Kim Heng Ltd · SGX:5G2

Kim Heng — Investor Presentation (January 2025)

36 slides from Kim Heng's investor presentation, January 2025

  1. Slide 1: Corporate Summary Presentation

    CORPORATE SUMMARY PRESENTATION BUILDING A STRONG FUTURE (TOWARDS GREENER WATERS) Part of the PTHAITAN ASA Hemeaume ADIRA S BRIGEWATER 9% vssmee SPRUHMMAZY | s KIM HENG Group

  2. Slide 2: Company at a glance

    Established in 1968 450+ Employees Two established waterfront shipyards in Singapore Offices in Malaysia, Singapore, Korea, Thailand, Vietnam & Taiwan S$100mil+ annual turnover 45+ Marine Vessels 29 Cranes (100t – 1,250t lift capacity) Extensive fabrication, vessel build & maintenance expertise Exte

  3. Slide 3: Services overview

    Shipyard & Fabrication Services Marine Vessel Support Port Agency and Logistics Offshore Salvage and Diving Crane Lifting Solutions Offshore Renewables Support Geotechnical Drilling and Surveys Shallow Water Cable Lay Solutions Horizontal Directional Drilling (HDD) Offshore Construction Support Pipe

  4. Slide 4: Group Location Map

    GROUP LOCATION MAP LEGEND Malaysia & Offices & Agency (Malaysia + Singapore) Singapore Shipyards Local Presence Ongoing establishment

  5. Slide 5: Group Support Services

    GROUP SUPPORT SERVICES Shipyard Services Air Diving & salvage Module fabrication Renewables services Anchor handling & Repairs (incl. DP1 & DP2) Logistics Crane Lifting Horizontal Barge Transport Module Lifting & Agency Services Solutions Directional Drilling & Towing (HDD) Supply/ Geotechnical Surv

  6. Slide 6: Shipyard and Fabrication Services

    SHIPYARD AND FABRICATION SERVICES Two well established waterfront shipyards Combined yard area of more than 53,000m2 More than 200m combined waterfront quayside Advanced welding and material handling facilities Vessel shipyard repairs & barge and vessel slipping facilities New build vessel and barge

  7. Slide 7: Shipyard and Fabrication Services

    SHIPYARD AND FABRICATION SERVICES NEW VESSEL BUILDS MODULES OFFSHORE STRUCTURES BARGE CONTRUCTION

  8. Slide 8: Accommodation Outfitting & Furnishing

    ACCOMMODATION OUTFITTING & FURNISHING HIGH STANDARDS OF ACCOMMODATION OUTFITTING FOR RIGS, VESSELS & BARGES

  9. Slide 9: 45+ Offshore Support Vessels

    OFFSHORE VESSEL SUPPORT 45+ OFFSHORE SUPPORT VESSELS AVAILABLE (INCLUDING):

  10. Slide 10: Engineering & Naval Design Services

    ENGINEERING & NAVAL DESIGN SERVICES STRUCTURAL NAVAL ARCHITECT INSTALLATION ENGINEERING DESIGN ENGINEERING  Steel Structure Design  Vessel Intact & Damage Stability  Lifting Analysis  Global Strength Analysis  Vessel inclining Experiment  Rigging Design  Local Strength Analysis  Dead weight

  11. Slide 11: Marine Support Vessel Snapshot

    MARINE SUPPORT VESSEL SNAPSHOT 402 PAX ACCOMMODATION DP2 MULTIPURPOSE TRANSPORTATION HIGH-CAPACITY DP2 / DP1 ANCHOR BARGE (with pipelay VESSEL MSV (with BARGES AND TOWING TOWING TUGS HANDLING/TOW TUGS upgrade option) moonpool) TUGS  Fleet of 156t Bollard  Fleet of DP2 & DP1  402 pax capacity  DP

  12. Slide 12: Tugs & Towing

    TUGS & TOWING 20t – 156t Bollard Pull Tugs 1,600BHP – 12,000BHP Capacity DP2, DP1 and Non-DP tug options Ocean Towing Solutions Tug and Barge combinations (100ft – 400ft)

