Voltaic Strategic Resources Limited · ASX:VSR

Voltaic Strategic Resources — Incremental Oil and Gas — GoodOil Conference 2012

23 slides from Voltaic Strategic Resources's conference presentation, Sep 4, 2012

  1. Slide 1: GoodOil Conference September 4th 2012

    Slide 1: GoodOil Conference September 4th 2012

    INCREMENTAL OIL and GAS (asx: IOG) GOODOIL CONFERENCE SEPTEMBER 4th 2012 www.incrementaloilandgas.com 1

  2. Slide 2: Disclaimer and Important Notice

    Slide 2: Disclaimer and Important Notice

    DISCLAIMER AND IMPORTANT NOTICE This presentation contains forward looking statements that are subject to risk factors associated with oil and gas businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and chan

  3. Slide 3: Incremental Business model

    Slide 3: Incremental Business model

    Incremental Business model – A producing oil company with a cash flow focus – We acquire underperforming oilfields and increase production – Focus is Onshore USA – Florence producing oilfield, Colorado (100% WI) – Round Mountain producing oilfield (100% WI) – Sheep Springs producing oilfield (100% W

  4. Slide 4: California Assets

    Slide 4: California Assets

    Incremental Oil and Gas, California & Colorado, USA Project Location Man. Florence Field Fresno 0 C LIFORNIA A 7l a N California Assets EW MEXICO --11r,-ILos Angeles Long Beach 0 0San Diego El Paso Legend Project Location - California • Project Location - Colorado 50 100 150 200 250 120°w 115"W 110"

  5. Slide 5: Florence Oilfield - New Acquisition

    Slide 5: Florence Oilfield - New Acquisition

    NEW ACQUISITION FLORENCE OILFIELD DENVER 5

  6. Slide 6: Florence field history: drilled first in 1862

    Slide 6: Florence field history: drilled first in 1862

    Drilled first in 1862 1000 Shallow wells drilled 15m barrels produced Produces from fractured shale 1800- 3600’ deep Revitalised by seller in last 4 years Av 700 bopd over last 2 years 6

  7. Slide 7: Florence has been producing for over 125 years

    Slide 7: Florence has been producing for over 125 years

    Florence has been producing for over 125 years BOPD 2,500 2,000 1,500 BOPD 1,000 500 0 1887 1894 1901 1908 1915 1922 1929 1936 1943 1950 1957 1964 1971 1978 1985 1992 1999 2006

  8. Slide 8: Early wells rated at >200 BOPD

    Slide 8: Early wells rated at >200 BOPD

    Early wells rated At >200 BOPD Rep 1-29-02 “Will easily produce 200 barrels per day” “Will produce easily 200 barrels per day”

  9. Slide 9: Florence Field

    Slide 9: Florence Field

    FLORENCE FIELD • 21 Producing wells • High initial rates and quick payout • Light, sweet crude (WTI pricing) • Wells inexpensive, simple • Wells located from 3D seismic • Wells can decline quickly • No water production, low opex • IOG has over 20,000 acres leased • 100% WI, av 80% NRI 9

  10. Slide 10: Pierre FM Potential

    Slide 10: Pierre FM Potential

    PIERRE FM POTENTIAL • Excellent quality 3D seismic over nearly all the lease • Fracture zones clearly visible and mappable on seismic • At least 30 anomalies remain undrilled • Will need to drill to maintain production • First two wells planned for Q3 2012 • We have a world class team in developing

  11. Slide 11: Florence Production

    Slide 11: Florence Production

    FLORENCE PRODUCTION Florence Quarterly Production 1000 20 900 18 800 16 700 14 Average BOPD 600 12 # of Wells 500 10 400 8 300 6 200 4 100 2 0 0 2011 Q1 2011 Q2 2011 Q3 2011 Q4 2012 Q1 11 Average Daily Production (BOPD) # of Wells Drilled

