Slide 1: TVI AGM Presentation
TVI AGM Presentation June 10, 2015
Slide 2: Qualified Person Statement and Disclaimer
Qualified Person Statement and Disclaimer Qualified Person Mike Bue, Bsc. Eng, M.Eng, P.Eng, Technical Advisor and Project Advisory Group member of TVI and a member of the Professional Engineers of Ontario and Canadian Institute of Mining and Metallurgy, is the qualified person under NI43-101 who ha
Slide 3: Where we have been...
ET V7 Pacific Inc Where we have been... www.tvipacific.com 3 TSX: TVI | OTCQB: TVIPF
Slide 4: TVI – Significant Events in H2/2014-H1/2015
TVI – Significant Events in H2/2014-H1/2015 TVIRD ACTIVITIES • In July 2014, TVI completed various investment and financing transactions with Prime Resource Holding Inc. relating to TVIRD to raise total proceeds of US$10.64 million. TVI now holds a 30.66% equity interest in TVIRD and reports its int
Slide 5: TVI – Significant Events in H2/2014-H1/2015
TVI – Significant Events in H2/2014-H1/2015 CASH POSITION & NEW PROJECT OPPORTUNITIES • At the end of October 2014, TVI forms Project Advisory Group consisting of independent, seasoned mining, exploration and project assessment experts who will be assisting TVI in evaluating new opportunities in the
Slide 6: Share Price Performance
Share Price Performance Current Share Price (TSX: TVI) $0.015 Issued & Outstanding Shares 655.4 Million Market Capitalization $9.83 Million Average daily 3-month volume 83,256 6
Slide 7: State of Resource Sector
State of Resource Sector • GLD (SPDR Gold Shares) – down 21% • S&P/TSX Venture Composite – down 71% • CUPM (iPath Pure Beta Copper ETN) – down 38% • GDXJ (Junior Gold Miners ETF) – down 85% • SLX (Market Vectors Steel Index) – down 55% • NINI (iPath Bure Beta Nickel ETN) – down 55% • COPX (Global X
Slide 8: Where we are headed...
ET Pacific Inc. Where we are headed... www.tvipacific.com TSX: TVI | OTCQB: TVIPF
Slide 9: Self-Financing via TVIRD's PSE Listing
Self-Financing via TVIRD’s PSE Listing • TVIRD is currently a PRIVATE company held 30.66%* by TVI Pacific and Philippine Investment company Prime Resource Holdings. • Due to its private status, North American markets do not have a way of determining the value of TVI’s interest in TVIRD. • TVIRD has
Slide 10: TVIRD Valuation Drivers
TVIRD Valuation Drivers 1) Projected net income from laterite direct shipping ore (“DSO”) operations LUZON and increasing NI43-101 compliant resources at the Agata Nickel Laterite Project Manila 2) Receipt of DMPF approval and commencement of development at the Balabag Gold-Silver Project AGATA 3) F
Slide 11: TVIRD's Agata Nickel DSO Project
TVIRD’s Agata Nickel DSO Project • Owned by Agata Mining Venture Inc. (AMVI), a Joint Venture company in which TVIRD has a 60% interest and is the operator. • Project is located in the Surigao mining region of Mindanao and benefits from excellent location and logistics with mining areas located with
Slide 12: Philippine Nickel DSO Prices in 2014
Philippine Nickel DSO Prices in 2014 • Due to the Indonesian ban on export DSO materials, prices increased from May to July 2014. However, after reaching price record highs in June-July, all prices have decreased due to falling nickel prices, depressed iron prices (LME) and surplus inventory in Chin
Slide 13: Philippine Nickel DSO Prices in 2015
Philippine Nickel DSO Prices in 2015 Philippine NI FOB Price Chart Jan - April 2015 Philippines Ni 1.8% Fe 12-18% Philippines Ni 1.6% Fe 20-25% Philippines Ni 1.5% Fe 15-20% Philippines Ni 0.9%-1.1% Fe: 50% Philippines Ni 0.6%-0.8% Fe: 50% Philippine nickel DSO prices have tumbled even more since th
Slide 14: TVIRD's Agata Nickel Laterite Exploration
TVIRD’s Agata Nickel Laterite Exploration • Owned by Agata Mining Venture 2014/15 Exploration Program Drill Hole Map Inc. (AMVI), a Joint Venture company in which TVIRD has a 60% interest and is the operator. • From October 2014 to April 2015, TVIRD completed a 16,768-metre, 986-hole drill program t
Slide 15: TVIRD's Balabag Gold-Silver Project
TVIRD’s Balabag Gold-Silver Project • 100% owned by TVIRD. • Located in the municipality of Bayog and approx. 75 km east-northeast of TVIRD’s former flagship project, Canatuan. • Low-sulphidation epithermal gold and silver vein deposit with total of 296 holes drilled for 34,156 m since 2005. • Resou
Slide 16: TVIRD's Balabag Gold-Silver Project
