Kim Heng Ltd · SGX:5G2

Kim Heng — Investor Presentation (March 2026)

32 slides from Kim Heng's investor presentation, March 2026

  1. Slide 1: Corporate Summary Presentation

    CORPORATE SUMMARY PRESENTATION BUILDING A STRONG FUTURE (TOWARDS GREENER WATERS) Part of the PTHAITAN ASA Hemeaume ADIRA S BRIGEWATER 9% vssmee SPRUHMMAZY | s KIM HENG Group

  2. Slide 2: Group at a glance

    Established in 1968 300+ Employees Two established waterfront shipyards in Singapore Offices in Malaysia, Singapore, Korea, Thailand & Taiwan S$100mil+ annual turnover 45+ Marine Vessels 29 Cranes (100t – 1,250t lift capacity) Extensive fabrication, vessel build & maintenance expertise Extensive tra

  3. Slide 3: Services overview

    Shipyard & Fabrication Services Marine Vessel Support Port Agency and Logistics Offshore Salvage and Diving Crane Lifting Solutions Offshore Renewables Support Geotechnical Drilling and Surveys Shallow Water Cable Lay Solutions Horizontal Directional Drilling (HDD) Offshore Construction Support Pipe

  4. Slide 4: Group Location Map

    GROUP LOCATION MAP LEGEND Malaysia & Offices & Agency (Malaysia + Singapore) Singapore Shipyards Local Presence Ongoing establishment

  5. Slide 5: Group Support Services

    GROUP SUPPORT SERVICES Shipyard Services Subsea Construction Module fabrication Renewables services Anchor handling & Repairs Support (incl. DP1 & DP2) Logistics Crane Lifting Horizontal Module Lifting Barge Transport & Agency Services Solutions Directional Drilling & Towing (HDD) Supply/ Geotechnic

  6. Slide 6: Shipyard and Fabrication Services

    SHIPYARD AND FABRICATION SERVICES Two well established waterfront shipyards Combined yard area of more than 53,000m2 More than 200m combined waterfront quayside Advanced welding and material handling facilities Vessel shipyard repairs & barge and vessel slipping facilities New build vessel and barge

  7. Slide 7: Shipyard and Fabrication Services

    SHIPYARD AND FABRICATION SERVICES NEW VESSEL BUILDS MODULES OFFSHORE STRUCTURES BARGE CONTRUCTION

  8. Slide 8: Accommodation Outfitting & Furnishing

    ACCOMMODATION OUTFITTING & FURNISHING HIGH STANDARDS OF ACCOMMODATION OUTFITTING FOR RIGS, VESSELS & BARGES

  9. Slide 9: Offshore Vessel Support

    OFFSHORE VESSEL SUPPORT 45+ OFFSHORE SUPPORT Large Ocean-Going Tow Tugs (156t Bollard Pull) VESSELS AVAILABLE DP2 Anchor Handling Tugs (50–130t bollard (INCLUDING): pull) DP2 120 pax Multipurpose Support Vessel (with moonpool) Shallow water DP2 cable lay barge (under construction) Rock dumping barge

  10. Slide 10: Engineering & Naval Design Services

    ENGINEERING & NAVAL DESIGN SERVICES STRUCTURAL NAVAL ARCHITECT INSTALLATION ENGINEERING DESIGN ENGINEERING  Steel Structure Design  Vessel Intact & Damage Stability  Lifting Analysis  Global Strength Analysis  Vessel inclining Experiment  Rigging Design  Local Strength Analysis  Dead weight

  11. Slide 11: Marine Support Vessel Snapshot

    MARINE SUPPORT VESSEL SNAPSHOT DP2 MULTIPURPOSE TRANSPORTATION HIGH-CAPACITY DP2 / DP1 ANCHOR VESSEL MSV (with BARGES AND TOWING TOWING TUGS HANDLING/TOW TUGS moonpool) TUGS  Fleet of 156t Bollard  Fleet of DP2 & DP1  DP2 Multi Purpose  Fleet of flat top Pull Long Distance Towing and Anchor Supp

  12. Slide 12: Tugs & Towing

    TUGS & TOWING 20t – 156t Bollard Pull Tugs 1,600BHP – 12,000BHP Capacity DP2, DP1 and Non-DP tug options Ocean Towing Solutions Tug and Barge combinations (100ft – 400ft)

  13. Slide 13: Transportation Barge Solutions

    TRANSPORTATION BARGE SOLUTIONS 80ft – 330ft size TRANSPORTATION BARGES Range of transportation barges available 80ft – 330ft size can be made available 5t/m² – 20t/m² deck strength Ballastable and non-ballastable type Can be fitted with spud and/ or mooring systems

  14. Slide 14: Port Agency and Logistics

    PORT AGENCY AND LOGISTICS MARINE & PORT AGENCY SERVICES CREW MANAGEMENT • Port Harbour Towage & Pilotage • Crew changes, visa’s & • Vessel Escort and Safety Tug immigration clearances Services • Travel & Hotel Arrangements • Vessel and Rig Move Planning • Work Permit Applications, and Marine Support

  15. Slide 15: Offshore Salvage & Diving Support

    OFFSHORE SALVAGE & DIVING OFFSHORE SALVAGE, SPILL & DIVING SUPPORT SUPPORT VESSEL SALVAGE SUPPORT SUBSEA CONSTRUCTION OFFSHORE SPILL RECOVERY ONSHORE CLEAN UP SUPPORT • Tug towage services • Vessel oil boom operations • Beach cleanup • Marine vessel support • Subsea visual surveys (divers) • Debris

  16. Slide 16: Crane Lifting Solutions

    CRANE LIFTING SOLUTIONS WIDE SELECTION OF CRANES AVAILABLE 1,250t, 600t, 400t, 280t & 100t capacity Many new or near new units

