  1. Slide 1: Electric Integrated Resource Plan

    Electric Integrated Resource Plan Fifth Public Involvement Meeting November 27, 2007 PNM Alvarado Square 1

  2. Slide 2: Evelin Wheeler, Director, Integrated Resource Planning

    Evelin Wheeler Director, Integrated Resource Planning 2

  3. Slide 3: Modeling Vocabulary

    Modeling Vocabulary • Sensitivity • Scenario • Portfolio • Risk • Robust 3

  4. Slide 4: Modeling Techniques

    Modeling Techniques • Vary the sensitivities over a reasonable range • Examine multiple scenarios • Consider enough risks so that robust portfolios emerge 4

  5. Slide 5: Portfolio Generation

    Portfolio Generation Portfolio Ranking by Least Cost Low - Base High + Low Base High $8 $20 $40 Low High Load Gas Price Carbon Tax Others Portfolios sorted by cost, emissions and reliability for 5 each scenario

  6. Slide 6: Portfolios Produced

    Portfolios Produced • Up to 5,000 portfolios generated • Ordered by least cost for each scenario 6

  7. Slide 7: Portfolio Risk Analysis

    Portfolio Risk Analysis Portfolio Risk Analysis Test Top Portfolios Using Monte Carlo Carbon Tax $8 $20 $40 Load Gas Price Market 7

  8. Slide 8: Schedule

    Schedule • Review inputs by end of 2007 • Drafts for review February 2008 • Filing due date July 16, 2008 8

  9. Slide 9: Environmental Impact

    Environmental Impact Maureen Gannon Director, Environmental Services 9

  10. Slide 10: Environmental Impact Topics

    Environmental Impact Topics • Existing Impacts • Impacts of Potential New Resources • Future Regulations • Discuss Sensitivities 10

  11. Slide 11: Current Generation

    Current Generation PNM Energy by Unit Palo Verde 5% Four Corners 3% 5% 19% San Juan 1% Reeves 14% Afton New Mexico Wind 53% Energy Center Purchases 11

  12. Slide 12: Criteria Pollutants - Current

    Criteria Pollutants - Current Criteria Pollutants 6 Generation by Resource 5 4 (Environmental to Insert Graph) Carbon Monoxide lb s/M W h NOx 3 Particulate 2 SO2 1 0 Afton Palo Verde San Juan Reeves 4 Corners Plant 12

  13. Slide 13: Carbon Emissions - Current

    Carbon Emissions - Current Carbon Dioxide 1.000 Generation by Resource 0.900 0.800 Metric Tons/MWh 0.700 0.600 (Environmental to Insert Graph) 0.500 0.400 0.300 0.200 0.100 0.000 Afton Palo Verde San Juan Reeves 4 Corners Plant 13

  14. Slide 14: Freshwater Usage - Current

    Freshwater Usage - Current 0.9 0.8 0.7 0.6 gal/MWh 0.5 0.4 0.3 0.2 0.1 0 Afton San Juan Reeves 4 Corners Palo Verde Plant 14

  15. Slide 15: Future Resource Considerations - Emissions

    Future Resource Considerations- Emissions Future Fossil Technology Pollutant PC Fleet USPC IGCC NGCC NGCT NGCT Lb/MWh Average (Frame) (Aero) SO2 13 0.3-1.1 <0.1 nil <0.1 <0.1 NOx 6 0.3-0.5 <0.2 0.1 0.4 1.1 PM 1 <0.2 <0.1 nil <0.1 0.1 CO2 w/o 2250 1900 1850 800 1,300 1,300 capture CO2 with ------- 76

  16. Slide 16: Freshwater Usage - Future

    Freshwater Usage - Future 0.45 0.40 0.35 0.30 gal/MWh 0.25 0.20 0.15 0.10 0.05 0.00 Pulverized IGCC Combustion Combined Nuclear Coal Turbine Cycle (1x1) 16

  17. Slide 17: Future Resource Considerations - Emissions

    Future Resource Considerations- Emissions Future Renewable, EE, DSM Technology • Negligible air emission and freshwater usage for energy efficiency and DSM • Negligible air emission impacts for wind and solar; biomass is fuel dependent • Freshwater usage numbers for wind, solar and biomass are techn

  18. Slide 18: Impact of Future Regulations

    Impact of Future Regulations • Federal Clean Air Mercury Rule – Phase 1: 2010-2017 – Phase 2: 2018 and on • NM’s implementation of the mercury rule: Cap program with no trading • SJGS required to reduce mercury emissions – purchase of mercury allowances not an option – Phase 1 allocation – 488 lb –

  19. Slide 19: Impact of Future Regulations

    Impact of Future Regulations • EPA has proposed changes to the ozone NAAQS- if adopted these CRITERIA POLLUTANTS: could result in a number of Tightening of National counties in NM being classified as non-attainment. Ambient Air Quality • Any new or modified source in an Standards (NAAQS) ozone non-a

  20. Slide 20: Climate Change

    Climate Change Jeff Burks Director Environmental Sustainability 20

  21. Slide 21: Climate Policy Landscape

    Climate Policy Landscape • No shortage of interest in climate change regulations at state, regional and federal levels. • Governor Richardson’s Climate Change and GHG Reduction Executive Order established GHG emissions reduction goals, June 2005. • Five state Western Climate Initiative established i

  22. Slide 22: Comparison of 110th Congress Emissions Targets

    Comparison of 110th Congress Emissions targets 14000 Historical U.S. emissions (EPA, 1990-2005) Business-as-usual projection (AEO2007) Lieberman-Warner 12000 Bingaman-Specter assuming "safety valve" not hit McCain-Lieberman Sanders-Boxer / Waxman 10000 Kerry-Snowe Emissions (MMt CO2e) Olver-Gilchres

