  1. Slide 1: Second Quarter 2020 Results

    Second Quarter 2020 Results August 6, 2020 – Conference Call TSX: IMG l NYSE: IAG

  2. Slide 2: Management Participants

    Management Participants • Gordon Stothart President & Chief Executive Officer • Carol Banducci Executive Vice President & Chief Financial Officer • Bruno Lemelin Senior Vice President, Operations & Projects • Craig MacDougall Senior Vice President, Exploration • Jeffery Snow Senior Vice President, B

  3. Slide 3: Cautionary Statement

    Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than s

  4. Slide 4: Technical Information and Qualified Persons

    Technical Information and Qualified Persons The mineral resource estimates contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The Qualified Person (“QP”) responsible for the review and approval o

  5. Slide 5: Highlights of the Quarter

    Highlights of the Quarter Solid Operating Cash Flow Strong Balance Sheet Position Transformational Growth with Côté Gold Project Adapting to Our New Normal with COVID-19 Reset for the Second Half 5

  6. Slide 6: Adapting to Our New Normal: COVID-19 Response

    Adapting to Our New Normal: COVID-19 Response Zero Harm© is our commitment to continually strive to reach the highest standards in human health, minimize our impact on the environment, and work co-operatively with our host communities. • COVID-19 in Q2/2020: • Essakane – shift rotation enabled follo

  7. Slide 7: Environmental, Social and Governance (ESG)

    Environmental, Social and Governance (ESG) In place since 2007 Recent highlights: Strong ESG practices • Donations to local communities in response to the global COVID-19 crisis: • Cleaning equipment and supplies (hand-washing Zero Harm stands, hand-sanitizing gel) • Protective medical equipment (ma

  8. Slide 8: 2020 Production and Cost Guidance – revised

    2020 Production and Cost Guidance – revised REFLECTING COVID-19 IMPACTS ON PRODUCTION AND COSTS REVISED GUIDANCE1 PREVIOUS GUIDANCE2 Essakane (000s oz) 350 – 370 350 – 370 Rosebel (000s oz) 210 – 230 250 – 270 Westwood (000s oz) 85 – 100 85 – 100 Total attributable production (000s oz) 645 – 700 685

  9. Slide 9: 2020 Capex Outlook - revised

    2020 Capex Outlook - revised REVISED PREVIOUS GUIDANCE Non- Non- $millions Sustaining1 Sustaining2 Total3 Sustaining1 Sustaining2 Total3 Essakane $40 $65 $105 $40 $80 $120 Rosebel $50 $40 $90 $60 $55 $115 Westwood $25 $18 $43 $25 $15 $40 $115 $123 $238 $125 $150 $275 Côté Gold - $77 $77 - $45 $45 Bo

  10. Slide 10: Catalysts - 2020 Sets Up Improved Profile for 2021

    Catalysts - 2020 Sets Up Improved Profile for 2021 2019 2020 2021* ✓ Diahka-Siribaya Updated Resource ✓ Westwood NI 43-101 o Westwood Expands Production ✓ Gosselin Zone Discovery at Côté ✓ Côté Go-ahead o Rosebel Ramp with Saramacca ✓ Essakane CIL and Heap Leach o Saramacca Full Production o Essakan

  11. Slide 11: Financial Review

    Financial Review Photo: Wärtsilä 11

  12. Slide 12: Overview

    Overview KEY NOTES • Highlights from the Quarter: • Strong operating cash flows on strong margins to gold • In Q2 and subsequently, executed favourable hedges in currency and fuel • Côté hedges on CAD$ and fuel • S&P and Moody’s credit rating agencies re-affirmed IAMGOLD’s stable outlook following C

  13. Slide 13: Summary of Second Quarter 2020 Financial Results

    Summary of Second Quarter 2020 Financial Results Q2 Q1 Q2 (In $ Millions, except per share amounts) 2020 2020 2019 Revenues1 $284.6 $274.5 $246.5 Cost of Sales $228.3 $242.6 $239.9 Gross profit $56.3 $31.9 $6.6 Adjusted net earnings (loss) 2,3 - from continuing operations $20.1 ($4.9) ($15.5) Adjust

  14. Slide 14: Maintaining a Strong Balance Sheet

    Maintaining a Strong Balance Sheet LIQUIDITY WELL ABOVE $1 BILLION Available Cash & Cash Credit Facility $500 M $832 M Equivalents1 Total Liquidity $1.3B2 Senior Notes Outstanding Short-term $6 M Coupon: 7%; Maturity: April 15, 2025 Corp Rating: B1 (Moody’s) and B+ (S&P) Investments ($400 M) 1. Excl

