Geomega Resources Inc. · TSXV:GMA
Geomega Resources — Investor Presentation (October 2026)
16 slides from Geomega Resources's investor presentation, October 2026
Slide 1: Recovering critical metals from industrial residues
Recovering critical metals from industrial residues Processing technologies advancing toward demonstration, licensing and royalties Geomega Resources | TSX-V: GMA | OTC: GOMRF October 2026
Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Our presentation contains "forward-looking statements" not based on historical facts. Forward-looking statements express, as of the date of this presentation, our estimates, forecasts, projections, expectations and opinions as to future events or results. The forward looki
Slide 3: A licensing model built on three development pathways
A licensing model built on three development pathways Different applications. Different stages. One focus: monetize proprietary process know-how. TOWARDS LARGE SCALE VALIDATION DEMONSTRATION PATHWAY EARLIER-STAGE OPPORTUNITY Bauxite Residue Magnet Recycling Sulphide Tailings Rio Tinto demonstration
Slide 4: Development income today. Royalty potential tomorrow.
Development income today. Royalty potential tomorrow. Revenues will vary based on scale of application, project specifics and final terms of commercial agreements. 01 / DEVELOPMENT 02 / LICENSING 03 / DEPLOYMENT Testwork + Technology Production Engineering Transfer Royalties Technical services and p
Slide 5: Bauxite Residue - recover value while addressing a persistent liability
Bauxite Residue - recover value while addressing a persistent liability THE LIABILITY – Alkalinity + Storage 1 Land, dust and water management. Long-term closure and monitoring exposure. THE OPPORTUNITY – Multiple Products 2 Potential iron, aluminum, titanium, rare earths, scandium and gallium strea
Slide 6: One platform. Three deployment configurations.
One platform. Three deployment configurations. Sequential circuits allow refinery-specific deployment and integration. C1 / C2 / C3 / Foundation Iron Added value Alkalinity removal Iron extraction Critical minerals CLOSED-LOOP MAIN REAGENT REGENERATION OF 95% Na / Ca streams Added to C1 Added to C1
Slide 7: Broader feed testing. Validation of all circuits.
Broader feed testing. Validation of all 3 circuits. 12 Residue samples tested 8 Alumina refineries represented All 3 circuits validated in bench and pilot scale. Preliminary economics evaluated through internal engineering studies. Indicative targets based on C1+C2+C3 configuration giving <4.5 years
Slide 8: Validated by a major partner
Validated by a major partner $4.5M Total Potential Deal Value 4 years of joint validation with Rio Tinto before signing License covers Circuit 1 & 2 demonstration plant Geomega delivered all its required engineering work. Next phase is pending approvals. $1.5M received to date BAUXITE RESIDUE | CLIE
Slide 9: A feed-specific path from sample to plant
A feed-specific path from sample to plant 01 02 QUALIFY ENGINEER Representative feed. Bench testwork. Site-specific TEA. Engineering package. 03 04 DEMONSTRATE COMMERCIALIZE On-site scale-up. Product validation. Partner investment. License / royalties. BAUXITE RESIDUE | DEPLOYMENT PATHWAY
Slide 10: Magnet recycling - Saint-Hubert plant
Magnet recycling - Saint-Hubert plant Designed throughput: 1.5 tonnes/day of magnet feed – 500kg/day of REO final product FINAL INSTALLATION + INTEGRATION Commissioning to start soon Subject to remaining installation & pre-commissioning work. Authorization to operate secured through December 31, 202
Slide 11: Demonstrating the process. Building the commercial pathway.
Demonstrating the process. Building the commercial pathway. Advancing feed sourcing, product qualification and licensing discussions alongside commissioning. 01 02 FEED SOURCING PRODUCT CUSTOMERS Qualify magnet feed and secure supply terms. Demonstrate specifications and qualify oxide products. 03 0
Slide 12: Sulphide tailings – a complex feed with multiple value streams
Sulphide tailings – a complex feed with multiple value streams. TARGET METALS – Primary metal recovery 1 Feed-dependent recovery of valuable constituents (Au, Cu, Ni, etc.) IRON – DRI-grade iron oxide 2 Builds on core processing steps demonstrated in magnet recycling and bauxite residue projects. SU
Slide 13: Montviel: Strategic REE and Niobium Exposure in Québec
Montviel: Strategic REE and Niobium Exposure in Québec. A major resource with potential to benefit from Geomega’s processing technologies. The asset The work The positioning REE + niobium Technical studies Longer-term upside Strategic asset in Successfully mining-friendly A potential demonstrated at
Slide 14: An integrated laboratory and piloting platform
An integrated laboratory and piloting platform Saint-Hubert capabilities support testing, engineering and scale-up across various programs. INTEGRAT ED DEVELOPM E N T KNOW-HOW + INFRASTRUCTURE — Analytical work and feed characterization A repeatable development capability - not just a single — Bench
Slide 15: Disciplined Capital Management. Limited Dilution.
Disciplined Capital Management. Limited Dilution. C$2.49M C$6.33M Working capital Total Equity 167,128,348 s/o Corporate Structure 704,028 warrants ~5% Management, Directors and employees 11,723,017 convertible debenture ~6% Michael Gentile 9,456,750 options, DSU, RSU 40 to 50% HNWI & Family Offices
Slide 16: Multiple pathways. Multiple milestones. One scalable licensing model.
Multiple pathways. Multiple milestones. One scalable licensing model. Advancing a growing portfolio of technologies and client projects toward demonstration, commercialization and royalties. MAGNET RECYCLING BAUXITE RESIDUE SULPHIDE TAILINGS More technologies. More client opportunities. More paths t
Geomega Resources — Investor Presentation (October 2026) on 6ix