Gt Resources Inc · TSXV:GT

Gt Resources — Palladium One Mining — Investor Presentation (May 2023)

26 slides from Gt Resources's investor presentation, May 17, 2023

  1. Slide 1: Critical Green Transportation Metals Corporate Presentation

    CRITICAL GREEN TRANSPORTATION METALS CORPORATE PRESENTATION CORPORATE PRESENTATION JUNE 13, 2022 MAY 17, 2023 TSX-V: PDM OTCQB: NKORF FRA: 7N11 TSXV: PDM OTCQB: NKORF 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Palladium One Mining Inc’s (the “Company”) expectations and projections. The TSXV has neither approved

  3. Slide 3: Green Transportation Metals

    Green Transportation Metals PALLADIUM scrubs nitrous oxide from gasoline exhaust. Nitrous oxide is 300x more potent than CO2 as a greenhouse gas. Extending the life of the battery An electric car needs about while preventing overheating PALLADIUM 180 lbs of COPPER, more around the cathode continue t

  4. Slide 4: Project Highlights

    Project Highlights LK PROJECT FINLAND Palladium / Copper / Nickel KS PROJECT FINLAND  Disseminated high-tenor sulphide TYKO PROJECT  Multiple untested targets along 38 ONTARIO, CANADA Nickel / Copper Sulphide km mineralized strike length CANALASK PROJECT YUKON, CANADA INDICATED Nickel / Copper Sul

  5. Slide 5: Overview

    Overview Market Valuation Research Coverage - Price Targets Capitalization (millions) Cash (Dec 31, 2022 Proforma*) $18.3 M Sprott Capital Brock Salier $0.40 Shares issued 358 Enterprise value $18 M Research Capital Adam Schatzker $0.30 Options 17 Market Cap $36 M Echelon Partners Ryan Walker $0.65

  6. Slide 6: Tyko Ni-Cu-Co Project: Potential For Large Scale Discovery

    Tyko Ni-Cu-Co Project: Potential For Large Scale Discovery  100% interest  30 kilometers of strike length  Fully funded, $5 million exploration budget  30,000 hectares  New district, not mapped by OGS  45 drill holes awaiting assays TSXV: PDM OTCQB: NKORF 6

  7. Slide 7: Tyko Ni-Cu-Co Project: 2023 Field Season is Underway

    Tyko Ni-Cu-Co Project: 2023 Field Season is Underway West Pickle Zone  32 diamond drill holes completed  6,800 meters drilled  Mineralization over 500 meters  5 km strike length Ember Zone  3.5 km SW of Smoke Lake discovery, 6 km ‘chonolith’  On strike with Cupa Lake VTEM and soil anomalies TS

  8. Slide 8: Tyko Ni-Cu-Co Project: WP Zone

    Tyko Ni-Cu-Co Project: WP Zone West side of property highlighting interpreted Feeder-dykes and proximal high-grade Ni-Cu zones. Close-up of coarse pentlandite “eyes” in massive sulphide veining at WP.  2022 Discovery  Structurally controlled massive Ni-Cu sulphide (similar to Smoke Lake) with mino

  9. Slide 9: Tyko Ni-Cu-Co Project: RJ Zone

    Tyko Ni-Cu-Co Project: RJ Zone  Underexplored zone with both in-tact, primary-type UM Ni- Cu mineralization (disseminated to net-textured to semi- massive) and structurally controlled/remobilized textures within tonalite.  High nickel tenors (Up to 40% Pentlandite in total sulphide content).  Str

  10. Slide 10: Tyko Ni-Cu-Co Project: Tyko Zone

    Tyko Ni-Cu-Co Project: Tyko Zone Patchy to semi-massive sulphide textures in RJ Zone. Some remobilization. High-tenor Ni sulphides (Pn) West side of Tyko property highlighting interpreted Feeder-dykes and proximal high-grade Ni-Cu zones.  Both primary-type UM Ni-Cu mineralization (disseminated to n

  11. Slide 11: Tyko Ni-Cu-Co Project: Smoke Lake Zone

    Tyko Ni-Cu-Co Project: Smoke Lake Zone  48 holes totally 6,000 meters drilled  Massive sulphide over 300 meters strike length plus disseminated/blebby over 450 meters.  10.2% Ni, 8.8% Cu over 3.8m at surface (TK20-023)  9.1% Ni, 7.9% Cu over 3.8m at surface (TK20-016)  Open to north and south-e

  12. Slide 12: Tyko Ni-Cu-Co Project: Exploration Potential

    Tyko Ni-Cu-Co Project: Exploration Potential • Multiple near-surface massive sulphide targets • Linear magnetic features interpreted to be large-scale feeder-dyke systems. • 10’s of kms of untested targets • Near-surface, bulk-tonnage Ni-Cu mineralization • Potential for both primary and secondary m

  13. Slide 13: Tyko Ni-Cu-Co Project: Comparison to World Class Deposits

    Tyko Ni-Cu-Co Project: Comparison to World Class Deposits • Interpreted Ultramafic feeder-type dykes intruding Archean, sulphur-rich sediments, feeding Bulldozer complex. • Systems saturated in sulphur and precipitating high-tenor nickel-copper sulphides • Batholith intruding and breaking up the Bul

