Slide 1: Intimation of earnings conference call to stock exchanges
October 30, 2026 To, BSE Limited The National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers, Exchange Plaza, Dalal Street, Bandra - Kurla Complex, Mumbai - 400 001 Mumbai - 400 051 Company Code No. 531120 Company Code: PATELENG Dear Sir/Madam, Sub: Intimation of conference call to discus
Slide 2: Earnings Con-call Invite
Earnings Con-call Invite VALOREM ADVISORS is pleased to invite you for a Conference Call to discuss Q2/H1-FY27 earnings of Patel Engineering Limited On Friday, November 06, 2026 at 10:00 AM (IST) Ms. Kavita Shirvaikar - Managing Director & Mr. Rahul Agarwal - Chief Financial Officer Dial in details
Slide 3: Investor Presentation Q2/H1-FY27
Patel Engineering Limited INVESTOR PRESENTATION April, 2026 INVESTOR PRESENTATION Q2/H1-FY27
Slide 4: Snapshot
Snapshot 75 + 350+ INR 1,35,464 Mn Years of Industry Projects Executed Total Order Book Presence 87+ 300+ 15,000+ Dams Constructed KM Tunnels MW Hydro Project 52 14 5.5+ States – Domestic Ongoing Projects Lakh Acres Irrigated Presence 2.72 2 1,200+ Book-to-Bill Nepal & Bhutan – KM of Roads (Q2/H1 FY
Slide 5: Q2/H1-FY27 Performance
Q2/H1-FY27 PERFORMANCE
Slide 6: Key Financials and Operational Highlights
Key Financials and Operational Highlights Q2-FY27 Consolidated Performance Q2 FY27 – Key Highlights Revenue from Achieved successful breakthrough of ~12 km irrigation tunnel at OP. EBITDA OP. EBITDA Margin Operations the Sleemanabad project using a 10m dia. TBM INR 12,107 Mn INR 1,503 Mn 12.41% 0.2%
Slide 7: Key Operational Updates – Q2 FY27 (1/2)
Key Operational Updates – Q2 FY27 (1/2) Subansiri Lower Hydropower Project Commencement of Wet Commissioning of Unit 7 - Commencement of Machine Hall Floor and Unit 8 - Commencement of Turbine Floor and Unit 5 (250 MW) Generator Floor concreting works Generator Floor concreting works Sleemanabad Car
Slide 8: Key Operational Updates – Q2 FY27 (2/2)
Key Operational Updates – Q2 FY27 (2/2) Kiru Hydropower Project 12 lakh cubic meters of dam concreting achieved out Advancing toward Dam completion with the Power House slab concreting works complete of a total target of 12.50 lakh cubic meters commencement of Deck Slab concreting works following th
Slide 9: Awards & Accolades
Awards & Accolades Maharashtra’s Best Employer Brand 18th IEI Industry Excellence Award 2026 (Gold): Awards 2026 Construction Engineering Organizations Hydro Vibhushan Award: Kavita Shirvaikar, Best Hydropower EPC Enterprise of INDIA-18th INDIA Hydropower’s First Woman Business Leader Hydro & PSPs A
Slide 10: Order Intake & Order Backlog
Order Intake & Order Backlog Order Intake (At the end of each year, Values in INR. Mn) H1-FY27 Segmental Order Intake – INR 645 Mn 50000 44,009 45000 40,742 40000 35000 30000 25000 20000 15000 10000 5000 1,112 645 0 Irrigation, 100.00% FY24 FY25 FY26 H1-FY27 Order backlog (At the end of each year, V
Slide 11: Total Order Book
Total Order Book Segment Wise Order Book Client Wise Order Book Project Completion Status 5.89% 3.56% 2.91% 15.85% 1.61% 16.70% 3.57% 41.15% 28.80% 16.36% 14.48% 62.40% 63.64% 17.75% 5.33% Hydroelectric Irrigation Central Government / PSU’s State Government Below 10% 10% - 30% 30% - 50% Tunnel Road
Slide 12: Geographical Presence & Order Book Split
Geographical Presence & Order Book Split 52 Ongoing Projects spread across 14 states domestically and also Jammu and International presence in Nepal and Bhutan with a total project value Kashmir of INR 1,35,464 Mn Himachal Domestic Pradesh Arunachal Sr.No. State No. of Projects Project Value (INR Mn
Slide 13: Quarterly Consolidated Income Statement
Quarterly Consolidated Income Statement Particulars (INR Mn) Q2-FY27 Q2-FY26 Y-o-Y Q1-FY27 Q-o-Q Revenue From Operations 12,107 12,085 0.2% 12,807 (5.5)% Total Expenses 10,604 10,498 1.0% 11,011 (3.7)% Operating EBITDA 1,503 1,587 (5.3)% 1,796 (16.3)% EBITDA Margins (%) 12.41% 13.13% (72) Bps 14.02%
