Spanish Mountain Gold Ltd. · TSXV:SPA

Spanish Mountain Gold — Precious Metals Summit Beaver Creek, Colorado 2026

21 slides from Spanish Mountain Gold's conference presentation, September 2026

  1. Slide 1: Corporate Presentation

    TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y Spanish Mountain Gold Ltd. Corporate Presentation Precious Metals Summit Beaver Creek, Colorado September 2026 TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y © 2026 Spanish Mountain Gold Ltd. All rights reserved.

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation under no circumstances is to be construed to be an offering of securities of the Company. Neither this presentation nor its delivery to the recipient will constitute an offer to sell, or the solicitation of an offer to buy the assets and or securities described

  3. Slide 3: Investment Highlights - Feasibility Fully Funded

    Investment Highlights - Feasibility Fully Funded Experienced Team Led by Peter Mah, CEO and Mark Ruus, CFO TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y Emerging Developer – 2026 PEA Update C$2,910M after-tax NPV5%, 35.2% IRR and 1.8-year payback at US$3,600/oz Au — vs C$1,025M, 18.2% and 3.4 years in the 20

  4. Slide 4: Spanish Mountain Gold Project - Feasibility Stage

    Spanish Mountain Gold Project - Feasibility Stage Three Major Gold Projects in the Cariboo Gold District Contained Au Active placer gold mining since the late 1850’s Project Tonnage Au Grade (M&I) Spanish Mtn Gold Project1 342.1 Mt 0.42 g/t 4.7 Moz Favorable Tier 1 Jurisdiction TSX-V: SPA | OTCQB: S

  5. Slide 5: Why Invest?

    Why Invest? ✓ Feasibility fully funded ✓ Leverage to Gold ✓ Confidence with 260 km of drilling ✓ De-risked tailings & water management TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y GOLD FEASIBILITY MINERALIZATION SUSTAINABILITY LEVERAGE UNDERWAY GROWTH EXCELLENCE • M&I resource based on Feasibility study Dri

  6. Slide 6: Capital Markets Summary

    Capital Markets Summary Share Price & Volume (Last 12 Months) $0.45 Volume in Millions 4.5 Share Price (C$) Capital Structure Overview Analyst Coverage $0.40 4.0 $0.35 3.5 Share Price (C$) Volume (millions) $0.30 3.0 Tickers TSXV: SPA OTCQB: SPAUF $0.25 2.5 TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y FSE:

  7. Slide 7: Board & Management Team

    Board & Management Team Highly experienced team with decades of innovative mining, exploration, development & operational expertise. TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y Brent Bergeron Lembit Janes Richard Orazietti Garnet Dawson Chair & Director, M.A. (Economics) Director, MBA Director, MBA, CPA, B

  8. Slide 8: Resource Growth Potential

    Resource Growth Potential Spanish Mountain Gold Project — Mineral Resource Estimate1 2026 M&I RESOURCE (UPDATED) Area Classification Tonnes (Mt) Au (g/t) Au (koz) 4.66 Moz Au Main Measured 111.4 0.51 1,831 TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y Main Indicated 230.6 0.38 2,832 Main M&I 342.0 0.42 4,663

  9. Slide 9: 2026 PEA Update — Results Summary

    2026 PEA Update — Results Summary Base case US$3,600/oz Au, US$50/oz Ag | Spot case US$4,400/oz Au, US$66/oz Ag | US$ unless noted (US$1.00 = C$1.35) Metric First 5 Years LOM — Base Case Spot Case ALL-IN SUSTAINING COST (AISC) Avg Annual Au Production (koz) 207 129 129 AISC, net of by-product (US$/o

  10. Slide 10: PEA Value Creation Potential

    PEA Value Creation Potential Study-Over-Study Improvement Value Uplift: 2025 PEA vs. 2026 PEA Update Metric 2025 PEA 2026 PEA Update After-Tax NPV5% (C$ Millions) Mine Life (years) 24.5 25.8 (+1.3 yrs) TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y 4,242 Throughput (tpd) 26,000 31,000 (+19%) 2,910 Strip Ratio

