Titagarh Rail Systems Ltd · NSE:TITAGARH

Titagarh Rail Systems — Investor Presentation (November 2023)

33 slides from Titagarh Rail Systems's investor presentation, November 2023

  1. Slide 1: Titagarh Rail Systems Ltd. Investor Presentation

    TITAGARH RAIL SYSTEMS LTD. Investor Presentation Investor Presentation

  2. Slide 2: Disclaimer

    Disclaimer This presentation is issued by Titagarh Rail Systems Limited (formerly Titagarh Wagons Limited) (the “Company”) for general information purposes only, without regard to specific objectives, suitability, financial situations and needs of any particular person. This presentation does not co

  3. Slide 3: Table of contents

    Table of contents 1 Company Overview 2 Business Segments 3 Industry Overview 4 Financial Performance 5 Future Strategy RESTRICTED 3

  4. Slide 4: 1. Company Overview

    1. Company Overview

  5. Slide 5: Titagarh Rail Systems: Comprehensive Rail Mobility Solution Provider in India

    Titagarh Rail Systems Limited1 (TRSL) is a Comprehensive Rail Mobility Solution Provider in India 1997 4 One of the largest wagon manufacturers in the country Year of Establishment Manufacturing Facilities2 Market leader with 25-30% market share in India (total tenders from FY20 to FY23 for wagon ma

  6. Slide 6: Vision, Mission and Values

    Vision, Mission and Values Our Vision Our Mission Values Become a global player in rail TRSL is committed to Focus on bringing satisfaction mobility and a leading service bringing in modern to the stakeholders with the provider for the railway technology and innovation in best interest of society be

  7. Slide 7: Titagarh's Journey So Far

    Titagarh’s Journey So Far First production of EMU/MEMU1 for Establishment of Titagarh Wagons Indian Railways Certified by RDSO – G105 with a Acquired 100% of Titagarh Firema2, Order for Metro Coaches in India Limited (TWL) as a manufacturing production capacity of an Italian manufacturer of passenge

  8. Slide 8: Key Business Segments

    Key Business Segments Freight Rail Systems (FTRS) Passenger Rail Systems (PRS) Freight Wagons Bogies, Couplers Draft Gears CMS Crossings Passenger Rolling Stock Propulsion and Electrical Equipment Market leader in wagon manufacturing with 25-30% market share (total tenders Home-grown Player in the P

  9. Slide 9: Manufacturing Facilities & Engineering Center

    Manufacturing Facilities & Engineering Center Wagons & Heavy Metro Coaches, Train Freight Rail Systems (FTRS) Engineering Division Electricals & Casting  Acq.: 2009  Est.: 20071, 20212  Products: Special  Products: Aluminum & purpose wagons, loco stainless-steel passenger shells and defence coac

  10. Slide 10: Strong Governance is the Key Pillar

    Strong Governance is the Key Pillar Whole Time Directors Independent Directors Mr. J. P. Chowdhary Mr. Umesh Chowdhary Mr. Manoj Mohanka Mr. Sunirmal Talukdar Executive Chairman Vice Chairman and Independent Director Independent Director Managing Director Mr. Anil Kumar Agarwal Mr. Pritish Chowdhary

  11. Slide 11: Environment, Social and Governance (ESG)

    Environment, Social and Governance (ESG) Environment Social Governance Focus on Energy Efficiency Social Development Committed to Highest Governance  Solar Power Plant of 2 MW capacity  Titagarh pledges to carry out its CSR vision to  More than 50% of the Board of Directors are educate the underp

  12. Slide 12: Awards and Recognitions

    Awards and Recognitions Titagarh Quality Certificates  Certification of IRIS awarded which could open  Certificate Level CL1 according to EN 15085- doors to international markets & partnerships 2:2007 for welding of railway vehicles & components  ISO 9001:2015  Certificate of Approval for QMS (2

  13. Slide 13: 2. Business Segments

    2. Business Segments

  14. Slide 14: Freight Rail Systems (1/2)

    Freight Rail Systems (1/2) Vertically Integrated Model Order Book (₹ in cr.) 14,830(1) 14,342(1) Manufacturing 8,400 p.a 30,000 MT Excellence with Wagon Capacity Liquid Metal experience of 25+ 1,024 1,295 Installed capacity at two facilities - years Titagarh and Uttarpara FY21 FY22 FY23 H124  Marke

  15. Slide 15: Freight Rail Systems (2/2)

    Freight Rail Systems (2/2) Freight Rolling Stock Flat Wagons Hopper Wagons Tank Wagons Box Wagons Car Carrying Wagons Covered Wagons Special Purpose Wagons Brake Van Freight Components Forged Wheel Set1 Cast Bogies Couplers Draft Gear Loco Shells CMS Crossing Note: 1) Forged Wheel Set manufacturing

  16. Slide 16: Passenger Rail Systems (1/2)

    Passenger Rail Systems (1/2) Product Suites Order Book (₹ in cr.) 250 p.a 12,716 (4) 13,870 (4) Rolling Stock Capacity Semi-High (3) (3) 3,841 4,490 Speed Trains Propulsion, Electrical Rolling stock Services Equipment  Supplied first ever metro in  Manufacturing of Traction FY21 FY22 FY23 H124 alu

  17. Slide 17: Passenger Rail Systems (2/2)

    Passenger Rail Systems (2/2) Passenger Rolling Stock Semi High-Speed High Speed EMU2 Train Sets Urban Metro Rail Light Rail Transport Diesel Electric Body Shells Trains 1 Train Multiple Units and Bogies Propulsion & Electrical Equipment Propulsion System Traction Motors Auxiliary Power Electronic Tr