Slide 14: Half Yearly Consolidated Income Statement
Half Yearly Consolidated Income Statement Particulars (INR Mn) H1-FY27 H1-FY26 Y-o-Y Revenue From Operations 24,914 24,419 2.0% Total Expenses 21,615 21,179 2.1% Operating EBITDA 3,299 3,240 1.8% EBITDA Margins (%) 13.24% 13.27% (3)Bps Depreciation and Amortization 512 516 (0.8)% Finance Costs 1,278
Slide 15: Strategic Overview
STRATEGIC OVERVIEW
Slide 16: Focused Strategy to Drive Sustainable Growth
Focused Strategy to Drive Sustainable Growth Build capabilities in technology- Focus on high entry-barrier driven execution including segments including hydropower, pumped storage, and tunneling 01 04 tunneling, underground works, and advanced construction methods Leverage strong positioning in Main
Slide 17: Strengthening Balance Sheet & Credit Profile
Strengthening Balance Sheet & Credit Profile Debt Breakup (INR Mn) Total Debt Plus Advances (INR Mn) 16,025 22,670 13,121 18,092 19,212 11,870 6,645 10,015 6,222 6,091 8,469 9,623 16,025 11,870 13,121 6,010 3,401 3,498 FY25 FY26 H1 FY27 FY25 FY26 H1 FY27 Term Debt Working Capital Debt Total Debt Deb
Slide 18: Company Overview
COMPANY OVERVIEW
Slide 19: Company Overview
Company Overview • Established in 1949, Patel Engineering Limited (PEL) is a leading integrated infrastructure and Revenue & EBITDA Margin engineering, procurement, and construction company, headquartered in Mumbai, with over 50,934 51,027 45,441 75 years of experience. • Has completed over 350 infr
Slide 20: Board of Directors & Key Managerial Persons
Board of Directors & Key Managerial Persons Janky Patel | Chairperson & Non- Kavita Shirvaikar | Managing Kishan Lal Daga | Whole Time R V R Kishore | Whole Time Director- Ms. Sudha Navandar | Independent Executive Director Director Director Operations Director Non-Executive Chairperson "Continuing
Slide 21: Marquee Clientele
Marquee Clientele Madhya Pradesh Water Resources Department Investor Presentation 19
Slide 22: Marquee Projects Executed
Marquee Projects Executed Sawrakuddu HE Project - Himachal Pradesh (111 MW) Koyna HE Project - Maharashtra (260MW) First Piano Key Weir in India First Lake Tapping in Asia. Rampur HE Project - Himachal Pradesh (432 Mw) Srisailam HE Project - Andhra Pradesh (900 MW) Ghatghar Dam – Maharashtra 84m hig
Slide 23: Business Overview
__ BUSINESS _ OVERVIEW
Slide 24: Business Overview
Business Overview Hydropower & Dam Irrigation & Water Infrastructure Infrastructure • Dams, Underground Works & • Canal Networks & Water Powerhouses Distribution Systems • Tunnelling-Intensive Hydro • Large-Scale Government Projects Irrigation Projects • Government & PSU-Led Projects • Water Resourc
Slide 25: Hydropower & Dam Infrastructure
Hydropower & Dam Infrastructure • Execution of large-scale hydropower and pumped storage engineering, procurement and construction Revenues (INR Mn) projects. 28,145 24,593 22,061 • Involvement across critical hydro infrastructure components, including dams, tunnels, and underground powerhouses. 17,
Slide 26: Irrigation & Water Infrastructure
Irrigation & Water Infrastructure Revenues (INR Mn) • Execution of large-scale irrigation and water infrastructure projects across India. 13,251 • Focus on development of canal networks, water distribution systems, and associated civil works. 11,387 10,658 • Focus on improving water-use efficiency t
Slide 27: Tunnelling & Underground Engineering
Tunnelling & Underground Engineering Revenues (INR Mn) • Specialised engineering segment focused on underground infrastructure across hydropower and transportation projects. 8,384 • Expertise in advanced tunnelling techniques including tunnel boring machine and drill-and-blast methods. 6,350 5,351 •
Slide 28: Transportation, Urban Infrastructure & Others