  11. Slide 11: Attractive Positioning vs Peers

    Attractive Positioning vs Peers Spanish Mountain 2026 PEA base case US$3,600/oz Au Production Scale & Operating Cost Mine Life & Strip Ratio 400 $1,800 30 10.0 351 $1,537 $1,566 $1,600 25.8 9.0 350 8.0 TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y 25 8.0 $1,400 22.0 300 281 275 273 $1,185 7.0 $1,098 $1,200 2

  12. Slide 12: Process Plant Improvements

    Process Plant Improvements Flowsheet optimization — coarse particle flotation and clean gangue rejection ahead of conventional flotation and leaching 2.1× FEED GRADE UPLIFT AHEAD OF ROUGHER FLOTATION Mine Plan Summary - Mill Feed & Grade Profile Direct mill feed and stockpile reclaim (tonnes) with m

  13. Slide 13: 2026 to 2027 Plan and Catalysts

    2026 to 2027 Plan and Catalysts Workstream Roadmap ✓ Feasibility study underway, funded Workstream H2 2026 H1 2027 H2 2027 by Wheaton NSR proceeds TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y Resource & Exploration Drilling 60,000 m program complete (Q4 Assay follow-up & MRE Next drill phase scoping ✓ Rerat

  14. Slide 14: Feasibility Drilling

    Feasibility Drilling N 60,000 m program ~ 50% complete Proposed Condemnation DH 2024 Drilling TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y ondemnation 2025 Winter Drilling 2025 Fall Drilling BGC Sonic (with HQ3 drilling finish for rock mechanics) BGC HQ3 drilling for rock mechanics for open pit stability ai

  15. Slide 15: Orca Fault Target: Long Section

    Orca Fault Target: Long Section Composites 25-DH-1316 > 1.00 g/t Au 75.71m @ 0.73 Au g/t > 0.70 g/t Au 25-DH-1322 133.57 m @ 1.35 Au g/t TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y incl. 25.47 m @ 4.28 g/t 25-DH-1292 112.00m @ 0.77 Au g/t 26-DH-1337 incl. 41.00 @ 0.98 g/t 116.80 m @ 1.20 Au g/t 25-DH-1293

  16. Slide 16: Highlights & H1 2028 Build Decision

    Highlights & H1 2028 Build Decision TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y PLAN CATALYSTS NEXT STEPS STRATEGY NEW VISION NEXT STEPS • Feasibility Study ✓ 60 km Drilling – • FS Drilling Build the Next Gold Complete Q4 2026 Mine In BC’s Cariboo • Advance Aggressively • Tradeoffs To Build Decision • Dril

  17. Slide 17: Subscribe for Updates

    Subscribe for Updates Peter Mah Scan the QR code to sign up for emails President & CEO Investor Relations (604) 398-4377 info@spanishmountaingold.com info@spanishmountaingold.com spanishmountaingold.com TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y 17

  18. Slide 18: Appendix

    Appendix TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y 18

  19. Slide 19: Updated 2026 MRE

    19 Updated 2026 MRE Spanish Mountain Project NI 43-101 Mineral Resource Estimate • Incorporates 2024–2026 drilling; Area Classification Cut off Tonnes Gold Contained Silver Contained 2026 FS program 31,587 m (g/t Au) (Mt) (g/t) Gold (koz) (g/t) Silver (koz) complete of 60,000 m planned Measured 111.

  20. Slide 20: Property size over 10,000 Hectares

    Property size over 10,000 Hectares 100% SMG Owned Mineral Claims • Deposit measures approximately 1,800x TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y 800m • Prospective argillite units of the Nicola Group cover a strike length of over 12km • Potential for critical metals includes the Cedar Creek and Nina La

  21. Slide 21: Orca Fault Target: Expansion Potential

    Orca Fault Target: Expansion Potential ORCA Fault NE Controls Base of Base of TSX-V: SPA | OTCQB: SPAUF | FSE: S3Y Y10 LOM Y10 LOM Orca F. Target Orca Targets Expansion Targets Indicated Resources Measured Resources Plan view of the 2025 Resource Block Model of the Main Deposit colored by Au grade (

Spanish Mountain Gold — Precious Metals Summit Beaver Creek, Colorado 2026 on 6ix