  17. Slide 17: Crane Lifting Solutions

    CRANE LIFTING SOLUTIONS WIDE SELECTION OF 100T – HIGH CAPACITY 1250T CRAWLER VESSEL AND BARGE CRANE 600T CRAWLER CRANES CRANE (suitable for renewables, onshore LIFTING SOLUTIONS (ideal for onshore, (for onshore & offshore use) and offshore option) shipyard and offshore vessel lifting operations) • H

  18. Slide 18: Offshore Renewables Support

    OFFSHORE RENEWABLES OFFSHORE RENEWABLES SUPPORT SUPPORT WIDE RANGE OF OFFSHORE & ONSHORE RENEWABLES SUPPORT SERVICES including: High-capacity towing tug support (up to 150t bollard pull) Anchor Handling Tug Support (AHTS) 45t to 130t bollard pull incl. DP2 DP2 MSV Geotechnical/Geophysical survey

  19. Slide 19: Shallow Water Cable & Umbilical Installation Support Services

    SHALLOW WATER CABLE & UMBILICAL INSTALLATION SUPPORT SERVICES • Offshore geotechnical drilling and soil sampling/testing services (including drilling, CPT, Vibro coring, drop & gravity test sampling) • Extensive shallow water marine assets support including DP2 MSV, DP2/DP1 and non-DP tugs and trans

  20. Slide 20: Adria300 Cable Lay Barge

    ADRIA300 CABLE LAY BARGE (currently under construction in Singapore) DP2 Cable Lay Barge Specification Summary 300ft cable lay barge with DP2 and 6-point mooring system 91.5m x 27.5 m with high deck strength (15t/m2) Suitable for cable and umbilical lay 3000t turntable for cable or umbilical product

  21. Slide 21: Bridgewater Discovery

    GEOTECHNICAL & SUBSEA CONSTRUCTION SUPPORT BRIDGEWATER DISCOVERY DP2 GEOTECHNICAL DRILLING SURVEY VESSEL (with option to use for subsea construction support & trenching)

  22. Slide 22: DP2 Geotechnical Drilling Survey Vessel

    DP2 GEOTECHNICAL DRILLING SURVEY VESSEL 76m long x wide 20m beam Geotechnical vessel with large moonpool Extensive vessel accommodation facilities with 59 pax capacity, recreation rooms, gym, offices and hospital facilities Equipped with industry leading equipment for Geotechnical soil investigation

  23. Slide 23: Geotechnical Survey Vessel (DP2 + Mooring)

    GEOTECHNICAL SURVEY VESSEL (DP2 + MOORING) Fully equipped geotechnical DP2 vessel (also with 4-point mooring) Advanced twin tower drill rig for soil core sampling down to 300m Vessel equipped with industry leading CPT system High performance Vibro Coring and Grab sampling systems 59 pax capacity and

  24. Slide 24: Advanced Cable and Pipe Shore Crossing Solutions

    ADVANCED CABLE AND PIPE SHORE CROSSING SOLUTIONS Direct Pipe Drilled Installation (DPI) Horizontal Directional Drilling (HDD) HDD for River & Lake crossings HDD from Shore to Offshore

  25. Slide 25: Horizontal Directional Drilling (HDD)

    HORIZONTAL DIRECTIONAL DRILLING (HDD) o Owners of high-capacity HDD drilling equipment with an extensive track-record for successful HDD solutions in rock to soft clay and silt o HDD solutions safeguards against environmentally damaging and higher cost open cut trench alternatives o Minimizes surfac

  26. Slide 26: Horizontal Directional Drilling (HDD)

    HORIZONTAL DIRECTIONAL DRILLING (HDD)

  27. Slide 27: Direct Pipe Drilling Solutions

    DIRECT PIPE DRILLING SOLUTIONS Combines benefits of HDD & Micro tunneling Lower risks, quicker & more cost effective One-pass solution, no back reaming required Suitable for any soil condition No requirement for casing pipe/bore hole liner 26” to 60” dia. pipe size Up to approx. 1700m drilling dista

  28. Slide 28: Direct Pipe Drilling Solutions

    DIRECT PIPE DRILLING SOLUTIONS New state of the art Direct Pipe Drilling equipment for lower risk crossing solutions (combining some of the best qualities of micro tunneling and HDD while avoiding some of their drawbacks)

  29. Slide 29: Offshore HDD & DPI Drilling Marine Support

    OFFSHORE HDD & DPI DRILLING MARINE SUPPORT Full Marine Vessel Support Spread for HDD & DPI Drilling Operations Support Services and Marine Assets including, barges, tugs, crew boats, cranes etc.

  30. Slide 30: Rockdumping & Transportation Solutions

    ROCKDUMPING & TRANSPORTATION SOLUTIONS ROCKDUMPING & TRANSPORTATION SOLUTIONS (barge currently in development) (barge currently under final construction) SHALLOW WATER FALLPIPE ROCK DUMPING BARGE o 100m x 30m rock dumping barge (under development) o 4300m3 rock capacity o Fallpipe system for accurat

  31. Slide 31: Material / Dredging Transportation Solutions

    MATERIAL / DREDGING (barge currently in development) TRANSPORTATION SOLUTIONS SELF PROPELLED SPLIT HOPPER BARGE (build recently completed in Kim Heng Singapore shipyard) Design & build solutions for innovative split hopper barge vessels Fast, reliable and maneuverable split hopper barges Suitable fo

  32. Slide 32: THAITAN

    @ THAITAN INTERNATIONAL ADIRA 5 BRIDG RENEWABLES OFFS WORE WATER Bo wavorsens <2 RUHMMAZU aw ALPINE MARINE FURNISHINGS ot

Kim Heng — Investor Presentation (March 2026) on 6ix