Geomega Resources Inc. · TSXV:GMA
Geomega Resources — Investor Presentation (November 2025)
24 slides from Geomega Resources's investor presentation, November 2025
Slide 1: Turning Waste Into Value
TURNING WASTE INTO VALUE Investors Presentation – November 2025 TSX-V: GMA | OTC: GOMRF
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Our presentation contains “forward-looking statements” not based on historical facts. Forward-looking statements express, as of the date of this presentation, our estimates, forecasts, projections, expectations and opinions as to future events or results. The forward lookin
Slide 3: Critical Metals Aren't Rare — They're Misplaced
CRITICAL METALS AREN’T RARE — THEY’RE MISPLACED • The world needs sustainable access to REE, iron, and aluminum • Industry generates billions of tons of residues with recoverable value • Our mission: turn industrial & mining waste streams into new resources
Slide 4: The Global Shift
THE GLOBAL SHIFT • From extraction to circular recovery • From dependency on China to sovereignty and transparency • From laboratory promise to industrial reality
Slide 5: Every Process We Design Begins With Data, Ends With Value
• Founded: 2008 • Operations: Boucherville & Saint-Hubert, Quebec • Focus: Clean-tech metallurgy & waste valorization EVERY PROCESS WE DESIGN BEGINS WITH DATA, ENDS WITH VALUE • Proprietary hydrometallurgical processes • Scalable, reagent-efficient systems • De-risked scale-up path — lab → pilot → d
Slide 6: Core Technologies
CORE TECHNOLOGIES • Iron Recovery & Valorization – transforms residue into DR-grade iron ore • Reagent Recycling – captures & purifies chemical streams for reuse at over 95% • Critical Metal Extraction & Refining – extracts REEs, Sc, Ti, Ga • Process Heat Recovery – optimizes energy recovery for pro
Slide 7: The Circular Metallurgy Engine
THE CIRCULAR METALLURGY ENGINE Every molecule reused reduces waste, cost, and carbon emissions
Slide 8: Bauxite Residue (BR) Valorization
BAUXITE RESIDUE (BR) VALORIZATION Redefining the Future of Aluminum Industry’s Largest Liability • Objective 1: Recover high purity iron, caustic soda and alumina • Objective 2: Recover REE, Sc, Ti and other critical metals • Waste reduction: Over 90% for C1, C2 and C3 combined in closed loop • Scop
Slide 9: Bauxite Residue
BAUXITE RESIDUE t REAGENT C1 Na, Ca PRODUCT > REGENERATION ps aunty» Al, Si PRODUCT l . + REAGENT > c2 > DR-GRADE IRON > REGENERATION ORE 4 Vv —p REAGENT ——p S— amreesse p MIXED REE/Sc PRODUCT REGENERATION RECOVERY TiO, PRODUCT ¢ Vv QUARTZ
Slide 10: Technology Maturity Path – Bauxite Residue Valorization
TECHNOLOGY MATURITY PATH – BAUXITE RESIDUE VALORIZATION
Slide 11: Market Opportunity
MARKET OPPORTUNITY • Targeting 10-20% of global BR annual market • Potential of up to $10M in royalties for every 1Mt processed COMMERCIAL TRACTION • Rio Tinto JDA – 1st demonstration license agreement ($4.5M) • Ongoing testwork and discussions with multiple alumina refineries
Slide 12: NdFeB Magnet Recycling
NdFeB MAGNET RECYCLING Closing the loop on magnet supply • Objective 1: Recover REE • Objective 2: Recover iron • Waste reduction: No or limited solid or liquid waste • Scope: End of life, scrap or swarf • Europe & NA: 20K tonnes production expected w/20% waste by 2030 • Value: Around $25,000 per to
Slide 13: Market Opportunity
MARKET OPPORTUNITY • RE magnets Market CAGR >8–10% • Magnet factories need local solution • End of life collections growing COMMERCIAL TRACTION • Ongoing testwork and discussions with magnet manufacturers • Growing global network of magnet scrap collectors
Slide 14: Montviel Project
MONTVIEL PROJECT • One of North America’s largest undeveloped bastnaesite REE deposits • Improved process recovers value from 40% of total ore • 95% recovery for REO and Sc • 85% recovery for Nb • High purity iron and other offtake stream • Resource: 82.4 Mt @ 1.51% TREO indicate, 184.2 Mt @ 1.43% T
Slide 15: Global Drivers
GLOBAL DRIVERS • Net-zero imperatives • Supply chain sovereignty (Canada, EU, US) • Circular economy mandates • Billions in critical minerals funding worldwide
Slide 16: Competitive Advantage
COMPETITIVE ADVANTAGE Circular Metallurgy, Proven • High efficiency process, closed-loop reagent reuse • Reagent recycling tech adaptable to several industries • Scalable deployments for customer specific needs • First mover in waste-to-value clean metallurgy • Validation via industrial partnerships
Slide 17: Scalable Revenue Model
SCALABLE REVENUE MODEL • Licensing Fees: Technology access for partners • Royalty Streams: % of production revenue • Joint Development: Funded engineering + pilot work • Government Grants: Non-dilutive financing • Operation revenues: NdFeB recycling
Slide 18: Risk & Mitigation
RISK & MITIGATION Risk Mitigation Scale-up / engineering risk: Partnered pilot + phased demo validation Feedstock availability: Establishing partnerships with alumina refiners, magnet manufactures, etc. Regulatory: Working with government critical minerals programs Market adoption: Licensing model l
Slide 19: The Growth Engine
THE GROWTH ENGINE Our greatest resource is experience and reputation in hydrometallurgy, partnerships, and execution. From Core Science to Scalable Systems • Operating analytical and piloting labs in Boucherville, QC • 15+ scientists & engineers • Healthy R&D pipeline feeding commercialization oppor
Slide 20: 2025 - 2028 Roadmap
2025 - 2028 ROADMAP QOD 202 - Rio Tinto JDA signed -Bring additional -Convert clients to sold licenses, commercial - Magnet demo plant clients to bench, pilot deployment & royalties construction and license agreements stages -Sell licenses for magnet plant -Commission and start - Bring new projects
Slide 21: Looking Ahead
LOOKING AHEAD Circularity isn’t optional. It’s inevitable. GEOMEGA turns that inevitability into opportunity
Slide 22: Join the Circle
JOIN THE CIRCLE • Partners: collaborate on demonstration & deployment • Investors: help scale Canada’s circular technologies • Governments: enable local processing sovereignty
Slide 23: Share Structure
SHARE STRUCUTRE Issued & Outstanding 160,748,007 Stock Options 6,160,000 Deferred Share Units 2,104,000 Restricted Share Units 2,616,000 Warrants ($0.40, 02/08/26) 704,028 Conv. Debt. (12%, $0.12, 03/2028) 16,431,350 Fully-Diluted 188,763,385
Slide 24: Kiril Mugerman
Kiril Mugerman President & CEO kmugerman@geomega.ca
Geomega Resources — Investor Presentation (November 2025) on 6ix