Iamgold Corporation · TSX:IMG

Iamgold — Corporate Update (June 2026)

52 slides from Iamgold's corporate update, June 2026

  1. Slide 1: Côté Gold Mine Investor Tour

    CÔTÉ GOLD MINE INVESTOR TOUR June 2026 1

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT All information included or incorporated by reference in this presentation, including any information as to the Company’s vision, strategy, future financial or operating performance and other statements that express management’s expectations or estimates of future performance or

  3. Slide 3: Cautionary Statement

    CAUTIONARY STATEMENT CAUTIONARY NOTE TO U .S . INVESTORS REGARDING DISCLOSURE OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES The mineral resource and reserve estimates contained in this presentation have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Min

  4. Slide 4: IAMGOLD & Côté Gold Team

    IAMGOLD & CÔTÉ GOLD TEAM Renaud Adams • 30+ years of experience in global mining Maarten Theunissen • Chartered Accountant with 18+ years of President & CEO experience in senior executive positions and CFO experience in the mining industry, including (With IMG since 2023) mining operations located i

  5. Slide 5: Operations Overview

    OPERATIONS OVERVIEW Operating Advanced Exploration CÔTÉ GOLD1 Ontario, Canada (70% IMG | 30% SMM1) NELLIGAN MINING COMPLEX5 Start-up 2024 Quebec, Canada (100% IMG) Mine type Open pit Estimated mine life ~2041+ Status Pre-production (70%) 270,000 – 310,000 oz Deposit type Open pit/Sat. UG (100%) 390,

  6. Slide 6: Côté Gold Mine

    wy COTE.GOLD MINE Fa

  7. Slide 7: Côté Gold Highlights

    CÔTÉ GOLD HIGHLIGHTS One of Canada’s largest gold mines A flagship long-life operation in a top-tier mining jurisdiction 20M+ Ounces Resource Base Current Mineral Resources of 20.3 Moz M&I and 3.5 Moz Inf. with expansion potential >$580M Attributable Free Cash Flow in 2026 Operations expected to imp

  8. Slide 8: Côté Gold

    C Ô T É GOLD Ownership: 70:30 IAMGOLD & SMM Location: Ontario – 125 km SW of Timmins, 175 km N of Sudbury Acquisition: • Acquired in April 2012 for $505 M from Trelawney Mining • Mineral Resources: 0.9 Moz Indicated and 5.9 Moz Inferred • Sumitomo acquired 30% undivided participating interest for $1

  9. Slide 9: Côté Gold: Large-Scale and Long-Life Mine

    C Ô T É GOLD: LARGE -SCALE AND LONG -LIFE MINE Mines acquired in last 15 years TOP 12 GOLD MINES IN CANADA BY PRODUCTION1 M&I Mineral Resources 2 (inclusive of reserves) (koz ) 715 36 590 485 3 4 440 438 4 390 340 18 300 280 240 230 13 215 12 8 6 6 5 4 3 1 3 Detour Lake Malartic Meadowbank Côté Gold

  10. Slide 10: Q1 2026 Operating Results

    Q1 2026 OPERATING RESULTS 2026 (100% basis, unless otherwise stated) Q1 2026 Q1 2025 2025 Guidance Q1 OVERVIEW Ore mined kt 3,553 3,115 14,640 • Production (70%): 52,300 oz | (100%): 74,700 oz Grade mined g/t 0.99 0.78 0.94 MINING Material mined – total kt 9,326 10,755 45,108 ~52,000 • Total tonnes

  11. Slide 11: Q1 2026 Cost & Outlook

    Q1 2026 COST & OUTLOOK OUTLOOK COSTS Attr . 2025 2026 Guidance • Cash costs1 (excluding royalties) of $1,369/oz, cash costs1 of $1,704/oz (100%) 399,800 390,000 – 440,000 & AISC1 of $2,109/oz in Q1 Production oz (70%) 279,900 270,000 – 310,000 • Mining and processing cost improvement plan: Cash cost

  12. Slide 12: Site Tour Agenda

    SITE TOUR AGENDA TIME​ EVENT​ 05:45 Bus departure – boxed breakfast on the bus 08:00​ Arrival at Côté, PPE pick-up, safety induction at PCC Tour * Open Pit IOC Control Room 08:30 – Truck Shop Processing Plant ​11:30 TMF 11:30​ Remove PPE at Main Camp 12:30 Lunch at Main Camp 13:00 Depart for Timmins