  15. Slide 15: Leader Among Peers: Leverage and Liquidity

    Leader Among Peers: Leverage and Liquidity FAVOURABLY POSITIONED AMONG PRODUCER PEER GROUP 1.9x 1.6x 1.5x Debt / 2021E EBITDA1,2 1.4x 1.4x Net Debt / 2021E EBITDA1,2 1.2x 1.1x 1.1x 0.9x 0.8x 0.8x 0.7x 0.7x 0.7x 0.7x 0.7x 0.4x 0.2x 0.2x 0.2x Net Net Net Cash Cash <0.1x Cash TSX:CG TSX:AGI TSX:BTO TSX

  16. Slide 16: Operations Review

    Operations Review 16

  17. Slide 17: Focus on Safety

    Focus on Safety HISTORICAL GLOBAL DART & TRI RATES PER 200,000 HOURS WORKED DART: 2020 TARGET – 0.57 2.40 TRI: 2020 TARGET – 0.94 1.98 1.81* 1.76* 1.53* 1.56 1.44* 1.44 1.18 1.13 1.06 1.06 1.00 0.87 0.93 0.85 0.64 0.68 0.66 0.53 0.53 0.51 0.39 0.30 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2

  18. Slide 18: Q2 2020 Production & Cost Summary

    Q2 2020 Production & Cost Summary Attributable Production Cost of Sales1 Total Cash Costs2 AISC2 (000s oz) ($/oz sold) ($/oz produced) ($/oz sold) Essakane (90%) 83 $1,079 $952 $1,123 Rosebel (95%) 52 $959 $896 $1,150 Westwood (100%) 20 $1,020 $968 $1,133 Total: Q2 2020 155 $1,030 $935 $1,189 1 Cost

  19. Slide 19: Essakane: Higher Grades in Quarter

    Essakane: Higher Grades in Quarter Burkina Faso (90%) Q2 NOTES Q2 2020 • Higher grade zones mined and lower capitalized waste stripping Attributable gold production (oz) 83,000 COVID-19 TCC1 $952 / oz • Improved productivity following lifting of administrative quarantine and shift AISC1 $1,123 / oz

  20. Slide 20: Rosebel: Restarted, Reset and Ramp

    Rosebel: Restarted, Reset and Ramp Suriname (95%) Q2 NOTES Q2 2020 • Suspension mid-June Attributable gold production (oz) 52,000 • Post Q2: mill online July 24; processing stockpiles and Saramacca ore • Saramacca – resumed construction activities to complete road TCC1 $896 / oz COVID-19 AISC1 $1,15

  21. Slide 21: Saramacca Construction Update

    Saramacca Construction Update Infrastructure – In Progress Mindrinetti Bridge – Complete 21

  22. Slide 22: Westwood: Back Online

    Westwood: Back Online Quebec (100%) Q2 NOTES Q2 2020 • Solid production despite April ramp up from Care & Maintenance Attributable gold production (oz) 20,000 COVID-19 TCC1 $968 / oz • Protocols working well AISC1 $1,133 / oz • Optimised throughput with Grand Duc while ramping up UG operations 2020

  23. Slide 23: Construction Review

    Construction Review This is the master for a divider page. In order to use a different photo in you presentation, copy all the elements from this page (except the logo, date and page number) and paste it onto a new “Blank” slide in your document. Insert your new picture, crop it to the same side as

  24. Slide 24: Transformational Value in Canada

    Transformational Value in Canada CÔTÉ GOLD - HIGHLIGHTS • NPV of $2.0B and IRR of 22.4% at US$1,700 / oz gold1,2 ONTARIO QUÉBEC • NPV of $1.1B and IRR of 15.3% at US$1,350 / oz gold1,2 • Annual gold production 469 koz at $693 / oz AISC, first 6 years2 • 18+ year potential mine life2 Kapuskasing Timm

  25. Slide 25: Sensitivity to Gold Price – Project Economics

    Sensitivity to Gold Price – Project Economics SIGNIFICANT LEVERAGE TO THE GOLD PRICE After-Tax Net Present Value (NPV5%) – 100% Basis1 After-Tax Internal Rate of Return (IRR) – 100% Basis1 (US$Bn) (%) Spot Gold2 Spot Gold2 $2.8 27.6% Base 25.9% $2.5 Case 24.2% $2.3 22.4% Base Case $2.0 20.5% $1.8 18

  26. Slide 26: Côté Gold – Site Preparation

    Côté Gold – Site Preparation CHESTER CAMP - 264 MAN CAMP TREE CLEARING – 456 HECTARES COMPLETED 26

