Slide 1: Indonesia’s Next World Class Mining Company
Indonesia’s Next World Class Mining Company Tujuh Bukit Oxide Heap Leach Project Update March 2016 PT Merdeka Copper Gold Tbk. 1
Slide 2: Disclaimer
Disclaimer PT Merdeka Copper Gold Tbk (“PT MCG”) make no representation or warranty (express or implied) as to the accuracy, reliability or completeness of the information. All statements in this document, other than statements of historical facts that address future timings, activities, events and
Slide 3: Preamble
Preamble PT Merdeka Copper Gold Tbk. is pleased to provide an update of the Tujuh Bukit Oxide Heap Leach Project (the Project), currently under construction in Banyuwangi, East Java, Indonesia. This update contains key information drawn from the initial Definitive Feasibility Study (DFS, 2014) and s
Slide 4: Table of Contents
Table of Contents 01 Key Findings of 02 Mineral Resource 03 Capital & The Project & Ore Reserve Operating Costs Studies Estimates 04 Infrastructure & 05 Metallurgy & Ore 06 Financial Facilities Processing Evaluation PT Merdeka Copper Gold Tbk. 4
Slide 5: Key Findings of The Project Studies
Key Findings of The Project Studies • Project is based on a well-defined JORC 2012 compliant Mineral Resource estimated to contain 2.2 million ounces of gold and 74 million ounces of silver • Ore Reserve totals 36 million tonnes of ore from 5 open pits at average grades of 0.91g/t gold and 21g/t sil
Slide 6: Table of Contents
Table of Contents 01 Key Findings of 02 Mineral Resource 03 Capital & The Project & Ore Reserve Operating Costs Studies Estimates 04 Infrastructure & 05 Metallurgy & Ore 06 Financial Facilities Processing Evaluation PT Merdeka Copper Gold Tbk. 6
Slide 7: Mineral Resource & Ore Reserve Estimates
Mineral Resource & Ore Reserve Estimates Resource & Reserve Estimates • The Tujuh Bukit Oxide deposits are classified as High Sulphidation Epithermal (HSE) type containing economic accumulations of gold and silver. • They are related to, but spatially independent of the underlying Tujuh Bukit Porphy
Slide 8: Mineral Resource & Ore Reserve Estimates
Mineral Resource & Ore Reserve Estimates Tujuh Bukit Oxide Physicals by Pit Table below will show the details the Ore Reserve into each of the 5 planned open pits Pit Ore Gold Silver Waste Strip (Mt) (g/t) (g/t) (Mt) Ratio A 18.0 0.8 16 5.6 0.3 B East 1.0 2.8 2.3 2.9 2.9 B West 5.7 1.3 17 6.0 1.1 C
Slide 9: Table of Contents
Table of Contents 01 Key Findings of 02 Mineral Resource 03 Capital & The Project & Ore Reserve Operating Costs Studies Estimates 04 Infrastructure & 05 Metallurgy & Ore 06 Financial Facilities Processing Evaluation PT Merdeka Copper Gold Tbk. 9
Slide 10: Capital & Operating Costs
Capital & Operating Costs Capital Costs Item US$ Million Pre-Production Direct Capital 87.0 Owners Costs 30.9 Contingency 11.8 Total Initial Capital 129.7 Sustaining Capital 30.2 Initial Project capital costs including Contingency 3.0 owner’s costs and a 10% contingency Total Sustaining Capital 33.2
Slide 11: Capital & Operating Costs
Capital & Operating Costs Operating Costs • Life of mine operating costs are projected to total US$410 million being equivalent to US$ 488 per ounce (recovered, before silver credits) or US$ 11.46 per tonne ore placed on the leach pad. • Operating costs incurred prior to the start of mining have bee
Slide 12: Table of Contents
Table of Contents 01 Key Findings of 02 Mineral Resource 03 Capital & The Project & Ore Reserve Operating Costs Studies Estimates 04 Infrastructure & 05 Metallurgy & Ore 06 Financial Facilities Processing Evaluation PT Merdeka Copper Gold Tbk. 12
Slide 13: Infrastructure & Facilities
Infrastructure & Facilities Key Areas of Infrastructure ORE PREPARATION PLANT HEAP LEACH FACILITIES POWER SUPPLY (OPP) •OPP has been selected in a location •The Heap Leach Facility (HLF) layout •Government Electricity Company outside the blast zone and adjacent to includes: (Perusahaan Listrik Negar
Slide 14: Infrastructure & Facilities
Infrastructure & Facilities Project General Arrangement Diagram PT Merdeka Copper Gold Tbk. 14
Slide 15: Table of Contents
Table of Contents 01 Key Findings of 02 Mineral Resource 03 Capital & The Project & Ore Reserve Operating Costs Studies Estimates 04 Infrastructure & 05 Metallurgy & Ore 06 Financial Facilities Processing Evaluation PT Merdeka Copper Gold Tbk. 15
Slide 16: Metallurgy & Ore Processing
Metallurgy & Ore Processing Gold & Silver Extractions • Gold extraction from the ore types at Tujuh Bukit have been shown to be relatively insensitive to crush size in bottle roll and column leach test-work up to a crush size of 75mm. The selected process option consists of: – Two-stage open circuit
Slide 17: Metallurgy & Ore Processing
Metallurgy & Ore Processing Expected Field Leach Performance Figure below presents expected field leach performance employing a simple open circuit crushing plant (P100 ~75mm). Leach kinetics indicate 50% to 80% extraction of gold from oxide ores in 30 days of field leaching, or over 75% of final ex
Slide 18: Metallurgy & Ore Processing
Metallurgy & Ore Processing Expected Reagent Consumptions The expected reagent consumptions for the Tujuh Bukit oxide and transition ores at the two size distributions evaluated are presented in Table below. NaCN, kg/t Hydrated Lime, kg/t Cement, kg/t Ore Type Min Max Avg Min Max Avg Min Max Avg Oxi
Slide 19: Metallurgy & Ore Processing
Metallurgy & Ore Processing Report • The plant and project design processing rate is 4.0 million tonnes per annum (Mtpa) of oxide and transition ore over a 9-year project life for a total leach pad capacity approaching 36 Mt of gold and silver ore stacked by truck. • The ore will be stacked in nomin
Slide 20: Flow Sheet for Heap Leaching
Metallurgy & Ore Processing Flow Sheet for Heap Leaching PT Merdeka Copper Gold Tbk. 20
Slide 21: Table of Contents
Table of Contents 01 Key Findings of 02 Mineral Resource 03 Capital & The Project & Ore Reserve Operating Costs Studies Estimates 04 Infrastructure & 05 Metallurgy & Ore 06 Financial Facilities Processing Evaluation PT Merdeka Copper Gold Tbk. 21
Slide 22: Financial Evaluation
Financial Evaluation • The financial viability of the Tujuh Bukit Heap Leach Project has been assessed using the Discounted Cash Flow (DCF) methodology which considers project cash-flows and the time-value of money. • The cash flows are based on constant dollar assumptions for costs and revenues and
Slide 23: Indonesia’s Next World Class Mining Company
Indonesia’s Next World Class Mining Company PT MERDEKA COPPER GOLD TBK International Financial Centre, 12A Floor Jl. Jend. Sudirman Kav. 22-23 South Jakarta – 12920 Telephone: (+62 21) 2941 0806 Facsimile: (+62 21) 2941 0807 For further information, please contact the following email: investor.relat