34 slides from Spanish Mountain Gold's investor presentation, March 2022
Slide 1: TSX-V: SPA | OTC: SPAZF – De-risk + Optimize, March 2022
COYCIICF (-) r) ( \ -risk + Optimize March 2022 a TSX-V = | OTC:
Slide 2: Forward-looking statements
Certain of the statements and information on this presentation constitute “forward-looking statements” or “forward-looking information”. Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or re
Slide 3: Current Priorities
Current Priorities De-risk : Fast-track EA/ Mine Permitting Optimize: Targeted Studies + Resource Expansion 2021 Pre-feasibility Study* Robust Production Mine Life: 14 Years + Economics Avg. Annual Prod’n: >183Koz (1st 6yrs) >150Koz (LOM) Large Gold Resource AISC per oz: $801 NPV 5% : $1.2B
Slide 4: Project Reserve/Resource
Excellent access & infrastructure in a top-tier mining jurisdiction (British Columbia, Canada) Project Advancing multi-million oz. gold Reserve through critical milestones towards permits and production Robust economics shown in Pre-Feasibility Study (2021) Reserve/ Resource Large & growing
Slide 5: Project Attributes and Management Approach
Renewable Power Efficiency Communities Empowerment Connectivity to Low power & Long-term thinking and commitments on Project hydroelectric power / reagent ESG issues commensurate with a long mine lower greenhouse gas requirements & life Attributes emissions efficient milling Abundance of loc
Slide 6: 1. De-risk 2. Optimize
Deliver project milestones within compressed timeline Fast-track Environmental Assessment/ Permitting activities 1. De-risk Completed Pre-Feasibility Study in Q2 2021 Near-term Deliverables: EA & permitting; feasibility study + Enhance project economics & resource Ongoing targeted trade-
Slide 7: Multi-million oz Reserves
Reserve • Higher grade/ near-surface portion of the large and growing Resource Mill Feed Profile Total feed: 96m tonnes Avg. Au grade: 0.76 g/t (0.88 g/t first 6-yrs) PFS pit (max. depth < 250m) Total contained gold: 2.34 Moz Multi-million oz Reserves Future Opportunities Proposed Mine Profile
Slide 8: NPV and Internal Rate of Return
Pre-tax NPV Pre-tax IRR $2,000 48% 43% Internal Rate of Return NPV (C$ Million) $1,500 $ 1B 38% 33% $1,000 28% $1.2B 23% $500 18% 13% $- 8% 1,400 1,600 1,800 2,000 2,200 Gold Price (US$) “Base Case” “Spot Case” “Forward Case” Gold Price Scenario Pre-tax NPV@5% C$mm $848 $1,209 $1,570 IRR % 25 31 36
Slide 9: Access & Infrastructure, Low Milling Cost
Access & Infrastructure < 100k highway access to Williams Lake (major mining supply centre & labour pool) Abundance of grid power and BC Hydro substation connectivity Supplies & labour available from many surrounding communities (low overhead costs) Year-round access/ accommodating climate/
Slide 10: Million Ounces: resource expansion track record
To continue track record of resource expansion Reserve M&I Resource* 5.0 4.5 Million Ounces 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 2008 2009 2011 2012 2014 2017 2019 2021 Year of Resource Estimate * at economic cut-off grade 10
Slide 11: Resource expansion drilling strategy and findings
Strategy/ Approach Tested 4 broad areas in resource with limited historic drilling Potential to expand resource along strike & at depth Key Findings Long intercepts (up to 69m) reported in all 4 tested areas at above economic cut-off grade 13.72m grading 1.04 g/t, including 3.05m grading 2.1
Slide 12: Ambitious Targets for Environmental Assessment
