1 Ham Asset 4 Access to complementary capabi

  46. Slide 46: Appendix I Additional Financial Information

    Appendix I Additional Financial Information Private & Confidential

  47. Slide 47: Financial Summary (Quarterly - QoQ)

    Financial Summary (Quarterly - QoQ) INR in Million Total all segments Construction Segment BOT Segment Particulars Q2FY23 Q1FY23 Q2FY23 Q1FY23 Q2FY23 Q1FY23 Revenue 14,388 19,954 9,444 14,680 4,944 5,274 EBITDA 7,610 11,315 3,113 6,470 4,497 4,845 EBITDA margin 53% 57% 33% 44% 91% 92% Financial expe

  48. Slide 48: Offshore Bond Issue – Covenant Structure

    Offshore Bond Issue – Covenant Structure Surplus IRB 100% Investments Business segment I 100% 51% 49% GIC Toll & HAM Private InvIT affiliates Business segment II 16% Vadodara Kim Construction Public InvIT Mumbai Pune TOT HAM Engineering, construction, Ahd Vadodara operation and maintenance of BOT Ga

  49. Slide 49: Leverage Summary – Bond Covenant

    Leverage Summary – Bond Covenant INR in Mn TTM ending TTM ending TTM ending Particulars Sept 30, 2022 March 31, 2022 March 31, 2021 Business Segment I: Toll & HAM Revenues 19,944 18,277 16,112 EBITDA 17,690 16,083 14,532 Gross Debt 92,044 102,541 97,711 Business Segment II : Construction + Surplus f

  50. Slide 50: Appendix II Overview of InvITs

    Appendix II Overview of InvITs Private & Confidential

  51. Slide 51: Indian Road Sector Outlook

    Indian Road Sector Outlook Healthy awarding activity seen during last 2-3 years While pace of construction reduced in FY22, improvement Consistent increase in Budgetary estimated to be maintained going forward.. is expected going forward allocation 00’ KM KM Capital Outlay for MoRTH (INR bn) 14,235

  52. Slide 52: Attractive Sector with Strong Underlying Fundamentals

    Attractive Sector with Strong Underlying Fundamentals Indian highways exhibit strong fundamentals, secular growth trends and stable regulations  Growing urbanization and rising personal disposable income Bharatmala Pariyojana Phase 1 Secular growth  Amongst the fastest growing vehicle markets  In

  53. Slide 53: Roads Sector has a Significant Share in Government’s Infrastructure Development Pipeline

    Roads Sector has a Significant Share in Government’s Infrastructure Development Pipeline National Monetization Pipeline PM Gati Shakti Master Plan  Monetization of INR 6 tn of brownfield assets, with stable revenue streams,  Construction of INR 111 tn of greenfield assets in the core infrastructur

  54. Slide 54: Regulatory Overview

    Regulatory Overview Variety of PPP Models with a highly evolved & stable regulatory regime backed by well established contract structure through NHAI Model Concession Agreement NHAI has successfully attracted investments in the roads sector through and array of PPP models Build Operate Transfer (BOT

  55. Slide 55: Bankable Concession Terms

    Bankable Concession Terms Key positive of Indian Roads & Highways sector Typical terms Details  NHAI is an agency appointed by the federal government for development of roads and highways in India NHAI as counterparty  NHAI is a quasi-sovereign entity with a ‘AAA’ rating  Well-funded by federal g

  56. Slide 56: While the Sector has Witnessed Subdued Bid Activity Recently, Outlook Remains Positive

    While the Sector has Witnessed Subdued Bid Activity Recently, Outlook Remains Positive Key sector trends 1 Weak bidding activity in FY22 2 Increased competition intensity 3 Monetization through TOT: A mixed bag Bids tendered for road projects (INR bn)  MoRTH has provided relaxations  NHAI had bid

  57. Slide 57: Disclaimer

    Disclaimer Except for the historical information contained herein, statements in this presentation and any subsequent discussions, which include words or phrases such as ‘will’, ‘aim’, ‘will likely result’, ‘would’, ‘believe’, ‘may’, ‘expect’, ‘will continue’, ‘anticipate’, estimate’, ‘intend’, ‘pla