  23. Slide 23: Assessment of Climate Risk in 2008 IRP

    Assessment of Climate Risk in 2008 IRP • Timing and structure of future CO2 regulation still remains uncertain • The company will use PRC standardized carbon emissions costs in base assumptions • Carbon emissions will be priced beginning in 2010, at $8, $20, and $40 per ton escalating at 2.5% per ye

  24. Slide 24: Discussion: Environmental Impacts

    Discussion Environmental Impacts 24

  25. Slide 25: Electric Load Forecasting Scenarios

    Electric Load Forecasting Scenarios Frank Stern Principal, Summit Blue Consulting Steve Martin Sr. Economic Analyst, Modeling & Forecasting 25

  26. Slide 26: Objectives

    Objectives • Review load forecasting process • Review load characteristics • Review drivers • Discuss high/low scenarios 26 26

  27. Slide 27: Electric Load Forecasting Provides Several Outputs

    Electric Load Forecasting Provides Several Outputs • The electric load forecast provides – Energy forecast – Annual demand forecast – Hourly demand forecast 27 27

  28. Slide 28: Importance of Load Forecasting to Resource Planning

    Importance of Load Forecasting to Resource Planning • Long lead times are required to build power plants – Regulatory and environmental approval – Time to secure investment to finance construction – Time to procure equipment and construct the facility 28 28

  29. Slide 29: Energy Variation

    Energy Variation 2,000 1,800 1,600 1,400 1,200 (MW) 1,000 Energy sales and demand vary on a 800 day to day basis throughout the year. 600 400 200 0 1/1/2006 2/1/2006 3/1/2006 4/1/2006 5/1/2006 6/1/2006 7/1/2006 8/1/2006 9/1/2006 10/1/2006 11/1/2006 12/1/2006 29 29

  30. Slide 30: PNM's System Load Shape

    PNM’s System Load Shape July 17, 2006-Peak Day 2,000 1,800 1,600 1,400 1,200 (MW) 1,000 800 600 400 200 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 30 30

  31. Slide 31: PNM's System Peak Demand

    PNM’s System Peak Demand PNM's July 17, 2006 System Peak (1,855 MW) Losses, 178 Firm FERC, Residential, 499 163 TNMP (Retail), 117 Other, 13 Industrial, 169 Commercial, 715 31 31

  32. Slide 32: Increase in Residential Usage

    Increase in Residential Usage 1,200 1,000 Homes built in 2005 800 kWh 600 Homes built prior to 2002 400 Driven Drivenbyby larger homes, larger homes, manymany of 200 which areare of which using usingrefrigerated refrigerated air conditioning for cooling air conditioning for cooling 2006 billings 0 S

  33. Slide 33: PNM Retail Sales by Class

    PNM Retail Sales by Class 7,000 6,000 Forecast 5,000 Commercial (GWh) 4,000 3,000 Residential 2,000 1,000 Industrial 0 90 93 96 99 02 05 08 11 14 17 20 23 26 19 19 19 19 20 20 20 20 20 20 20 20 20 33 33

  34. Slide 34: PNM System Peak Demand

    34 (MW) 800 1,300 1,800 2,300 2,800 19 90 19 91 19 92 19 93 19 94 19 95 19 96 19 97 19 98 19 99 20 00 20 01 20 02 20 03 20 04 20 05 20 06 20 07 20 08 20 09 20 10 20 11 20 12 20 13 20 14 20 15 20 2007 Forecast 16 2008 Forecast 20 Growth Rate 2.4% 17 Growth Rate 2.2% 20 18 PNM System Peak Demand

  35. Slide 35: Total PNM Retail Sales

    Total PNM Retail Sales 12,000 11,000 2007 Forecast Growth Rate 2.4% 10,000 9,000 2008 Forecast Growth Rate 2.2% (GwH) 8,000 7,000 6,000 5,000 PNM retail sales does NOT include the former TNMP-NM sales. 4,000 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 19

  36. Slide 36: Peak Demand

    Peak Demand What contributes to peak demand increase? • Growing number of customers • Residential customer 5-yr. growth projected: 2.3% • Commercial customer 5-yr. growth projected: 1.9% • Growing use per customer • Increased size of dwellings • Increased use of electronic devices • Increased air co

  37. Slide 37: What could lead to higher usage?

    What could lead to higher usage? • Robust economy, resulting in – Continued construction of larger homes – Continued adoption of air conditioning – Increase in number of customers. • Significant adoption of plug-in hybrids • Renaissance of uranium industry 37 37

  38. Slide 38: What could lead to lower usage

    What could lead to lower usage • Slower economic growth resulting in less construction, smaller houses, less AC adoption, and erosion of manufacturing load. • Long-term drought constraining growth. • High carbon and/or energy prices depressing demand. 38 38

  39. Slide 39: Summary of Draft Scenarios

    Summary of Draft Scenarios Retail Energy Growth Sector Historical Low Growth Base Case High Growth Growth (2006-2016) (2006-2016) (2006-2016) (1996-2006) Residential 3.8% 2.6% 3.5% 4.6% Commercial 3.0% 1.4% 2.4% 3.9% Industrial 1.2% -1.2% -0.2% 0.8% Total 2.8% 1.9% 2.7% 3.7% For discussion purposes.

  40. Slide 40: Discussion: Load Forecast

    Reliability 40 Discussion Load Forecast A personal commitment to New Mexico pal