  12. Slide 12: Well costs have come down substantially

    Slide 12: Well costs have come down substantially

    Well costs have come down substantially 12

  13. Slide 13: Niobrara: Florence same depth and maturity as drilled areas

    Slide 13: Niobrara: Florence same depth and maturity as drilled areas

    Cross Creek (Niobrara): Drilling Niobrara: IP 75 BOEPD Bear Project 17 wells permitted, held confidential Silo Field 68 horizontals IP 500-2000 BOPD H&T Ranch (Niobrara) IP 75 BOEPD West Grover / Fury Field Recent wells at 600 BOPD managed rate Wattenberg Field PDC buys Niobrara at $10k/acre ($330m)

  14. Slide 14: New Niobrara well on our doorstep

    Slide 14: New Niobrara well on our doorstep

    NEW NIOBRARA WELL ON OUR DOORSTEP AUSTIN (AKK) drilled 400m from our western boundary Had no 3D seismic Reported 200’ ‘potential pay’ in Niobrara Now planning to drill and frac two horizontal wells Report 23m barrels of resources from 9700 acres.

  15. Slide 15: IOG Capital Structure

    Slide 15: IOG Capital Structure

    IOG Capital Structure • Formed 2009 as Private Company • Listed January 2011 after raising $5.3m at 30 cents. • 486 shareholders • 155.6m shares (Directors and management 37.3%) 92.8m unlisted options1 • Market cap about $40 million • US$6m Debt 2010 2011 REVENUE $6.06m $7.72m EBITDA $2.40m $3.04m 1

  16. Slide 16: IOG Team

    Slide 16: IOG Team

    From left: IOG TEAM Adams: 20 years Accountant. MacDonald: 13 years in Senate, LLB USA Cronin: No 2 in Woodside (23 years) M Pet Eng, Stowell: Founder of Anvil and Mawson West, CA Over 30 years McGann: 40 years geologist worldwide, CPG experience CFO DIRECTORS

  17. Slide 17: Incremental Projects, California

    Slide 17: Incremental Projects, California

    Incremental Projects, California • Producing ROUND MOUNTAIN • Producing SHEEP SPRINGS • VENTURA Development • McDONALD A/C Development • RAVEN PASS Exploration 17

  18. Slide 18: Round Mountain

    Slide 18: Round Mountain

    Round Mountain Smoot 7 Drilled 7 wells so far All successful Production about 90 bopd Six additional locations 18

  19. Slide 19: Sheep Springs Oilfield

    Slide 19: Sheep Springs Oilfield

    Sheep Springs Oilfield STILL PRODUCING 120 BOPD. LOW OPEX Remaining 2P Reserves of 1.43 MMB 19

  20. Slide 20: McDonald Anticline

    Slide 20: McDonald Anticline

    McDonald Anticline Produced 22 million barrels Shallow, light oil Multi reservoirs Large land position Drill in 2012 At least 3 well locations 20

  21. Slide 21: Raven Pass

    Slide 21: Raven Pass

    Raven Pass • Flowed light oil in 1942. Not drilled since • Reservoir, seal, trap all demonstrated • 200 m barrel potential • True wildcat 21

  22. Slide 22: Production

    Slide 22: Production

    Production Incremental Oil and Gas - Quarterly Production 200 . 7 0 a om oo oo oo oo or ov v ~v Vv Vv v v v v Vv v eS rot e e rong fot e roa Se roi | @ Avg GAS BOEPD ™@ Avg BOPD

  23. Slide 23: 2012 Projected News Flow

    Slide 23: 2012 Projected News Flow

    2012 Projected News Flow • Drill 1 well, Round Mountain …August • Drill 2-3 wells, Florence Field……..Q4 • Drill 1 well, McDonald Anticline … Q4 • Drill 1 wells, Ventura Project………Q4 • Drill 6-8 wells, Florence Field ……..Q1 2013 • Declare another after tax profit

Source: Internet Archive copy of voltaicresources.com

More decks from Voltaic Strategic Resources Limited

All 28 Voltaic Strategic Resources decks