  13. Slide 13: Transportation Barge Solutions

    TRANSPORTATION BARGE SOLUTIONS 80ft – 400ft size TRANSPORTATION BARGES Range of transportation barges available 80ft – 400ft size can be made available 5t/m² – 20t/m² deck strength Ballastable and non-ballastable type Can be fitted with spud and/ or mooring systems

  14. Slide 14: Accommodation/Work Crane Barge Bridgewater Support

    402 PAX ACCOMMODATION /worK | CRANE BARGE “BRIDGEWATER SUPPORT” Im long x 32m wide Large deck with high 12.5t/m2 load rating 300t Huisman Pedestal Crane Minimum draft only approx. 3.2m Option for upgrade to pipelay

  15. Slide 15: Port Agency and Logistics

    PORT AGENCY AND LOGISTICS MARINE & PORT AGENCY SERVICES CREW MANAGEMENT • Port Harbour Towage & Pilotage • Crew changes, visa’s & • Vessel Escort and Safety Tug immigration clearances Services • Travel & Hotel Arrangements • Vessel and Rig Move Planning • Work Permit Applications, and Marine Support

  16. Slide 16: Offshore Salvage & Diving Support

    OFFSHORE SALVAGE & DIVING OFFSHORE SALVAGE, SPILL & DIVING SUPPORT SUPPORT VESSEL SALVAGE SUPPORT AIR DIVING SOLUTIONS OFFSHORE SPILL RECOVERY ONSHORE CLEAN UP • Tug towage services • Air diving inspections • Vessel oil boom operations • Beach cleanup • Marine vessel support • Subsea visual surveys

  17. Slide 17: Crane Lifting Solutions

    CRANE LIFTING SOLUTIONS WIDE SELECTION OF CRANES AVAILABLE 1,250t, 600t, 400t, 280t, 100t & 80t capacity Many new or near new units

  18. Slide 18: Crane Lifting Solutions

    CRANE LIFTING SOLUTIONS VESSEL AND BARGE CRANE WIDE SELECTION OF 100T – HIGH CAPACITY 1250T CRAWLER LIFTING SOLUTIONS (ideal for onshore, 600T CRAWLER CRANES CRANE (suitable for renewables, onshore shipyard and offshore vessel lifting operations) (for onshore & offshore use) and offshore option) • H

  19. Slide 19: Offshore Renewables Support

    OFFSHORE RENEWABLES OFFSHORE RENEWABLES SUPPORT SUPPORT WIDE RANGE OF OFFSHORE & ONSHORE RENEWABLES SUPPORT SERVICES including: High-capacity towing tug support (up to 150t bollard pull) Anchor Handling Tug Support (AHTS) 45t to 130t bollard pull incl. DP2 DP2 MSV Geotechnical/Geophysical survey

  20. Slide 20: Shallow Water Cable & Umbilical Installation Support Services

    SHALLOW WATER CABLE & UMBILICAL INSTALLATION SUPPORT SERVICES • Offshore geotechnical drilling and soil sampling/testing services (including drilling, CPT, Vibro coring, drop & gravity test sampling) • Extensive shallow water marine assets support including DP2 MSV, DP2/DP1 and non-DP tugs and trans

  21. Slide 21: Adria300 Cable Lay Barge

    ADRIA300 CABLE LAY BARGE (currently under construction in Singapore) DP2 Cable Lay Barge Specification Summary 300ft cable lay barge with DP2 and 6-point mooring system 91.5m x 27.5 m with high deck strength (15t/m2) Suitable for cable and umbilical lay 3000t turntable for cable or umbilical product

  22. Slide 22: Bridgewater Discovery

    GEOTECHNICAL & SUBSEA CONSTRUCTION SUPPORT BRIDGEWATER DISCOVERY DP2 GEOTECHNICAL DRILLING SURVEY VESSEL (with option to use for subsea construction support & trenching)

  23. Slide 23: DP2 Geotechnical Drilling Survey Vessel

    DP2 GEOTECHNICAL DRILLING SURVEY VESSEL 76m long x wide 20m beam Geotechnical vessel with large moonpool Extensive vessel accommodation facilities with 59 pax capacity, recreation rooms, gym, offices and hospital facilities Equipped with industry leading equipment for Geotechnical soil investigation