TVIRD’s Balabag Gold-Silver Project An updated Declaration of Mining Project Feasibility (DMPF) was submitted to the Mines and Geosciences Bureau (MGB) in May 2013 which was returned in December 2013 with request for additional information. A formal resource study is underway and once finished, TVIR
Slide 17: TVIRD's Agata Nickel Processing Project
TVIRD’s Agata Nickel Processing Project Proposed Nickel • Owned by Agata Processing Inc. (API), a Processing JV company in which TVIRD can earn 60% Plant interest upon completion of a Definitive Feasibility Study and is operator. • Project to focus on lower limonite and Ni Laterite saprolite zones o
Slide 18: TVIRD's Agata Nickel Processing Alternative
TVIRD’s Agata Nickel Processing Alternative Direct Reduction (aka Tunnel Kiln) Technology is also being studied for the production of Sponge Nickel to process high-iron nickel ore (>50% Iron) at Agata. The option is being studied due to current low DSO prices for high-iron nickel ore. Direct reducti
Slide 19: TVIRD's Agata Limestone Project
TVIRD’s Agata Limestone Project • Owned by Agata Mining Venture Inc. (AMVI), a JV company in which TVIRD has 60% interest and is operator. • Limestone deposits are located south of the nickel laterite DSO operations and the share same infrastructure • A 17-hole drill program was carried out from Nov
Slide 20: PSE Listing Timeline Overview (2015)
PSE Listing Timeline Overview (2015) Activity Timing Broker Evaluation, Selection and Award Process – BDO Capital Completed in May Preparation and completion of Technical Reports June-July Due Diligence by BDO June – July Pre-filing with the PSE June – July Preparation of the audited June 30, 2015 I
Slide 21: Searching for our Next Success Story
Searching for our Next Success Story TVI is looking to repeat its success at Canatuan by searching for new resource opportunities in the Asia Pacific Region with the assistance of a highly experienced PROJECT ADVISORY GROUP, consisting of: Douglas J. Kirwin -- Independent consulting geologist with o
Slide 22: Resource Acquisition & Development Strategy
Resource Acquisition & Development Strategy Management’s resource acquisition and development strategy is centered around the concept of… • Acquiring or joint venturing with companies on resource deposits that may have a modest initial resource size but with the potential for significant resource gr
Slide 23: Cirianiu Gold Project, Fiji
Cirianiu Gold Project, Fiji TVI entered into a Heads of Term Agreement with Kalo Exploration Ltd. in on October 24, 2014 to conduct Stage 1 Due Diligence work before entering a possible Joint FIJI Venture agreement on the Cirianiu Gold Project in Fiji. • If a JV is established, TVI will initiate a m
Slide 24: Cirianiu Gold Project History
Cirianiu Gold Project History Gold Intercepts • Placer drilled 41 holes in 1980-90s totaling 4,194 metres and defined at least six grass-roots intermediate- to low- sulfidation epithermal gold-silver targets. • Most advanced exploration target is Gold Intercepts Qiriyaga Hill, where Placer drilled 2
Slide 25: Cirianiu Due Diligence Program
Cirianiu Due Diligence Program Since November 2014, TVI has been carrying out a detailed due diligence program at the Cirianiu project which involves resampling of drill core, assaying, geological and mine modelling, an auger soil geochemistry survey, and possible confirmatory drilling. Preliminary
Slide 26: Mining in Fiji
Mining in Fiji The Fiji Islands are located in the Southwest Pacific’s “Ring of Fire”, the active tectonic boundary between the Pacific and Indo-Australian Plates, which hosts several FIJI world-class porphyry copper-gold and epithermal gold deposits, including the following: • Emperor gold mine (ak
Slide 27: Investments in Foyson & Mindoro
Investments in Foyson & Mindoro Foyson Resources • TVI holds a 26.0% equity interest in Foyson Resource Inc., an ASX listed company which controls the Amazon Bay Iron Sands Project in Papua New Guinea. • In March 2015, Foyson concluded a binding agreement with Integrated Green Energy Pty Ltd. (“IGE”
Slide 28: Thank you...
Thank you… Corporate Head Office: TVI Pacific Inc. Suite 806, 505 – 2nd Street S.W. Calgary, Alberta T2P 1N8 Tel: (403) 265-4356 Fax: (403) 264-7028 Email: tvi-info@tvipacific.com Investor Relations/Media Contact: Shirley Anthony, VP Corporate Communications Tel: 778-999-2771 E-mail: Shirley.anthony