Azarga Metals Corp. · TSXV:AZR

Azarga Metals — Investor Presentation (October 2020)

19 slides from Azarga Metals's investor presentation, October 2020

  1. Slide 1: Copper-Silver Discovery of Global Significance

    Slide 1: Copper-Silver Discovery of Global Significance

    $AZR.V #highgrade #silver #copper @AzargaMetals $AZR #Russia #firstmover #districtpotential COPPER-SILVER DISCOVERY OF GLOBAL SIGNIFICANCE October 2020

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Certain statements in this presentation are forward-looking statements. Forward-looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Often, but not always, forward-looki

  3. Slide 3: Key themes: A copper-silver discovery of global significance

    Slide 3: Key themes: A copper-silver discovery of global significance

    Key themes A copper-silver discovery of global significance  Azarga Metals (TSX-V: AZR) owns 100% of the Unkur Copper-Silver Project in the Chara-Aldan area, Russian Far East  Unkur is a discovery of global significance with current Inferred Resource:  62 Mt @ 0.53% Cu and 38.6g/t Ag (i.e. 0.90%

  4. Slide 4: Overview: Capitalization and history

    Slide 4: Overview: Capitalization and history

    Overview: Capitalization and history Capitalization Share price (C$/share – last 12-months) Shares outstanding1 95.9m Share price (TSX-V: AZR)1 C$0.07/share Market cap (CAD) ~C$6.7m Director & officer ownership ~35% Note: 1. As Oct 1, 2020 (excludes options and warrants). Source: TMX Money History M

  5. Slide 5: Overview: Leadership

    Slide 5: Overview: Leadership

    Overview: Leadership Genuine sector-leading exploration and development experience plus Russia experts  Experienced large mining company CEO and financier Alexander Molyneux  CEO Galena Mining (ASX:G1A) (2018 – ), CEO Paladin Energy (ASX:PDN) (2015 – (Non-Executive Chairman) 2018), Non-Exec Chairm

  6. Slide 6: Location

    Slide 6: Location

    Unkur Copper-Silver Project Location Regional location of Zabaikalye Unkur, local geography and infrastructure Source: Azarga Metals Commentary  Zabaikalye has a direct land border with China  It includes the world’s third and 14th largest undeveloped copper deposits, both of which have been moved

  7. Slide 7: Location – just km from Udokan

    Slide 7: Location – just km from Udokan

    Unkur Copper-Silver Project Location – just 35 km from Udokan Unkur +0.5 Mt Cu eq Syulban Krasnoe Sakinskoe Klyukvennoe 0.9 Mt Cu Burpala Udokan >24 Mt Cu Chiney FeTiV Pravoingamakitskoe +8 Mt Cu 1.1 Mt Cu 30 km 6

  8. Slide 8: Infrastructure

    Slide 8: Infrastructure

    Unkur Copper-Silver Project Infrastructure ~30 km Chara Unkur outcrop Novaya Chara  25-year, mineral exploitation license (5,390ha) granted in 2014  Outbound logistics by truck via 12-km road to existing highway and then 30 km to BAM railway station  Historical exploration (1960s and 1970s) and v

  9. Slide 9: Terrain and infrastructure

    Slide 9: Terrain and infrastructure

    Unkur Copper-Silver Project Terrain and infrastructure Unkur area terrain  Terrain  900 – 1,000m above sea level  Relatively flat  Transport  7km from BAM Railway  2,800km to Vladivostok (Pacific port)  Power BAM Railway near Chara  High voltage substation at Novaya Chara (within 30km) with

  10. Slide 10: Summary of 2018 PEA

    Slide 10: Summary of 2018 PEA

    Unkur Copper-Silver Project Summary of 2018 PEA PEA RESULTS NPV8 US$204M (pre-tax) IRR 29% Capex US$187M PEA outcomes – Production metrics PEA outcomes – Capital investment and project economics Mill throughput 2.0Mtpa Pre-production capital (incl. US$37M US$187M contingency) Initial mine life 8-yea

  11. Slide 11: Unkur vs Udokan – just km away

    Slide 11: Unkur vs Udokan – just km away

    Unkur Copper-Silver Project Unkur vs Udokan – just 35 km away UNKUR UDOKAN Source: Perello et al., 2016 10

  12. Slide 12: Soviet data

    Slide 12: Soviet data

    Unkur Copper-Silver Project Soviet data Soviet drillholes Interpreted copper mineralization Drill-proven copper mineralization 5 km - +90% moraine cover - Simple NW-trending syncline, with mineralization on two limbs recognized - One mineralized horizon only drill-traced over 5 km (Azarga tested onl

  13. Slide 13: Azarga Metals results – 2019-2020 magnetic survey and drilling

    Slide 13: Azarga Metals results – 2019-2020 magnetic survey and drilling

    Unkur Copper-Silver Project Azarga Metals results – 2019-2020 magnetic survey and drillling Source: Azarga Metals  Mag survey shows position of the stratabound copper at magnetic gradient  15 diamond core drill-holes (5,572 m) extended the strike length of stratabound copper-silver mineralization

  14. Slide 14: Azarga Metals 2020 geological model

    Slide 14: Azarga Metals 2020 geological model

    Unkur Copper-Silver Project Azarga Metals 2020 geological model  Stratabound Cu-Ag mineralization at the base of clastic sequence with calcareous cement  Cross-cutting quartz-Cu feeder veins identified in outcrop and drill core Source: Azarga Metals  Cu-Ag mineralization occurs within pyrite and

  15. Slide 15: 2019-2020 drill intercepts in extended Cu-Ag mineralized envelope

    Slide 15: 2019-2020 drill intercepts in extended Cu-Ag mineralized envelope

    Unkur Copper-Silver Project Azarga Metals 2019-2020 drill intercepts in extended Cu-Ag mineralized envelope No significant intercepts in AM19-001 and AM19-015  Mineralization drill confirmed over 6.5 km length at and near surface  All assay results received  Four higher grade (+0.5% Cu) plunging

  16. Slide 16: Azarga Metals results and plans

    Slide 16: Azarga Metals results and plans

    Unkur Copper-Silver Project Azarga Metals results and plans  2019-2020 exploration program successfully completed despite COVID-19  Average grade in 2019-2020 drillholes (19.5 m @ 0.45% Cu and 32.61 g/t Ag in 12 holes) is very similar to average grade in 2016-2017 drillholes (15.8 m @ 0.48% Cu and

  17. Slide 17: Appendix

    Slide 17: Appendix

    Unkur Copper-Silver Project APPENDIX 16

  18. Slide 18: Mineral Resource Estimate – Effective Date March 7th 2018

    Slide 18: Mineral Resource Estimate – Effective Date March 7th 2018

    Unkur Mineral Resource Estimate – Effective Date March 7th 2018 Class Tonnes (t) Density Cu Grade Ag Grade (g/t) CuEq (%) Cu Metal (t)* Ag Metal (t oz) (%) Inferred 62,000,000 2.67 0.53 38.6 0.9 328,600 76,881,000 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viab

  19. Slide 19: TSX-V: AZR

    Slide 19: TSX-V: AZR

    Unit 1 – 15782 Marine Drive White Rock, B.C. V4B 1E6 Canada 604-536-2711 Twitter: @AzargaMetals Email: info@azargametals.com www.azargametals.com TSX-V: AZR

Source: Internet Archive copy of azargametals.com

More decks from Azarga Metals Corp.

All 8 Azarga Metals decks