Slide 1: Moho Resources Ltd - 121 Investor Presentation March 2022
MOHO RESOURCES LTD EXPLORING FOR A GREENER FUTURE GEARING UP FOR EXPLORATION SUCCESS 121 INVESTOR PRESENTATION MARCH 2022
Slide 2: Disclaimer and Competent Persons Statements
DISCLAIMER This presentation is not a prospectus nor an offer or inducement to subscribe for shares in Moho Resources Ltd (Moho) and has not been lodged with the Australian Securities and Investments Commission. Except for any liability which cannot be excluded by law, Moho and its affiliates expres
Slide 3: 3 Year Share Graph and Top 20 Holders
3 YEAR SHARE GRAPH Top 20 Holders MOH:ASX Should have market cap here as well 32% $0.055 (AUD) OPTIONS:ASX $0.006 (AUD) At close of trade 21 Mar 2022 SHARES ON ISSUE OPTIONS ON ISSUE MARKET CAP * Includes 30.6M listed options (MOHO) with $0.25 130M 84M ~$7M exercise price and 9/7/23 expiry, 24M unli
Slide 4: Board & Technical Team
BOARD & TECHNICAL TEAM Technical Team Grant Alan “ROCKY” Osborne – 42 years experience responsible for the discovery of the Rocky’s Reward nickel mine in WA and the C2C Zn, Cu, Ag deposit in Brazil. Principal consultant with Terry Streeter Ralph Winter Adrian Larking GEOSBORNE Pty Ltd. Shane Sadleir
Slide 5: Gearing Up for Exploration Success
GEARING UP FOR EXPLORATION SUCCESS Silver Swan North (WA) Nickel/Gold Project Nickel sulphide prospects around Poseidon’s Black Swan Nickel Operations East Sampson Dam gold deposit Tyrells and Hodges gold prospects Whistlepipe (WA) Ni-Cu-PGE Projects Ni-Cu-PGE prospects in South West Yilgarn Craton
Slide 6: Why Nickel?
Why Nickel?
Slide 7: Nickel Demand
NICKEL DEMAND Source: Courtesy of Wood Mackenzie – Q4 2021 Source: Courtesy of researchandmarkets.com
Slide 8: Ni-Cu-PGE Projects
Ni-Cu-PGE PROJECTS
Slide 9: Silver Swan North Nickel Sulphide Targets (WA)
PHASE 1 – NICKEL STRATEGY SILVER SWAN NORTH NICKEL SULPHIDE TARGETS (WA) Stage 1 - Omrah Target - untested EM conductor (M27/263) RC drilling completed – Awaiting Assays Diamond Tails in progress – Assays being submitted 50% of drilling under co-funded by WA government grant up to max $150,000 Stage
Slide 10: Moho Granted Tenement Adjoining Poseidon's Nickel Deposit
PHASE 1 (STAGE 3) – NICKEL STRATEGY MOHO GRANTED TENEMENT ADJOINING POSEIDON’S NICKEL DEPOSIT E27/623 granted to Moho on 14/12/21 – prospective for gold and nickel Adjoins the southern boundary of Poseidon Nickel Ltd’s Black Swan Nickel Operation Extraordinarily high grade nickel intersections repor
Slide 11: Increased Nickel Exposure at Silver Swan North (WA)
PHASE 2 – NICKEL STRATEGY INCREASED NICKEL EXPOSURE AT SILVER SWAN NORTH (WA) Moho to acquire strategic nickel rights in 20 mining tenements in deal with Yandal Resources Ltd (Yandal) Tenement package covers ~8.7km2 of prospective mafic-ultramafic stratigraphy known to host nickel sulphide mineralis
Slide 12: Whistlepipe Ni-Cu-PGE Targets (WA)
PHASE 3 – NICKEL STRATEGY WHISTELPIPE Ni-Cu-PGE TARGETS (WA) Whistlepipe – highly credentialed geologist and geophysicist associated with discovery of Gonneville PGE-Ni-Cu-Co-Au at Julimar Ni-Cu-PGE prospectivity supported using Geoscience Australia’s Mineral Potential Mapper program 12 exploration
Slide 13: Silver Swan North Gold Project
SILVER SWAN NORTH GOLD PROJECT
Slide 14: East Sampson Dam Gold Project
EAST SAMPSON DAM GOLD PROJECT M27/263 - granted Mining Lease (100% Moho ownership) Close proximity to mining infrastructure and toll milling facilities Maiden JORC resource (21,600 oz Au) at East Sampson Dam: - excellent metallurgical testwork results (95% recovery - Mineralisation open at depth and
Slide 15: Positive Aircore Gold Results at Tyrells and Hodges
POSITIVE AIRCORE GOLD RESULTS AT TYRELLS AND HODGES Multiple bedrock gold anomalies identified >800m long structurally-controlled, mineralised corridor identified at Tyrells - main bedrock anomaly located ~1km north northeast of East Sampson Dam gold deposit - Best results: - SSA0091 - 8m @ 1.05g/t
Slide 16: Burracoppin Gold Project
BURRACOPPIN GOLD PROJECT
Slide 17: Burracoppin (WA) - Au New Discovery in Greenstone Belt
BURRACOPPIN (WA) - Au NEW DISCOVERY IN GREENSTONE BELT Moho (70%) in JV with IGO Ltd; 100% Moho owned tenure on adjacent ground. ~20km west of Ramelius’ Edna May Gold operation and plant Four priority areas for further exploration including Crossroads prospect Diamond drilling at Crossroads prospect
Slide 18: Empress Springs Gold Project
EMPRESS SPRINGS GOLD PROJECT
Slide 19: Extensive Hydrogeochemical Gold Anomalism at Empress Springs
EXTENSIVE HYDROGEOCHEMICAL GOLD ANOMALISM AT EMPRESS SPRINGS Hydrogeochemical survey outcomes in collaboration with CSIRO and IGO: - strong gold anomalism identified in ~90km zone in basement across the project; new zones identified - gold anomalies within top 1% of ground water gold anomalism natio
Slide 20: Appendix
PRA RAG SAV SAD ee Lee Lee ee ae ZI V\ J\| NZ (RETR L TRL TRL Se SAYS AMS AMS AMS AS
Slide 21: East Sampson Dam Interim Mineral Resource Estimate
EAST SAMPSON DAM INTERIM MINERAL RESOURCE ESTIMATE 264,000 t @ 2.5g/t Au for 21,600 ounces Au at 0.5g/t cut-off grade1 for Interim JORC 2012 Mineral Resource Estimate (MRE) 70.2% (13,800 ounces) of MRE in Indicated category - provides scope to expedite mining at ESD Domain Class Tonnes (kt) Au g/t A