  18. Slide 18: Passenger Rail Systems – Current Projects

    Passenger Rail Systems – Current Projects Pune Metro Bangalore Metro Vande Bharat Surat & Ahmedabad Metro  Manufactured India's first  Designed by CRRC-Nanjing and  Consortium of BHEL & TRSL will  The Surat Metro is 3-Car Aluminium body metro train manufacturing at TRSL factory, Kolkata do the s

  19. Slide 19: Key Order Updates

    Key Order Updates Vande Bharat Forged Wheel ₹ 120 cr. * 80 train sets Supply (A) ₹ 9,600 cr. Guaranteed Offtake ~15.40 Lakhs wheels over 20 years ₹ 120 cr. is the L1 price 35 years @ 4.1% p.a. Maintenance (B) ~ ₹ 13,500cr. of the supply price ~ ₹ 12,600 cr. Contract Value For guaranteed off-take Con

  20. Slide 20: 3. Industry Overview

    3. Industry Overview

  21. Slide 21: Industry Growth Led by Higher Infrastructure Spend and Government's Policy Support

    Industry Growth Led by Higher Infrastructure Spend and Government’s Policy Support  The Government of India aims in launching 400 Vande Bharat train (16 coaches) in the next 3-4 years and 1,000 mini-Vande Bharat train (8 coaches) in next 3-4 years  Capex allocation of ₹ 2.9 lakh cr. for FY23-24 to

  22. Slide 22: Strong Thrust on Railway Infrastructure

    Strong Thrust on Railway Infrastructure Indian Railways (IR) Report Card - FY23 In the Union Budget FY23-24, the government has allocated ₹ 2.9 lakh 80% 01 cr. towards railways which is the highest ever allocation and an increase of YoY 15% over previous year’s allocation 5,243 km of Tracks laid in

  23. Slide 23: Freight Rail Systems Growth Drivers

    Freight Rail Systems Growth Drivers Indian Railway, for the first time, aims to increase the freight traffic by rail from existing 26% to 45% by FY30, under the NLP, tendering In April 2022, a tender for procurement of 90,000 wagons over has seen a multi-fold increase in the last two years the next

  24. Slide 24: Passenger Rail Systems Growth Drivers

    Passenger Rail Systems Growth Drivers IR is expected to procure 8,000-9,000 incremental passenger coaches between FY22-26 Vande Bharat Metro  As of July 2023, a total of 50 Vande  The government targets to increase the Selected List of metro projects under Appraisal/Approval Bharat trains have bee

  25. Slide 25: 4. Financial Performance

    4. Financial Performance

  26. Slide 26: Consolidated Financials Performance (1/2)

    Consolidated Financials Performance (1/2) Order book (₹ in cr.) Revenue (₹ in cr.) 2,780 (2) (2) 27,546 28,212 (1) 1,931 1,846 (1) 1,521 1,039 (1) 4,865 (1) 5,785 FY21 FY22 FY23 H124 FY21 FY22 FY23 H123 H124 EBITDA (₹ in cr.) PBT (₹ in cr.) 6.9% 8.7% 11.0% 11.5% 12.5% (0.4 %) 1.5% 6.8% 7.0% 9.7% 306

  27. Slide 27: Consolidated Financials Performance (2/2)

    Consolidated Financials Performance (2/2) Earnings Per Share (₹ share) Return on Capital Employed3 and Equity4 10.9 10.8 22.1% 23.0% 13.9% 4.1 (1) 18.8% (1) 7.1% 4.5% (1) (1) (0.1%) (2.2%) (1) (0.03) FY21 FY22 FY23 H124 (1) (1.3) FY21 FY22 FY23 H123 H124 ROCE ROE Net Working Capital Days2 Net debt/E

  28. Slide 28: 5. Future Strategy

    5. Future Strategy

  29. Slide 29: Titagarh Edge – Mobility for Billions Globally

    Titagarh Edge – Mobility for Billions Globally Well Positioned to Leverage Sector Growth Leadership Modern day Passenger Rolling Stock Growing in Freight Rolling Stock Technology Demand  TRSL is one of the largest wagon  Titagarh Firema, Italy, has 25+ years of manufacturers in the country experie

  30. Slide 30: Transforming Business to Future Potential

    Transforming Business to Future Potential Backward integration Rail equipment value chain Forward integration Components Rolling Stock Services Other Passenger Electrical / Urban High/ Forged EMU Train Repair / Wagon Propulsion Electronic Others Wagons Metro Semi-High Others Re-design Maintenance Fa

  31. Slide 31: Shipbuilding, Bridges & Defence (SBD)

    Shipbuilding, Bridges & Defence (SBD) Past Plan of Action  TRSL diversified into shipbuilding through merger with 25-year-old Corporate Shipyard and currently licensed for warship manufacture by the Government of India • Currently merged into FTRS segment as the Products include oceanographic resea

  32. Slide 32: Summary / Key Takeaways

    Summary / Key Takeaways 1 One of the largest wagon manufacturers in the country with effective project management and timely execution capabilities 2 3 Passenger Rail Systems uniquely Attractive opportunities through positioned to capture growth with backward and forward integration its Modern day P

  33. Slide 33: Slide 33

Titagarh Rail Systems — Investor Presentation (November 2023) on 6ix