Transportation, Urban Infrastructure & Others Revenues (INR Mn) • Execution of transportation infrastructure projects including roads, bridges, rail tunnels, urban connectivity works and others. 7,739 • Participation in highway, railway, and metro-related projects across multiple regions. 6,372 • In
Slide 29: Industry Overview
INDUSTRY OVERVIEW
Slide 30: Hydropower & Pumped Storage Opportunity Pipeline
Hydropower & Pumped Storage Opportunity Pipeline Pumped Key Drivers Hydropower Storgae Clean & Renewable Energy: Projects • Hydropower and PSP’s are critical for India’s clean energy transition. Growing Power Demand: • Rising demand and peak power requirements BUILDING A STRONG driving new capacity
Slide 31: Financial Overview
FINANCIAL OVERVIEW pep eT
Slide 32: Historical Consolidated Income Statement
Historical Consolidated Income Statement Particulars (INR Mn) FY24 FY25 FY26 H1-FY27 Revenue From Operations 45,441 50,934 51,027 24,914 Total Expenses 38,538 43,602 44,187 21,615 EBITDA 6,903 7,332 6,840 3,299 EBITDA Margins (%) 15.19% 14.40% 13.40% 13.24% Depreciation and Amortization 976 998 1,03
Slide 33: Historical Consolidated Balance Sheet
Historical Consolidated Balance Sheet Particulars (INR Mn) FY25 FY26 H1-FY27 Particulars (INR Mn) FY25 FY26 H1-FY27 EQUITY 37,768 44,420 46,796 Non - Current Assets 39,492 40,904 40,093 a) Equity Share Capital 844 992 992 a) Property Plant & Equipment 12,827 12,550 12,492 b) Other Equity 37,002 43,4
Slide 34: Financial Performance
Financial Performance Revenue from Operation (INR Mn) EBITDA (INR Mn) & EBITDA (%) PAT (INR Mn) & PAT (%) # 7,332 50,934 51,027 6,903 6,840 2,945 45,441 2,641 2,422 1,767 24,914 3,299 15.19% 14.40% 13.40% 13.24% 7.09% 5.81% 4.75% 5.77% FY24 FY25 FY26 H1-FY27 FY24 FY25 FY26 H1-FY27 FY24 FY25 FY26 H1-
Slide 35: Capital Market Information
Capital Market Information Share Price up to 30th September, 2026 10% 0% -10% -20% -30% -40% -50% Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Patel Engineering Sensex Price Data (As on 30th September, 2026) INR Shareholding Pattern (As on 30th September, 2026)
Slide 36: Disclaimer
Disclaimer Patel Engineering Ltd No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Such information and opinions are in all events n
Slide 37: Thank You
LoL eke (iii THANK YOU
Slide 38: Q2 and H1 FY2027 Earnings Conference Call Transcript
Patel Engineering Limited Q2 and H1 FY’2027 Earnings Conference Call November 06, 2026 Moderator: Ladies and gentlemen, good day and welcome to the Patel Engineering Limited's Q2 and H1 FY’2027 Earnings Conference Call hosted by Valorem Advisors. As a reminder, all participant lines will be in the l
Slide 39: Transcript Page 2 of 16
First of all, on behalf of the entire Patel Engineering family, I would like to wish you and your families a very Happy Dhanteras and a Wonderful Diwali. Thank you for joining us on this festive occasion to discuss our Q2 and H1 FY’27 performance. Let me begin with a brief overview of our performanc
Slide 40: Transcript Page 3 of 16
We are particularly encouraged by growing opportunities in pumped storage alongside conventional hydro, irrigation and tunneling. These are segments where Patel Engineering has considerable experience, technical expertise and a proven execution track record. Our approach to bidding will continue to
Slide 41: Transcript Page 4 of 16
particularly meaningful because of its potential contribution to agricultural productivity and regional development. Alongside our operational progress, we continue to take steps towards unlocking value from non-core assets and strengthening our balance sheet. During the quarter, we transferred our
Slide 42: Transcript Page 5 of 16
