Azarga Metals Corp. · TSXV:AZR

Azarga Metals — Investor Presentation (June 2022)

20 slides from Azarga Metals's investor presentation, June 2022

  1. Slide 1: Marg Copper-Rich VMS Project, Yukon Territory

    Slide 1: Marg Copper-Rich VMS Project, Yukon Territory

    MARG COPPER-RICH VMS PROJECT YUKON TERRITORY June 2022 TSX-V: AZR

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Certain statements in this presentation are forward-looking statements. Forward-looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Often, but not always, forward-looki

  3. Slide 3: Overview: Marg Project

    Slide 3: Overview: Marg Project

    Overview: Marg Project High-grade copper-rich VMS project with significant gold and silver credits  Focused on recently acquired Marg Project  High-grade copper-rich Volcanogenic Massive Sulphide (“VMS”) deposit located in Canada’s Yukon Territory within the Keno Hill Silver District  Several VMS

  4. Slide 4: Overview: Leadership

    Slide 4: Overview: Leadership

    Overview: Leadership Board of Directors and Executive Team  Director of Northern Lights Resources Corp. (CSE: NLR) and Metallum Resources Inc. Gordon Tainton (TSX-V: MZN) (President, CEO & Director)  Senior management and board positions in public and private mining companies  Formerly President

  5. Slide 5: Overview: Leadership - Advisors

    Slide 5: Overview: Leadership - Advisors

    Overview: Leadership Advisors  Experienced mining company CEO and Director Alexander Molyneux  CEO Galena Mining (ASX:G1A) (2018 – 2021), CEO Paladin Energy (ASX:PDN) (2015 – (Advisor) 2018), Non-Executive Chairman of Argosy Minerals (ASX:AGY) (2016 – 2022), and Non- Executive Director of Metalla

  6. Slide 6: Overview: Capitalization and Path to Success

    Slide 6: Overview: Capitalization and Path to Success

    Overview: Capitalization and Path to Success Capitalization Shares outstanding1 130.5 m  Share ownership by Share price (TSX-V: AZR)1 C$0.05/share directors, management and significant shareholders – Market cap (CAD) C$6.5m 36% Cash2 C$647k Note: 1. As at Feb. 15, 2022 (excludes options and warrant

  7. Slide 7: Why the Marg Project excites us

    Slide 7: Why the Marg Project excites us

    Marg Project Why the Marg Project excites us…  High-grade copper-rich VMS deposit in a known jurisdiction  Strong potential to materially extend and expand the defined mineralized deposit  Marg mineralization remains open along strike, down-dip and down plunge  VTEM data and mapping have not yet

  8. Slide 8: Location, Access and Infrastructure

    Slide 8: Location, Access and Infrastructure

    Marg Project Location, Access and Infrastructure Grid Power  Excellent infrastructure available  Grid power (Yukon Energy hydro power) is available ~40km away  Airstrip on site  Access to Skagway, Alaska port  All-season highway access from Whitehorse to Keno City  40km (winter only) road from

  9. Slide 9: Historical Resource Estimate

    Slide 9: Historical Resource Estimate

    Marg Project Historical Resource Estimate Category Tonnage Cu% Pb% Zn% Ag g/t Au g/t (Mt) Indicated 3.7 1.5 2.0 3.8 48 0.76 Inferred 6.1 1.2 1.7 3.4 44 0.74 Note 1. At a 0.5% copper equivalent cut-off. Note 2. Where CuEq% was calculated = Cu% + 0.28 Pb% + 0.32 Zn% + 0.39 Au g/t + 0.0055 Ag g/t, whic

  10. Slide 10: Regional Geology and Exploration History

    Slide 10: Regional Geology and Exploration History

    Marg Project Regional Geology and Exploration History  Located near the northern margin of Selwyn Basin  Felsic-hosted VMS deposit associated Victoria Gold & with the Cordillera from Mexico to Alexco Resources Alaska  Marg deposit consists of a series of continuous to discontinuous sheets of mass

  11. Slide 11: Geological Map and Cross-Section showing Regional Setting of the Marg VMS Deposit

    Slide 11: Geological Map and Cross-Section showing Regional Setting of the Marg VMS Deposit

    Marg Project Geological Map and Cross-Section showing Regional Setting of the Marg VMS Deposit –7 Source: Historic Marg Project PEA and Technical Report; see Appendix 10

  12. Slide 12: GEMS Cross-Section looking east

    Slide 12: GEMS Cross-Section looking east

    Marg Project GEMS Cross-Section looking east  Mineralization occurs at and/or near the contact between the footwall felsic metavolcanic rocks and the hanging wall argillaceous sediments  Mineralization hosted within wedge-shaped succession dominated by felsic metavolcanic rocks  Appears tightly f

  13. Slide 13: Exploration Upside

    Slide 13: Exploration Upside

    Marg Project Exploration Upside  Marg mineralization remains open along strike, down-dip and down plunge Marg  Drilling could extend known Marg mineralization in areas where there is promising evidence for the deposit continuing Jane  Marg deposit discovered by GSC regional stream sediment and fo

  14. Slide 14: Exploration Upside – Next steps

    Slide 14: Exploration Upside – Next steps

    Marg Project Exploration Upside – Next steps  Next steps:  Review historical geophysical and geochemical database (incl. re-interpretation of underutilized VTEM data)  Drill Marg extensions and the highly prospective Jane Zone geophysical targets Proposed Marg M2022 series drill holes – Gemcom 3D

  15. Slide 15: Proposed M2022 series drill holes: Favourable VMS horizons on Geology

    Slide 15: Proposed M2022 series drill holes: Favourable VMS horizons on Geology

    Marg Project Exploration Upside – Proposed M2022 series drill holes: Favourable VMS horizons on Geology 14

  16. Slide 16: Proposed M2022 drill holes: VMS Horizons and Ag in soil anomalies

    Slide 16: Proposed M2022 drill holes: VMS Horizons and Ag in soil anomalies

    Marg Project Exploration Upside – Proposed M2022 series drill holes: VMS Horizons and Ag in soil heat map anomalies 15

  17. Slide 17: Historic and Historic Proposed drill holes on Geology

    Slide 17: Historic and Historic Proposed drill holes on Geology

    Marg Project Exploration Upside – Historic and Historic Proposed drill holes on Geology  Strong potential for additional VMS deposits along strike, especially in Jane Zone area  Proposed drilling within selected target boxes will be focused on:  Exceptionally strong Ag-Tl-Pb-Cu-Ba in soil anomali

  18. Slide 18: Community Engagement

    Slide 18: Community Engagement

    Marg Project Community Engagement  Yukon has an established and supportive mining community  The Marg Project lies within the Keno Hill Silver District within the traditional territory of the First Nation of Na-Cho Nyàk Dun (“FNNND”)  FNNND have multiple active mining groups operating within thei

  19. Slide 19: TSX-V: AZR Contact

    Slide 19: TSX-V: AZR Contact

    Unit 1 – 15782 Marine Drive White Rock, B.C. V4B 1E6 Canada 604-536-2711 Twitter: @AzargaMetals Email: info@azargametals.com www.azargametals.com TSX-V: AZR

  20. Slide 20: Appendix: Marg Project historical resource estimate disclosure

    Slide 20: Appendix: Marg Project historical resource estimate disclosure

    Appendix Marg Project historical resource estimate disclosure In accordance with Section 2.4 of National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101) and despite Section 2.2 an issuer may disclose a historical estimate, using the original terminology, if the disclosure

Source: Internet Archive copy of azargametals.com

More decks from Azarga Metals Corp.

All 8 Azarga Metals decks