  24. Slide 24: Geotechnical Survey Vessel (DP2 + Mooring)

    GEOTECHNICAL SURVEY VESSEL (DP2 + MOORING) Fully equipped geotechnical DP2 vessel (also with 4-point mooring) Advanced twin tower drill rig for soil core sampling down to 300m Vessel equipped with industry leading CPT system High performance Vibro Coring and Grab sampling systems 59 pax capacity and

  25. Slide 25: Advanced Cable and Pipe Shore Crossing Solutions

    ADVANCED CABLE AND PIPE SHORE CROSSING SOLUTIONS Direct Pipe Drilled Installation (DPI) Horizontal Directional Drilling (HDD) HDD for River & Lake crossings HDD from Shore to Offshore

  26. Slide 26: Horizontal Directional Drilling (HDD)

    HORIZONTAL DIRECTIONAL DRILLING (HDD) o Owners of high-capacity HDD drilling equipment with an extensive track-record for successful HDD solutions in rock to soft clay and silt o HDD solutions safeguards against environmentally damaging and higher cost open cut trench alternatives o Minimizes surfac

  27. Slide 27: Horizontal Directional Drilling (HDD)

    HORIZONTAL DIRECTIONAL DRILLING (HDD)

  28. Slide 28: Direct Pipe Drilling Solutions

    DIRECT PIPE DRILLING SOLUTIONS Combines benefits of HDD & Micro tunneling Lower risks, quicker & more cost effective One-pass solution, no back reaming required Suitable for any soil condition No requirement for casing pipe/bore hole liner 26” to 60” dia. pipe size Up to approx. 1700m drilling dista

  29. Slide 29: Direct Pipe Drilling Solutions

    DIRECT PIPE DRILLING SOLUTIONS New state of the art Direct Pipe Drilling equipment for lower risk crossing solutions (combining some of the best qualities of micro tunneling and HDD while avoiding some of their drawbacks)

  30. Slide 30: Offshore HDD & DPI Drilling Marine Support

    OFFSHORE HDD & DPI DRILLING MARINE SUPPORT Full Marine Vessel Support Spread for HDD & DPI Drilling Operations Support Services and Marine Assets including, barges, tugs, crew boats, cranes & IMCA approved dive systems etc.

  31. Slide 31: Pipeline & Cable Shore Pull-In Solutions

    PIPELINE & CABLE SHORE PULL-IN SOLUTIONS Pipeline and Cable Shore Pull-In Solutions 400t linear shore pulling winch available Selection of buoyancy options Nearshore pipe & cable burial equipment Support barges and vessels Air Diving Equipment & Support

  32. Slide 32: Trenching and Burial

    TRENCHING AND BURIAL Proven Pipeline and Cable Trenching Solutions High performance & high-capacity jet trenching Trenching solutions from shore to offshore Extensive track record including trenching to 9m+ Free span rectification solutions

  33. Slide 33: Subsea Cables, Umbilical & Flexibles Installation

    SUBSEA CABLES, UMBILICAL & FLEXIBLES INSTALLATION Simultaneous cable lay and trenching solutions 400t Hub Reel Drive System for cable, flexibles & umbilical lay Selection of cable and pipeline lay tensioners available Cable repair and burial solutions J-Tube cable pulling and hook-up support Wide ra

  34. Slide 34: Rockdumping & Transportation Solutions

    ROCKDUMPING & TRANSPORTATION SOLUTIONS ROCKDUMPING & TRANSPORTATION SOLUTIONS (barge currently in development) (barge currently under final construction) SHALLOW WATER FALLPIPE ROCK DUMPING BARGE o 100m x 30m rock dumping barge (under development) o 4300m3 rock capacity o Fallpipe system for accurat

  35. Slide 35: Material / Dredging Transportation Solutions

    MATERIAL / DREDGING (barge currently in development) TRANSPORTATION SOLUTIONS SELF PROPELLED SPLIT HOPPER BARGE (build recently completed in Kim Heng Singapore shipyard) Design & build solutions for innovative split hopper barge vessels Fast, reliable and maneuverable split hopper barges Suitable fo

  36. Slide 36: THAITAN

    @ THAITAN INTERNATIONAL ADIRA 5 BRIDG RENEWABLES OFFS WORE WATER Bo wavorsens <2 RUHMMAZU aw ALPINE MARINE FURNISHINGS ot

Kim Heng — Investor Presentation (January 2025) on 6ix