  13. Slide 13: Site layout map

    Oshki Lake Overburden Stockpile Mine Rock Area Côté Lake Open Pit Clam Lake Primary & Little Clam Secondary Lake Crusher Processing Plant Ore Stockpiles Geoplex Truck Shop Office Complex NORTH

  14. Slide 14: Tailings Management Facility site layout

    Tailings Management Facility Clam Lake Little Clam Lake Processing Plant Assay Lab Bagsverd Lake Primary & Office Complex Secondary Crusher Open Pit Truck Shop NORTH

  15. Slide 15: Life of Mine to Date Operating Results

    LIFE OF MINE TO DATE OPERATING RESULTS MINING & STRIP RATIO THROUGHPUT & GRADE 12 3.0 3.0 1.50 2.5 1.25 8 2.0 2.0 1.00 M tonnes M tonnes Strip ratio g/t 1.5 0.75 4 1.0 1.0 0.50 0.5 0.25 0 0.0 0.0 0.00 Q1/24 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q3/25 Q4/25 Q1/26 Q1/24 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q3/25 Q4/

  16. Slide 16: Cost Categories

    COST CATEGORIES Mining 1 Milling 1 G&A 1 Maintenance Contractor - Other Other and Supplies Insurance Energy Costs G&A, Rentals 5% Energy Costs 4% Crushing 6% 3% Maintenance 4% 4% 7% 17% and Supplies Consumable 25% Consulting Costs Fees Labour Costs 13% 5% 11% Contractor - G&A Costs Maintenance 6% Co

  17. Slide 17: Consolidated Resource

    CONSOLIDATED RESOURCE • Updated Mineral Resource estimate reflects integration of the Côté and Gosselin zones into a consolidated block model • Incorporated interconnecting saddle area between Côté and Gosselin • Gold price of $2,500 per ounce (up from $2,100/oz for Côté and $2,500/oz for Gosselin)

  18. Slide 18: Consolidated Resource

    CONSOLIDATED RESOURCE CÔTÉ ZONE - MINERAL RESERVE ESTIMATE CÔTÉ & GOSSELIN CONSOLIDATED MINERAL RESOURCE ESTIMATE Tonnes Grade Ounces Tonnes Grade Ounces (as of Dec 31, 2025) (000’s) (g/t) (000’s) (as of Mar 31, 2026) (000’s) (g/t) (000’s) Proven & Probable: Côté 217,167 1.01 7,041 Measured 164,364

  19. Slide 19: Côté Expansion Opportunity

    CÔTÉ EXPANSION OPPORTUNITY INCREASED SCOPE AND SCALE CONCEPTUAL DIAGRAM OF CÔTÉ AND GOSSELIN PITS • Expansion technical report and mine plan to be released in Q4 2026 • Conceptual plan to expand Côté plant from 36,000 tpd to 50,000+ tpd targeting subset of consolidated Côté and Gosselin model with M

  20. Slide 20: Reconciliation

    RECONCILIATION 2025 Last 6-months F1 F1.5 F2 Factor Tonnes Grade Ounces Factor Tonnes Grade Ounces F1 -3% -5% -8% F1 -2% -7% -9% Reserves Final F1.5 6% -2% 5% F1.5 5% 0% 6% Production Mill Feed Model Design F2 -3% 6% 3% F2 -2% 8% 6% F3 F3 1% -1% -1% F3 1% 1% 2% EXCELLENT RECONCILIATION BETWEEN GEOLO

  21. Slide 21: Overview of Operations

    OVERVIEW OF OPERATIONS Mining progress: Over 111 MT of rock mined, with 33MT of 1 ore and 78Mt of Waste. Over 1,591km of drilling, and 35,144,000 kg of explosives Tailings 5 blasted. 6 Management Processing 4 Sequence Update: Facility Plant Polishing Mining started at 382mL and Ore 7 progressed to 2

  22. Slide 22: Mining

    IAMGOLD | febEsinen.

  23. Slide 23: Autonomous Operations

    AUTONOMOUS OPERATIONS AUTONOMOUS EQUIPMENT Côté Gold utilizes autonomous haulage and drilling with primary equipment: • 20 autonomous CAT 793F haul trucks – will have 24 by year end. • 2 CAT 6060E electric shovels • 4 CAT 994/5K front-end loaders • Viper 231 autonomous drills Autonomous fleet is con

  24. Slide 24: Material Movement

    MATERIAL MOVEMENT Phase 1 Phase 3 MINING OPERATIONS (100% basis, unless Q1 Q2 Q3 Q4 Q1 otherwise stated) 2025 2025 2025 2025 2026 Tonnes mined – Waste kt 7,789 8,638 7,585 6,574 5,773 Tonnes mined – Ore kt 3,115 3,170 3,848 4,491 3,553 Phase 2 Phase 4 Material mined – total kt 10,904 11,816 11,433 1