  14. Slide 14: Canalask Nickel-Copper-PGE, Canada

    Canalask Nickel-Copper-PGE, Canada  Northwest of historic Wellgreen Nickel Mine  Large-scale ultramafic body  Historic NI 43-101 (Falconbridge)  Multiple high-grade Nickel-Copper-PGE showings (magmatic Norilsk feeder-type)  All season access from Alaskan Highway  Nickel-rich, epigenetic “footw

  15. Slide 15: Mining in Finland

    Mining in Finland TOP MINING JURISDICTION ROBUST MINING HISTORY Globally – Mining Policy Framework 44 active mines Globally – Investment Attractiveness Population of 5.5 million people EXISTING INFRASTRUCTURE Decreases development capital: Paved road(s) access Railway High-voltage power on property

  16. Slide 16: LK Project: Finland

    LK Project: Finland NI-43-101 Mineral Resource Estimate INDICATED (38.2Mt @ 0.89 g/t TPM1, 0.13% Cu, 0.11% Ni, 65 g/t Cobalt)  1.1 million oz precious metals  111 million lbs copper  92 million lbs nickel  5 million lbs cobalt  Low Strip Ratio INFERRED (49.7Mt @ 0.68 g/t TPM1, 0.16% Cu, 0.14% N

  17. Slide 17: LK Project: Metallurgy @ Kaukua Area

    LK Project: Metallurgy @ Kaukua Area Concentrate Grade Bulk (1) Copper (2) Nickel (3) Advanced Metallurgical Testing Mass pull 1.20% 0.36% 0.84%  High-tenor sulphide deposit Palladium 40.1 g/t 38.3 g/t 40.8 g/t  Conventional flotation process  Highly saleable, high- Platinium 11.6 g/t 13.1 g/t 11

  18. Slide 18: KS: Massive Sulphide Target – Geophysical Anomalies

    KS: Massive Sulphide Target – Geophysical Anomalies • At 100% sulphide, LK hosts ~58 g/t palladium, ~84 g/t total-precious-metals (TPM), 10% nickel and 13% copper. • High tenor LK mineralization suggests massive sulphides could be very high value. • GTK hole (2021) first to test anomaly, 5km east of

  19. Slide 19: Leadership Team

    Leadership Team Derrick Weyrauch, CPA CA President, CEO and Director Lawrence Roulston Non-Executive Chairman, Independent Director • 30+ years of capital markets experience (Audit, ESG and Comp Committee) • Founder and director of Magna Mining Inc., non-executive director at Cabral Gold Inc. and No

  20. Slide 20: Environmental, Social & Governance (ESG)

    Environmental, Social & Governance (ESG) STRATEGY Palladium One strives to produce Green Transportation Metals while delivering Net-Zero Greenhouse Gas (GHG) Emissions over the full life of its exploration, development, mining activities and that of the metals it strives to produce. ENVIRONMENT SOCI

  21. Slide 21: Contact: Corporate Presentation

    CONTACT: DERRICK WEYRAUCH PRESIDENT & CEO INFO@PALLADIUMONEINC.COM Corporate FOLLOW US ON Presentation @PALLADIUM_ONE JUNE 13, 2022 PALLADIUM-ONE-MINING TSX-V: PDM OTCQB: NKORF FRA: 7N11 21 TSXV: PDM OTCQB: NKORF

  22. Slide 22: Tyko Geological History: A-Typical Ni-Sulphide Setting

    Tyko Geological History: A-Typical Ni-Sulphide Setting 22 TSXV: PDM OTCQB: NKORF

  23. Slide 23: LK: Open Pit Disseminated Sulphide

    LK: Open Pit Disseminated Sulphide • Hosted by the laterally extensive basal phase of Koillismaa Complex • Post intrusion deformation has extensively exposed favourable basal phase at surface • High-tenor, palladium dominated sulphide (3Pd:1Pt) Cross section of the original sheet-like Koillismaa Int

  24. Slide 24: Other Ontario Properties

    Other Ontario Properties PROPERTY LOCATION METAL COMMENTS • Approximately 5 kilometers along strike from to Barrick’s producing Hemlo Gold Mine in Ontario with annual production of 150,000 ounces Au & 3.7 million ounces of Resources • Barrick entered into Earn-in agreement November 2020 by paying $3

  25. Slide 25: Hemlo East Property & Hemlo Annex Royalty

    Hemlo East Property & Hemlo Annex Royalty  Barrick has not completed any drilling on the property  Based on the geophysics map below, it appears that there is structural continuity TSXV: PDM OTCQB: NKORF 25

  26. Slide 26: LK Project: NI43-101 Resource Sensitivity

    LK Project: NI43-101 Resource Sensitivity RESOURCE SENSITIVITY TO PALLADIUM PRICE (US$ / OZ) IN-SITU CONTAINED METAL- Mineral Resource Estimate - April 2022 Pd Price Pd Pt Au TPM (1) Cu Ni Co Tonnes (US$/oz) (M oz) (M oz) (M oz) (M oz) (M lbs) (M lbs) (M lbs) (M t) $ 900 0.58 0.21 0.07 0.85 83.3 67.

Palladium One Mining — Investor Presentation (May 2023) on 6ix