  1. Slide 1: March Quarter FY26 Activities Presentation

    March Quarter FY26 Activities Presentation 24 April 2026 ASX: PLS

  2. Slide 2: Our Purpose

    Our Purpose Vision Mission Powering a sustainable energy future Li Strategic Operate Grow Chemicals Diversify pillars Deliver our Achieve full Extract greater Diversify operating potential of our value along the revenue beyond performance global assets battery materials Pilgangoora commitments suppl

  3. Slide 3: Positioned for value creation through the cycle

    Positioned for value creation through the cycle Resilient operations, strategic flexibility and financial strength to navigate market cycles Strategically positioned Exposure to established and ex-China supply chains with flexible operating platform GWANGYANG, SOUTH KOREA POSCO Pilbara Lithium Solut

  4. Slide 4: March Quarter highlights

    March Quarter highlights Strong increase in pricing supports cash flow Operations Pricing Revenue Cash 12% vs Dec Q 61% vs Dec Q 52% vs Dec Q 52% vs Dec Q 1 2 232.4kt US$1,867/t $567M $1,455M produced SC5.2 Group revenue Cash balance Positioned Ngungaju restart – underway and on schedule for July 20

  5. Slide 5: Health and Safety

    Acknowledgement Health and Safety of Country Building the culture, systems and processes to ensure everyone goes home safely every day 3.82frequency rate (TRIFR)1 3.79 Total recordable injury 4.13completed 3.80 Quality safety interactions (target 1.6) per 1,000 hours worked2 (target 1.6) Total recor

  6. Slide 6: Pilgangoora Operation

    Pilgangoora Operation Pilgan plant operating capability further leveraged to deliver record production Key outcomes in the March Quarter performance: Mining TMM increased to 9.9 million tonnes due to improved operational efficiencies and in preparation for the Ngungaju Plant restart. Processing Cons

  7. Slide 7: Fuel and supply chains on schedule

    Fuel and supply chains on schedule Diesel availability monitored closely with no supply issues to date • PLS is monitoring fuel and other supply availability closely and working collaboratively with long term contracted suppliers to manage emerging risks. • At this time, PLS does not expect any mate

  8. Slide 8: Built for the cycle, ready to grow

    Built for the cycle, ready to grow Discipline preserved strength; fundamentals now unlock competitive advantage Ngungaju Plant restart • Ngungaju restart approved in the March Quarter – due July 2026. • Recruitment activities, and other operational readiness, progressing well. P2000 Feasibility Stud

  9. Slide 9: Chemicals

    Chemicals Preserving long-term growth optionality and strategic positioning across the lithium value chain POSCO Pilbara Lithium Solution (P-PLS) Lithium Hydroxide chemical facility • 18% interest in lithium hydroxide (LH) facility in Gwangyang, South Korea – restarted at moderated production in the

  10. Slide 10: March Quarter financials

    ©®PLS March Quarter financials 10

  11. Slide 11: March Quarter FY26 – vs prior quarter

    March Quarter FY26 – vs prior quarter Strong pricing and disciplined execution deliver 52% revenue growth and $1.5B cash balance Category Units Mar Q FY26 Dec Q FY25 % Revenue increased 52% to $567M driven by a 61% Production volume kt 232.4 208.0 12 increase in average realised price. Sales volume

  12. Slide 12: March Quarter FY26 – cash flow bridge

    March Quarter FY26 – cash flow bridge Strong operating cash margin drives $500M increase in cash to $1.5B Cash flow bridge – 31 December 2025 to 31 March 2026 ($M) Cash increased $500M to $1,455M, driven by strong 576 operating cash margin and receipt of US$100M 141 10 1,455 (A$141M)4 Canmax offtake

  13. Slide 13: Debut US bond matures PLS' balance sheet

    Debut US bond matures PLS’ balance sheet Unsecured notes provide funding depth and flexibility Total cash and liquidity as at 31 March 2026 Actual v Pro forma (post Bond / RCF refinance) (A$M) 1 3,000 2,500 • Post March Quarter end, PLS successfully priced its inaugural 2,000 US$600M 6.875% Senior U

  14. Slide 14: Positioning for Growth

    ©®PLS Positioning for Growth

  15. Slide 15: PLS is one of the world's largest lithium producers

    PLS is one of the world’s largest lithium producers Top 3 global primary lithium producer with further production growth potential 300 Global primary lithium production – key peers 300 CY25 Primary production kt LCE, attributable basis1 Colina project4 250 (future) 250 All future production subject

  16. Slide 16: Disciplined capital allocation

    Disciplined capital allocation Multi-year infrastructure investment program under evaluation1 Sustain Enhance Grow FY27 capex weighted towards Supports Pilgangoora at P2000 FID subject to mine development P1000 and positions for P2000 Board approval Mine Development Access road upgrade P2000 Pre-FID

  17. Slide 17: Market update

    ©®PLS Market update 17

  18. Slide 18: E-mobility demand accelerating globally

    E-mobility demand accelerating globally Global growth remains positive as demand broadens beyond China EV sales (M units) — 7x growth since 20201 BEV sales growth - Mar-26 vs. Mar-251,2 Heavy duty commercial vehicle sales (k units)1 25 300 New Zealand 278% 20 South Korea 121% 200 15 Rest of Asia 102

  19. Slide 19: Market tightness expected to persist

    Market tightness expected to persist Constrained supply, strong demand and energy security support the long-term outlook Lithium demand by end-use (kt LCE)1 Lithium supply and demand forecast (Mt LCE)1 Mine development cycles2 Years, discovery to production 6,000 6.0 18 5,000 5.0 16 1.4 4,000 4.0 11

  20. Slide 20: Questions

    ©®PLS Questions 20

  21. Slide 21: Contacts

    Contacts Investor Relations James Fuller Group Manager, Investor Relations T: +61 (0) 488 093 763 James.Fuller@pls.com Media Michael Vaughan Fivemark Partners T: +61 (0) 422 602 720 21

  22. Slide 22: Appendix

    ©®PLS Appendix 22

  23. Slide 23: Physicals summary

    Physicals summary Total Ore Mined and Processed Units Mar Q FY25 Jun Q FY25 Sep Q FY26 Dec Q FY26 Mar Q FY26 YTD FY25 YTD FY26 Ore mined wmt 1,137,437 1,500,849 1,725,478 1,514,444 1,286,891 3,717,588 4,526,813 Waste material wmt 4,503,580 4,890,456 5,978,805 6,627,413 8,603,435 18,310,717 21,209,65

  24. Slide 24: Important notices

    Important notices This document has been prepared by PLS Group Limited (“PLS” or the “Group”) and is dated 24 April 2026. This document should be read in conjunction with the ASX announcement titled “March Quarterly Activities Report” released to the ASX on 24 April 2026. Not an offer of securities

  25. Slide 25: Important notices

    Important notices Important Information regarding Mineral Resources, Ore Reserves and production targets Information in this document regarding production targets and expansions in nameplate capacity of the Pilgangoora Operation in respect of the P850 and P1000 operating models and the P2000 expansi