  25. Slide 25: Mining Performance

    MINING PERFORMANCE DRILLING 5 – Pit Vipers and 5 – D65s • Fleet availability continuing to improve with significant uplift through Q1 2026 • Additional D65 drills added to fleet to meet pre-shear requirements BLASTING • Ongoing collaborative relationship with explosives vendor for improved performan

  26. Slide 26: Processing

    PROCESSING

  27. Slide 27: Côté Primary and Secondary Crushing Circuits

    CÔTÉ PRIMARY AND SECONDARY CRUSHING CIRCUITS Lime Silo Screening Building Fire Water Systems Coarse Ore Dome Fine Ore Bin Secondary Crushers Primary Crusher HPGR 27

  28. Slide 28: Côté Processing Plant

    CÔTÉ PROCESSING PLANT Pre-leachO2 Storage & From Primary & Secondary Thickener Distribution Process Water Secondary Tank Leach Tanks(10) Crushing Cyclones 30 hrs Ball Mill Cyclones Cyanide Tailings Destruction Thickener SO2 Ball Mill Tailings Pump Verti-Mills (2) CIP Tanks (8) Refinery ADR Cyanide M

  29. Slide 29: Côté Processing Flowsheet

    CÔTÉ PROCESSING FLOWSHEET KEY COMPONENTS Dry side 1 1 Traditional primary/secondary crushing 6 • Additional secondary cone crusher commissioned Dec 2025 2 Primary conveyor CV-10 2 3 Coarse ore stockpile in covered dome 3 4 HPGR crushing in tertiary stage Two stages of grinding: 5 5 Ball mill 6 Verti

  30. Slide 30: Processing Plant

    PROCESSING PLANT RAMP UP OBSERVATIONS MILLING OPERATIONS ✓ Capacity Management: Plant demonstrated early the ability to Q1 Q2 Q3 Q4 Q1 (100% basis, unless operate at or above nameplate throughput rates, increasing otherwise stated) 2025 2025 2025 2025 2026 availability was priority Ore milled kt 2,0

  31. Slide 31: Tailings Management Facility

    TAILINGS MANAGEMENT FACILITY DESIGN • 203 Mt tailings (233 Mt design requires +5 m raise) • Updated mine plan investigating expansion potential of current facility • TMF is closed circuit with tailings water and seepage captured and re- circulated to mill • Tailings are non-acid generating rock and

  32. Slide 32: Exploration

    EXPLORATION

  33. Slide 33: Côté District - Regional Land Holding Tenures

    Côté District - Regional Land Holding Tenures Summary Mineral potential Potential for Côté-style tonalite & diorite hosted Breccia zones (Clam Lake ext. & Gosselin-Jack Rabbit ext.) North TMF Option North TMF Exploration Potential for Syenite intrusion or shear Expansion zone hosted gold zones – Mos

  34. Slide 34: Chester Central Area – Exploration Potential

    Chester Central Area – Exploration Potential North TMF Option TMF + Exp N MRA Exp. E MRA Exp. S Exploration Target Areas Potential for Côté-style tonalite & diorite hosted Breccia zones: Targets of 1st Priority - Major Gold Trend - Best potential in Côté-Gosselin Trend and Clam Lake ext. & Gosselin-

  35. Slide 35: Gosselin Deposit ~8 Years Ago

    GOSSELIN DEPOSIT ~8 YEARS AGO From the May 31st 2018, exploration weekly report 2018 • CD18-024 returned a broad 231 m of 0.62 g/t Au, indicating persistent low-grade mineralization at depth. • The intersection lies ~330m below the Young-Shannon trend, suggesting a deeper, continuous gold system. •

  36. Slide 36: Chester Regional Exploration - Structural Corridor Theory

    CHESTER REGIONAL EXPLORATION - STRUCTURAL CORRIDOR THEORY Hydrothermal breccia Jack Rabbit Diorite breccia Silica +/- albite alteration Gosselin Deposit Côté Gold Clam Lake 1. Footnote 2. Footnote 2 36 36

  37. Slide 37: Long Section – Looking South

    37 LONG SECTION – LOOKING SOUTH JACK RABBIT GOSSELIN CÔTÉ GOLD Zone No. 2 Zone No. 1 Zone No. 3 390 250 TARGET AREA Previous Diamond Drilling o Tightly clustered o Depth of testing mostly above 250m vertical o Narrow corridors of testing (<200m wide) along strike from structurally hosted high-grade