2022 Q1 Q2 Q3 Q4 Ambitious Submission of Initial Project Description Targets for Submission of Detailed Project Description Signing of Life-of-Mine Relationship Environmental Agreement with all three First Nations Assessment Launching Community Open Houses/ Consultations Value-added
Slide 13: Jurisdiction/Location, Large Reserve/Resource, Accelerated Timeline
Jurisdiction/ Location • Mining friendly/ excellent access & infrastructure Large Reserve/Resource • 2.3 Moz P&P Reserves / 4.6 Moz M&I Resource & growing + Inferred Accelerated Timeline • Building on detailed work performed over a decade (environmental baseline; metallurgical; archaeological
Slide 14: Valuation and production cost metrics
Marketcap/Net Asset Value*(5% disc.) Production cost*: AISC per oz (LOM avg) <0.15 US$801 Marketcap per Reserve* oz Marketcap per Resource oz <US$35 <US$15 Post-tax Free cashflow from Operations* Production per year* (First 6-yr avg) >$120M/Yr or >180K oz (first 6-yrs) >$1.7 B LOM >150 K oz (LOM) *
Slide 15: Location, De-risking Activities, Reserve/Resource
Location De-risking Activities Reserve/Resource TSX-V: SPA | OTC : SPAZF 15
Slide 16: Low Cost, Attracting Major Acquisitions
Cheap grid power – 6.5¢/kWh Among lowest corporate tax rates in Canada Low Cost Refundable Mineral Exploration Tax Credit (made permanent in 2019) Barkerville Gold Mines by Osisko G&R for C$ 338 M 70% of Red Chris Mine by Newcrest Mining for US$806 M 46% of New Afton by Ontario Teachers’
Slide 17: Top-tier Pro-mining Jurisdiction and Infrastructure
Top-tier Pro-mining Jurisdiction Low political risks/ strong resource sector Attracted major in-bound investments in recent years Solid track record of new mine permitting Excellent Mining Infrastructure & Access Close to producing mines – Gibraltar, QR Mine & Mount Polley Paved highway ac
Slide 18: Extensive Project Work Completed
Over $85m in total project expenditures 900+ drill holes over 180,000 metres PFS completed in Q2 2021 delineating a 2.3 Moz reserve Extensive Project Work Completed in Multiple Areas Ongoing project optimization and resource expansion Significant work performed over a decade & ongoing EA a
Slide 19: Mining Near-surface / Higher-grade Resources as Standalone Operations
Mining Near-surface / Higher-grade Resources as Standalone Operations (Main Zone Reserve) Optimal Mix of “Right-size” mill throughput to lower initial capex while maintaining robust production Capex, Production & Enhance financing options and shorten payback of initial capex Opex Continue to o
Slide 20: Simple Flowsheet & High Au Recovery
Simple Flowsheet & High Au Recovery Confirmatory testwork completed at multiple laboratories Efficient conventional milling – coarse grind, moderate power cost of 13.8 kwh/t and low cyanide consumption of 0.1 kg/t Overall gold recovery at 90% 90 % overall Au Recovery + Ag credit Crush & Grind
Slide 21: Community Engagement, Environmental Data, Permitting
Ongoing engagements with all three Indigenous Nations began 2010 Long-standing practice of sourcing employees from Indigenous Nations and Community Engagement local communities Near-term Deliverables: Life-of-Mine Relationship Agreement with all three Nations Archaeological clearance obtaine
Slide 22: Major Project Milestones
Y-1 Y-2 Y-3 Y-4 Y-5 project optimization/ feasibility study Major Project environmental assessment* & permitting Milestones project finance engineering & construction * Key driver of timeline Location Reserve/ Resource 22 TSX-V: SPA | OTC : SPAZF
Slide 23: Sediment-Hosted Gold Deposits
