  1. Slide 1: Midtown Electricity Infrastructure Renewal Project

    Midtown Project Midtown Electricity Infrastructure Renewal Project Presentation to the Rosedale Main Street BIA January 12, 2010

  2. Slide 2: Need for Midtown Infrastructural Renewal

    Midtown Project Need for Midtown Infrastructural Renewal • Toronto Hydro-Electric System (Toronto Hydro) and Hydro One Networks Inc. (Hydro One) have identified a need to strengthen the midtown high voltage electricity infrastructure to ensure a continued reliable supply of power to Toronto Hydro cu

  3. Slide 3: Hydro One and Toronto Hydro Infrastructure

    Midtown Project Hydro One and Toronto Hydro Infrastructure

  4. Slide 4: Project Study Area and Alternative Route Options

    Midtown Project Midtown Project Study Area and Alternative Route Options

  5. Slide 5: Preferred Route – Option #1

    Midtown Project Preferred Route – Option #1 The preferred route, Option #1 was selected to refurbish the transmission infrastructure and closely follows the corridor of the existing lines installed starting in the 1920s and cables in the 1950s

  6. Slide 6: Assessment of Preferred Route

    Midtown Project Assessment of Preferred Route Based on the technical and environmental criteria evaluated, Option#1 has been identified as the preferred route: • Utilizes the existing transmission corridor and is the most direct route from Bayview Jct to Birch Jct • Avoids most private properties an

  7. Slide 7: Construction Options

    Midtown Project Construction Options Trench Tunnel To replace this underground section, two construction methods were investigated: shallow trench following the existing CPR corridor, city road allowances and private properties or; a deep rock tunnel following the existing CPR corridor. Both methods

  8. Slide 8: Advantages of Tunnel

    Midtown Project Advantages of Tunnel • Eliminates need to acquire easements on residential land • Eliminates need to coordinate with CPR scheduled outages • Avoids environmentally sensitive areas (e.g. ravines, watercourses) • Limits construction to shaft locations rather then trenching on road allo

  9. Slide 9: Shaft Locations for Tunnel Construction

    Midtown Project Shaft Locations for Tunnel Construction End Shaft @ Bayview Main Shaft End Shaft @ Birch Intermediate Shafts 9

  10. Slide 10: Exit Shafts

    Midtown Project Exit Shafts • Two exit shafts are proposed: one at Bayview Jct (E1 or E2) and one at Birch Jct (A) • Shafts would be approximately 5 metres in diameter New station equipment will be installed at Bayview Jct and Birch Jct. The stations will expand approximately 50% in size on Hydro On

  11. Slide 11: Birch Junction

    Midtown Project Birch Junction At this junction, the midtown circuits switch from overhead lines to underground cables. Location of exit shaft for tunnel boring machine Birch Junction Birch Ave. at Yonge St.

  12. Slide 12: Consultation and Communications

    Midtown Project Consultation and Communications • Briefed local city councillors and residents’ groups • Held two rounds of public information centres in February 2009 and early December 2009 • Newspaper ads • Midtown newsletters • Notification mailed to residents120 m on either side of the preferre

  13. Slide 13: Landscaping and Vegetation Management

    Midtown Project Landscaping and Vegetation Management • Replace the existing 115 kV overhead circuits on the existing towers and re-energize an idle circuit – will require some vegetation removal, possibly including mature trees • Hydro One will work closely with affected residents, the City of Toro

  14. Slide 14: Electric and Magnetic Fields (EMFs)

    Midtown Project Electric and Magnetic Fields (EMFs) • EMFs are invisible forces that surround electrical equipment, power cords and power lines. You cannot see or feel EMFs. • Every time you use electricity and electrical appliances, you are exposed to EMFs at extremely low frequencies. EMFs produce

  15. Slide 15: Environmental Assessment Requirements and OEB Approvals

    Midtown Project Environmental Assessment Requirements and OEB Approvals Ontario Environmental Assessment Act This project is subject to the provincial Environmental Assessment Act, and it follows the requirements of the Class EA for Minor Transmission Facilities document Ontario Energy Board Act The

  16. Slide 16: Project Schedule

    Midtown Project Project Schedule