  38. Slide 38: Priority 2026 - Change of Focus

    3 Priority 2026 - Change of Focus Priority focus now outside of the mine leases Swayze (TAAC) West Move to underexplored areas of UJV property Prospective Au occurrences / depositional settings North Shore Jerome North TMF Option Jack Rabbit Watershed TMF + Exp N MRA Exp. MRA E Exp. S Expansion and

  39. Slide 39: Swayze West Regional Exploration – Jérôme Deposit

    39 SWAYZE WEST REGIONAL EXPLORATION – JÉRÔME DEPOSIT • Jérôme Au – Ag Deposit hosted in veins along structural Temiskaming Sediments / Porphyry contact on 25 km strike porphyry / sediment contact • Milled grade 5.82 g/t Au (56,878 oz and 1.55 g/t Ag). Au – Ag – Mo association. • Deposit Model : Youn

  40. Slide 40: Responsibility and Community

    RESPONSIBILITY AND COMMUNITY A sustainable and positive legacy 40

  41. Slide 41: Health & Safety: A Core Focus

    HEALTH & SAFETY: A CORE FOCUS 2024 Achievements • Updated state of the art Occupational Health Centre & Staffing • Implementation of Alcohol & Drug program site wide • Implementation of Industrial Hygiene programs 2025 Achievements • Continued to decrease injury rates (0 LTI since Oct 2024) • Functi

  42. Slide 42: Communities

    COMMUNITIES We have two Impact Benefit Agreements with Côté in the Community Indigenous partners: Sponsorships Donations Community Investments 1. First Nation Partners IBA with Mattagami Côté Gold's Community Benefits program First Nation and Flying Post First Nation, supports sustainable developmen

  43. Slide 43: Employment

    EMPLOYMENT There are currently 263 employees from Greater Sudbury + Timmins areas • Equipment Operation: 69 • Trades/Apprentices/labourer: 40 • Engineers/Specialists/Technologist: 25 • Leadership: 33 • Geology: 12 • Supply Chain: 11 • Finance: 10 • IT: 8 • Safety & Environment: 10 • HR & Communicati

  44. Slide 44: 2025 Procurement

    2025 PROCUREMENT USA, 3% Europe, 1% Other, 0.27% Southern Ontario, 15% Côté Gold 2025 Operating costs: $361 million Canada, 23% Capital expenditures: Northern Ontario, $127 million 58% 44 Procurement from September 2024 to September 2025

  45. Slide 45: Environment

    ENVIRONMENT Water Quality Monitoring •Surface Water Monitoring 432 •Lake Monitoring Surface Water Samples •Hydrometric Monitoring collected in 2025 •Potential Acid Generating (PAG) Cell Monitoring •Compliance and Due Diligence Monitoring •Groundwater Monitoring Biodiversity Monitoring 295 •Breeding

  46. Slide 46: Fisheries Offsetting: Oshki Lake

    FISHERIES OFFSETTING: OSHKI LAKE Open Pit footprint Water Ceremony Oshki Lake, June 2024 46

  47. Slide 47: Fisheries Offsetting: Middle Three Duck Lake Extension

    FISHERIES OFFSETTING: MIDDLE THREE DUCK LAKE EXTENSION ~111,610 m2 / 27 acres of newly constructed fish habitat 47

  48. Slide 48: Appendix

    IAMGOLD | Ese.

  49. Slide 49: Gold Mineral Reserves – 100% Basis

    1,2,3 GOLD MINERAL RESERVES – 100% BASIS As of December 31, 2025 PROVEN PROBABLE P+P MINERAL RESERVES Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces DEPOSIT Type* Location Ownership (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) Côté Gold3 OP Canada 70% 116,055 1.05 3

  50. Slide 50: Gold Mineral Resources – 100% Basis

    1,2,3,4,5 GOLD MINERAL RESOURCES – 100% BASIS MEASURED INDICATED MEASURED + INDICATED INFERRED Location Ownership Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces DEPOSIT Type* (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) Côté

  51. Slide 51: Notes

    NOTES || IAMGOLD | x88 REDEFINED.

  52. Slide 52: Graeme Jennings, VP, Business Development & IR

    GRAEME JENNINGS, VP, BUSINESS DEVELOPMENT & IR 416-388-6833 TSX: IMG | NYSE: IAG | www.iamgold.com

IAMGOLD — Corporate Update (June 2026) on 6ix