  27. Slide 27: Exploration Review

    Exploration Review 27

  28. Slide 28: Comparison of Industry Reserves

    Comparison of Industry Reserves 17.9Moz 18 16.7Moz IAMGOLD P&P Reserves 14.5Moz 13 11.3Moz 10.1Moz 8.6Moz +101% Growth in Reserve Base 7.7Moz 7.8Moz 8 512Moz 87 3 422Moz (18%) Decline in Reserve Base 24 395Moz 19 78 365Moz -2 349Moz 60 75 328Moz 23 69 314Moz 17 26 65 286Moz 62 43 20 22 54 -7 19 23 3

  29. Slide 29: Westwood – Hub-and-Spoke Model

    Westwood – “Hub-and-Spoke” Model ATTRACTIVE DISTRICT EXPLORATION POTENTIAL1 THAT COULD SUPPLEMENT EXCESS MILL CAPACITY ROUYN GOLD PROJECT (UG) A B FAYOLLE PROPERTY (OP) OPTION TO ACQUIRE 100% FROM YORBEAU RESOURCES 100% ACQUIRED FROM MONARCH GOLD IN JUNE 2020 B Fayolle • 4 km south of Rouyn-Noranda

  30. Slide 30: Monster Lake & Nelligan

    Monster Lake & Nelligan NELLIGAN (75% JV INTEREST) • 15 kilometres south of Monster Lake • Exercised option to increase undivided interest to 75% (from 51%), MONSTER LAKE (Au) following completion of NI 43-101 Technical Report • Completed initial resource estimate1, comprising approximately 97 milli

  31. Slide 31: Exploration Potential at Côté

    Exploration Potential at Côté GOSSELIN, YOUNG-SHANNON 1.5 KM NORTHEAST OF CÔTÉ Gosselin Drill Hole Highlights1 • GOS19-17: 342.5 metres grading 0.98 g/t Au • includes: 225.0 metres grading 1.34 g/t Au • GOS19-24: 412.0 metres grading 1.28 g/t Au • includes: 221.4 metres grading 1.47 g/t Au CONCEPTUA

  32. Slide 32: Bambouk District: Boto – Karita – Diakha-Siribaya

    Bambouk District: Boto – Karita – Diakha-Siribaya BOTO GOLD PROJECT, SENEGAL Gold Price After-tax NPV 6%1 After-tax IRR1 (US$/oz) (US$M) (%) • Announced the receipt of the $2,000 $732 55% exploitation permit for an initial period $1,800 $572 45% of 20 years. $1,500 $329 30% • Optimization Study1 com

  33. Slide 33: Re-seeding the Pipeline

    Re-seeding the Pipeline West Africa North America South America Fala/Fala E Grand Duc Saramacca >5 Moz Au Production >2 Moz Au <2 Moz Au Côté Construction Brownfield Advanced Greenfield Greenfield Boto Feasibility Study Diakha-Siribaya Monster Lake Saõ Sebastiaõ Initial Resource / Gossey Nelligan Ea

  34. Slide 34: Geographically Balanced, Lower Cost, Operational Flexibility

    Geographically Balanced, Lower Cost, Operational Flexibility GOALS: STRATEGIC FOCUS: • Lower consolidated costs / increase margins • Achieve self-funding at each operating site • Increase gold production • Sequence development of organic growth projects • Increase operational flexibility • Commence

  35. Slide 35: IAMGOLD – Building a Cash Flow Pipeline

    IAMGOLD – Building a Cash Flow Pipeline Our vision is to be the global leader in generating superior value for our stakeholders through accountable mining. CREATING DIVERSIFYING MAINTAINING ENSURING superior our a strong a robust stakeholder value portfolio balance sheet pipeline • Operational • Reg

  36. Slide 36: Appendix

    Appendix # IAMGOLD 36

  37. Slide 37: Reducing Input Exposure Through Hedging

    Reducing Input Exposure Through Hedging 2020 2021 2022 2023 Foreign Currency1 Canadian dollar contracts (millions of C$) 135 252 210 120 Rate range2 ($/C$) 1.30 – 1.40 1.30 – 1.47 1.30 – 1.48 1.30 – 1.46 Hedge ratio 94% 81% 65% 36% Commodities1,3 Brent oil contracts (barrels)4 291 588 520 170 Contra

  38. Slide 38: Investor Relations Contacts

    Indi Gopinathan, VP, Investor Relations & Corporate Communications 416-388-6883 Philip Rabenok, Senior Analyst, Investor Relations 647-967-9942