Sediment-Hosted Gold Deposits One of the first recognized sediment-hosted bulk tonnage gold systems in British Columbia Gold is finely disseminated within black argillites and siltstones, as well as well local high-grade, gold-bearing quartz veins within siltstones, greywackes and tuff Sedimen
Slide 24: Proven and Probable Reserve
Tonnage (Mt) Au Grade (g/t) Gold (Moz) Ag Grade (g/t) Silver (Moz) Proven 40.8 0.79 1.03 0.67 0.88 Probable 55.1 0.74 1..31 0.74 1.30 Total P&P Reserve 95.9 0.76 2.34 0.71 2.18 * Delineated in 2021 PFS. See cautionary statements Location De-risking Activities TSX-V: SPA | OTC : SPAZF 24
Slide 25: Large and Growing, Development Flexibility
Ensure long-life operations to ride out price cycles Large and Growing Continue resource expansion with ongoing drilling program Completed various scoping studies supporting potential viability at different throughput: Development Flexibility 40,000 tpd 20,000 tpd 10,000 tpd < 50% of M
Slide 26: PFS Mineral Reserves and M&I Resource
PFS delineates Proven & Probable Mineral Reserves totaling 96 million tonnes @ 0.76 g/t = 2,339,000 ounces Au (<50% of M&I resource) Tonnes Gold grade Gold Silver grade Silver Resource Category (Million) (g/t) (Million oz) (g/t) (Million oz) Measured 69 0.59 1.3 0.67 1.5 Indicated 226 0.47 3.4 0.73
Slide 27: Phoenix Zone
Phoenix Zone Strike length over 3.5km in length & less than 2km from the Main Zone Preliminary metallurgical testing suggests material is amenable to same processing flowsheet as Main Zone Location De-risking Activities TSX-V: SPA | OTC : SPAZF 27
Slide 28: Cash & Capital Structure
Cash & Capital Structure 18% 52% Net cash $6m 30% Share issued & outstanding 328m Warrants 68m Options 9m Retail Market capitalization $80m Institutional (Eric Sprott 16%; Others 14%) Management/ Directors/ Insiders TSX-V: SPA | OTC : SPAZF 28
Slide 29: Management and Board of Directors
Industry & Business Management Expertise Experience Larry Yau, CEO M&A, finance >30 yrs Sharon Ng, CFO finance, accounting >20 yrs Judy Stoeterau, VP-Geology exploration, geology >30 yrs engineering, project management, Ray Mah, Project Director >30 yrs mine construction Doug Ramsey, Director, Susta
Slide 30: Spanish Mountain Gold Ltd.
Spanish Mountain Gold Ltd. 1120-1095 West Pender St. Vancouver, B.C., V6E 2M6 Canada www.spanishmountaingold.com Larry Yau, CEO Email: info@spanishmountaingold.com Tel:+1 (604) 398-4377 Subscribe for email update: https://spanishmountaingold.com/contact/subscribe-for-updates/ TSX-V: SPA | OTC : SPAZ
Slide 31: TSX-V: SPA | OTC: SPAZF
TSX-V: SPA | OTC : SPAZF 31 ss
Slide 32: Pre-tax and Post-tax Economics by Gold Price
Gold Price (USD) Pre-tax Economics $1,200 $1,400 $1,600 $1,800 $2,000 $2,200 $2,400 NPV(5%) $M $125 $487 $848 $1,209 $1,570 $1,932 $2,293 IRR % 9% 18% 25% 31% 36% 42% 47% Payback Yrs 5.4 4.0 3.2 2.7 2.4 2.1 1.9 Cumulative Free Cashflow from $M $1,040 $1,583 $2,127 $2,670 $3,214 $3,758 $4,301 Operati
Slide 33: Unit Cost of Production and Operational Metrics
Unit Cost of Production Unit CAD USD Mining $/t mined $2.22 $1.69 Mining $/t milled $10.80 $8.21 Processing $/t milled $6.58 $5.00 G&A $/t milled $1.36 $1.04 TSF $/t milled $0.17 $0.13 Water treatment $/t milled $0.47 $0.36 Total $/t milled $19.38 $14.73 Select Operational and Cost Metrics Yrs 1-6 L
Slide 34: Capital Cost Breakdown
C$M US$M Overall Site $26 $19 Open Pit Mining $73 $56 Ore Handling $34 $26 Process $125 $95 Tailings and Water Management $40 $30 Environmental Monitoring $2 $2 On-site Infrastructures $42 $32 Off-site Infrastructures $64 $49 Water treatment Plant $10 $7 TOTAL DIRECT COSTS $416 $316 Project Indirect