Agnico Eagle Mines Limited · TSX:AEM

Agnico Eagle Mines — Shareholder Meeting (April 2025)

15 slides from Agnico Eagle Mines's shareholder meeting presentation, Apr 25, 2025

  1. Slide 1: Annual and Special Meeting of Shareholders

    Annual and Special Meeting of Shareholders April 25, 2025

  2. Slide 2: Notes to Investors: Forward-Looking Statements

    Notes to Investors Forward-Looking Statements The information in this presentation has been prepared as at April 24, 2025. Certain statements contained in this presentation constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 199

  3. Slide 3: The Arctic Edge: Stories from Canada's Frontier

    The Arctic Edge: Stories from Canada’s Frontier Episodes 1 & 2 Available May 1, 2025  Hosted by Award-Winning journalist and Subscribe now at broadcaster, Hannah Thibedeau thearcticedge.ca  Explores the North’s social, economic and environmental opportunities and its strategic importance for Canad

  4. Slide 4: Gold – A Safe Haven in Periods of Uncertainty

    Gold – A Safe Haven in Periods of Uncertainty History of Gold Price Cycles $5,120 3rd Gold Cycle 1st Gold Cycle $2,560 • Uncertainty around tariff and Within the cycle, gold price trade dispute impacts increased by more than 550% in from 1976 to 1980 • Aggressive accumulation of gold Gold Price - US

  5. Slide 5: Superior Share Performance Since Merger

    Superior Share Performance Since Merger Agnico Eagle Has Outperformed the S&P500, Gold and Gold Equities AEM US Equity CAGR 200% 31.5% Gold Spot CAGR 20.2% 100% XAU Index CAGR 11.4% S&P 500 Index CAGR 5.5% 50% 2022 2023 2024 2025 Source: Bloomberg, CapIQ – February 8, 2022 (closing date of the merge

  6. Slide 6: Agnico Eagle: A High-Quality, Low-Risk Senior Gold Producer

    Agnico Eagle: A High-Quality, Low-Risk Senior Gold Producer Third Largest Gold Producer Increasing Shareholder Value Proven Geological Potential in Premier Jurisdictions 2005 2024 1 Operating Mines 11 1 Operating Countries 4 240 Gold Production (koz) 3,485 ~14x Gold Production 2.7 7.0 ~3x (oz per 1,

  7. Slide 7: Track Record of Operational Excellence Demonstrates Strength of Business

    Track Record of Operational Excellence Demonstrates Strength of Business 2024 Highlights Per Share Results Net Debt1 Position ($M)  Delivered record results $2.50 $1,316 • Gold production $2.00 $1.53 $1.50 $1.14 $1.26 • Adjusted net income $1.07 $920 $1.00 $0.76 • Cash flow $0.50 $490 • Share price

  8. Slide 8: FY2025 and Beyond – Strongest Position in Our History

    FY2025 and Beyond – Strongest Position in Our History Updated Three Year Guidance 1) Stable Production Outlook at Peer Leading Costs 2025 Guidance1 Range Midpoint  Expected total cash costs and AISC up 4% and 3%, Production Guidance (Moz) 3.3 – 3.5 3.4 respectively, vs. 20241 Total Cash Costs2 ($/o

  9. Slide 9: Detour Lake – Pathway to One Million Ounce Annual Producer

    Detour Lake – Pathway to One Million Ounce Annual Producer  World-class asset – Largest producing mine in Canada; open pit mine life until 2053 and potential underground mine  Outlined pathway to 1Moz annual production beginning in 2030; mill optimization to 29mtpa ongoing  Development of 2km exp

  10. Slide 10: Canadian Malartic – Vision to One Million Ounce Annual Producer

    Canadian Malartic – Vision to One Million Ounce Annual Producer  Development of Odyssey progressing on schedule  Vision to 1Moz annual gold production • 2nd shaft – Internal technical evaluation ongoing • Marban – Acquisition of O3 Mining completed in Q1 2025; potential to become satellite open pi

  11. Slide 11: Hope Bay – Advancing the Potential for a Larger Production Scenario

    Hope Bay – Advancing the Potential for a Larger Production Scenario  Advancing the potential for ~400koz production scenario  Initial indicated mineral resource estimate at Patch 7  Upgrading existing infrastructure and advancing site preparedness for a potential redevelopment Annual and Special

  12. Slide 12: Upper Beaver – Opportunity to Grow Lower-risk, Profitable Production

    Upper Beaver – Opportunity to Grow Lower-risk, Profitable Production Kirkland Lake camp Galloway at Upper Beaver project  Results of internal evaluation announced in July 2024 for a standalone mine and mill scenario  Potential average annual production of ~210koz beginning in 2031  Advancing work

  13. Slide 13: San Nicolas – World Class VMS Deposit

    San Nicolas – World Class VMS Deposit Mexican operations San Nicolas Project  50/50 joint venture with Teck Resources Limited  Feasibility study and execution strategy development ongoing – study completion expected in H2 2025  Project approval is expected to follow, subject to receipt of permits

  14. Slide 14: High-Quality Business Positioned to Generate Strong Returns

    High-Quality Business Positioned to Generate Strong Returns Low-Risk Mining Highest Quality Senior Uniquely Positioned Strong Financial Returns Jurisdictions Gold Producer High-quality project pipeline in Emphasis on per share value Multi-mine, multi-decade High sustainability standards core operati

  15. Slide 15: agnicoeagle.com

    Trading Symbol: AEM on TSX & NYSE Investor Relations: 416-947-1212 info@agnicoeagle.com agnicoeagle.com

Agnico Eagle Mines — Shareholder Meeting (April 2025) on 6ix