  1. Slide 1: Technology Cost and Performance Data for PNM IRP

    Technology Cost and Performance Data for PNM IRP Geothermal Discussion Office Hour Romey James Project Set Manager 178A: Energy System Technology Cost, Performance, and Technoeconomic Analysis March 4, 2026 www.epri.com www.epri.com © 2026 Electric Power Research Institute, Inc. All rights reserved.

  2. Slide 2: About EPRI

    Nonprofit Chartered to serve the public benefit, with guidance from an independent advisory council. Thought Leadership Systematically and imaginatively looking ahead to identify issues, technology gaps, and broader needs that can be ABOUT addressed by the electricity sector. Independent Objective,

  3. Slide 3: How we develop technology cost and performance data for our members' IRP and modeling efforts

    How we develop technology cost and performance data for our members’ IRP and modeling efforts ▪ Mature technologies: Independent engineering studies – EPRI contracts an EPC firm with experience developing projects of that type to build cost estimates based on current market conditions. ▪ Emerging te

  4. Slide 4: Range of Costs for Next-Generation Geothermal

    Range of Costs for Next-Generation Geothermal ▪ Data sourced from NREL’s 2024 ATB. Capital Costs Used in IRP 45,000 ▪ Deep EGS (3-7 km) Binary (150-200°C). 40,000 ▪ Min, Average, and Max cases. 35,000 ▪ Deep EGS Binary is used to represent a broadly deployable technology. 30,000 – Lower cost assumpt

  5. Slide 5: Next-Generation Geothermal Technology Status

    Next-Generation Geothermal Technology Status Concept/ Research & Component & Prototype ▪ Enhanced Geothermal Pilot & Demonstration Commercial Service technology has been Development Validation demonstrated technically and has shown evidence of • Enhanced rapid drilling cost Technical Readiness geoth

  6. Slide 6: Next-Generation Geothermal Deployment Timelines

    Next-Generation Geothermal Deployment Timelines: Project permitting and construction timeline on public land Source: DOE. 2024. Pathways to Commercial Liftoff: Next-Generation Geothermal Power. https://web.archive.org/web/20250425081459/https://liftoff.energy.gov/wp-content/uploads/2024/03/LIFTOFF_N

  7. Slide 7: Together...Shaping the Future of Energy

    TOGETHER…SHAPING THE FUTURE OF ENERGY® www.epri.com www.epri.com © 2026 Electric Power Research Institute, Inc. All rights reserved. 7 © 2026 Electric Power Research Institute, Inc. All rights reserved.