Moho Resources Ltd. · ASX:MOH
Moho Resources — AMEC Investor Presentation November 2020
17 slides from Moho Resources's conference presentation, Nov 23, 2020
Slide 1: AMEC Investor Presentation – November 2020
For personal use only THE MOHOROVICIC DISCONTINUITY: THE BOUNDARY SEPARATING THE CRUST & MANTLE OF THE EARTH ACROSS WHICH SEISMIC WAVES CHANGE VELOCITIES AMEC INVESTOR PRESENTATION – November 2020
Slide 2: Disclaimer
This presentation is not a prospectus nor an offer or inducement to subscribe for shares in Moho Resources Ltd (Moho) and has not been lodged with the Australian Securities and Investments Commission. Except for any liability which cannot be excluded by law, Moho and its affiliates expressly For per
Slide 3: Key Objectives
For personal use only KEY OBJECTIVIES • Increase share price through successful exploration • Maximise shareholder value through early stage cashflow generation • Minimise shareholder dilution by becoming a self-funded explorer
Slide 4: Tight Capital Structure
TIGHT CAPITAL STRUCTURE For personal use only SHARES OPTIONS 75M 27M On Issue (100%)* (100%)**** Share Price $0.115** Option Price $0.035*** Market Cap ~ $8.6M Top 20 ~33% *Total number at COB 19 Nov 2020 **Share price at COB 19 Nov 2020 ***Option price at COB 19 Nov 2020 ****Options include directo
Slide 5: Experienced Board & Technical Team
For personal use only EXPERIENCED BOARD & TECHNICAL TEAM • DIRECTORS • Terry Streeter (Non-Exec Chairman) • Shane Sadleir (Managing Director) - Geoscientist • Ralph Winter (Commercial Director) – Corporate • Adrian Larking (Non-Exec Director) - Geologist & Lawyer • TECHNICAL TEAM • Robert (Bob) Affl
Slide 6: Window of Opportunity
For personal use only WINDOW OF OPPORTUNITY • current high gold price (~A$2,570/oz) • granted mining tenements prospective for gold mineralisation • proximity to existing gold mining infrastructure and toll treatment facilities • mining-friendly government and community in WA 6
Slide 7: Projects
For personal use only PROJECTS • Focus on Gold in WA & QLD • Exposure to Nickel in prospective ground holdings around Poseidon’s Black Swan Nickel Operations 7
Slide 8: Empress Springs (QLD) – Au
For personal use only EMPRESS SPRINGS (QLD) – Au EXPLORING WORLD CLASS DEPOSITS MOHO’S COMPANY MAKER • Exploration for giant gold deposits under cover in virgin area • Moho discovered 3 separate mineralised areas • Moho holds most of the prospective ground (> 2,300km2 ) • 20 km south of Croydon Gold
Slide 9: Burracoppin (WA) – Au
For personal use only BURRACOPPIN (WA) - Au NEW DISCOVERY IN GREENSTONE BELT • Gold/silver mineralisation discovered by Moho in bedrock • In wheatbelt ~20km west of Edna May • On structural trend to Tampia gold deposit • Follow-up drilling planned Q1 2021 9
Slide 10: Exploring for Company Makers
For personal use only EXPLORING FOR COMPANY MAKERS HOW DO WE GET THERE? • Mining studies towards gold production potential at 100% owned East Sampson Dam • Ramping up resource definition drilling at East Sampson Dam • Exploration drilling planned for additional resources at Silver Swan North project
Slide 11: Silver Swan North Gold Project (WA)
SILVER SWAN NORTH For personal use only GOLD PROJECT (WA) NEAR KALGOORLIE • Potential for early stage cashflow • Extensive Land holding ~102km2 (100% ownership) • Gold mineralisation at East Sampson Dam • High grade gold intersections on granted mining lease • Close proximity to mining infrastructur
Slide 12: Ideally Located to Mining Infrastructure
IDEALLY LOCATED TO For personal use only MINING INFRASTRUCTURE • 50km from Australia’s gold mining capital at Kalgoorlie • 11 gold processing plants within 100km • Abundance of mining infrastructure, skills and services 12
Slide 13: Exploration Prioritised Towards Early Gold Production
For personal use only EXPLORATION PRIORITISED TOWARDS EARLY GOLD PRODUCTION • Infill RC and diamond drill programs for maiden JORC 11km Resource and Scoping Study at East Sampson Dam (ESD) within granted mining lease M27/263 • Aircore drilling to test gold auger anomalies on M27/263 over 2.5km • Sur
Slide 14: High Grade Results at ESD
HIGH GRADE RESULTS AT ESD NOV 20* For personal use only • SSMH0095: 2m @ 18.0 g/t Au from 105m, incl. 1m @ 34.8 g/t Au from 106m • SSMH0097: 6m @ 5.63 g/t Au from 18m, incl. 1m @ 16.2 g/t Au from 19m & 1m @ 13.5 g/t Au from 23m HIGH GRADE RESULTS AT ESD FEB 20** • SSMH0051: 15m @ 4.71 g/t Au from 88
Slide 15: Gold Mining Investigations Underway
GOLD MINING For personal use only INVESTIGATIONS UNDERWAY • Excellent preliminary metallurgical results & Phase 1 RC drilling completed – Aug 2020 • Flora and Fauna survey completed - no environmental impediments identified • Aboriginal heritage survey completed – no sites of cultural or archaeologi
Slide 16: Upcoming Newsflow
UPCOMING NEWSFLOW For personal use only Diamond • Remaining 5 holes Completed Drilling ESD Results Expected Dec 20 Dec20 • 40 holes planned for Dec 20 RC Drilling ESD Results expected Jan 21 Jan21 RC & Diamond • Planned for Jan21 Drilling BCN Results expected Feb21 Preliminary Feb21 • Expected Feb/M
Slide 17: On Track to Become Self-Funded Explorer and Producer
ON TRACK TO BECOME For personal use only SELF-FUNDED EXPLORER AND PRODUCER Cashflow from East Sampson Dam gold production will enable exploration at company maker gold deposits – Empress Springs & Burracoppin 17
Moho Resources — AMEC Investor Presentation November 2020 on 6ix