On a standalone basis, revenue is INR 2477 crores compared to INR 2422 crores in H1 FY’26. Operating EBITDA is INR 323 crores with a margin of 13.04% compared to INR 310 crores with a corresponding margin of 12.79% in H1 FY’26. Net profit after tax is INR 133.5 crores compared to INR 133.8 crores in
Slide 43: Transcript Page 6 of 16
Rajiv Rupani: Okay, sir. And my next question was on the land bank. So, can we have the location of our Panvel land bank and the Hyderabad land bank, about 400 acres which is left. Can you give us the location, please? Can you share the location with us? Rahul Agarwal: Yes, but see the location is o
Slide 44: Transcript Page 7 of 16
Kavita Shirvaikar: We own around four TBM machines. And we already own four tunnel boring machines. We feel that whenever this kind of opportunity will come, first, we can use our own available machine. And if requirement, we can explore the manufacturing, buying from India, other options. Rahul Aga
Slide 45: Transcript Page 8 of 16
Moderator: Thank you. The next question is from the line of Viraj Mahadevia from Money Grow. Please go ahead. Viraj Mahadevia: Hi, Kavita Rahul. Thank you so much for the comprehensive introduction and opening. I have a couple of questions from my side. So, revenue growth has been a bit disappointin
Slide 46: Transcript Page 9 of 16
Viraj Mahadevia: Okay. My next question is, Kavita ma'am mentioned about monetization of about INR 80 crores. I did not catch that. This was the JV stake plus land monetization and which land was this? If you do not mind? Rahul Agarwal: First quarter, we had done a land monetization of around INR 26
Slide 47: Transcript Page 10 of 16
around INR 30,000 crores worth of projects. So, they are all expected to open. So, hydro projects, particularly because they go through a lot of clearances, so government gives little time, but we expect that to open next few months. Pritesh Chheda: And let us say, so this comment of yours refers to
Slide 48: Transcript Page 11 of 16
Kavita Shirvaikar: So, we expect next two to three months it will open and then LOI can be in quarter 4 actually. Pritesh Chheda: So, the bulk of this 30,000? The bulk of this 30,000? Kavita Shirvaikar: Yes, we see the majority might open by March, correct. Pritesh Chheda: Okay. Thank you, ma'am, an
Slide 49: Transcript Page 12 of 16
Viraj Mahadevia: Hi. A couple of more questions, please. The arbitration awards, any update on that likely for this financial year? Is it still on track for that INR 100 crores to INR 150 crores? Rahul Agarwal: So, we are on track for around INR 100 crores, INR 150 crores. INR 80 crores of total alr
Slide 50: Transcript Page 13 of 16
Rahul Agarwal: So, we have to buy heavy machinery equipments for projects like TBM machines or, you know, there are other machines which are required to buy, which we can use for multiple projects. So, then we buy it accordingly. Viraj Mahadevia: And do we have to buy it or can we even lease some of
Slide 51: Transcript Page 14 of 16
Rahul Agarwal: But yes, that is one part of it. Viraj Mahadevia: Sorry, I missed the early part. Rahul Agarwal: You said that is multiple factors, but yes, this is also one part of it. Viraj Mahadevia: Okay. What are the other parts of it? Rahul Agarwal: So, it depends upon like the monsoon and then
Slide 52: Transcript Page 15 of 16
course, this is in your hand. The arbitration may not be in your hands. And arbitration subsequently, if you receive the surpluses, that goes to your bottom line and improve your working conditions, working capital conditions. I never understand this. And henceforth, I definitely would expect you to
Slide 53: Transcript Page 16 of 16
Rajiv Rupani: Okay. And my last point is the promoter pledge, instead of waiting for next year, I would request that the promoters reduce their pledge significantly as soon as possible. Thank you, sir. Moderator: Thank you. Ladies and gentlemen, we will take that as the last question for today. I no