Newcore Gold — Technical Presentation (June 2026)

38 slides from Newcore Gold's technical presentation, Jun 24, 2026

  1. Slide 1: In the Business of Gold

    IN THE BUSINESS OF GOLD TSX-V: NCAU OTCQX: NCAUF Pre-Feasibility Study - Enchi Gold Project JUNE 2026

  2. Slide 2: Forward Looking Statements

    | FORWARD LOOKING STATEMENTS This presentation is provided for informational purposes only and the opinions expressed are based upon Newcore Gold government authorities); title to properties; and other risks and uncertainties related to our prospects, properties and Ltd.’s (“Newcore” or the “Company

  3. Slide 3: Newcore Gold - Advancing the Enchi Gold Project in Ghana

    | NEWCORE GOLD - ADVANCING THE ENCHI GOLD PROJECT IN GHANA PROVEN TEAM | 12% Equity Ownership Top-tier leadership with a successful track record in the industry and strong institutional investor support GOLD ASSET | Robust Pre-Feasibility Economics De-risking the technical merits of the Enchi Gold P

  4. Slide 4: Slide 4

  5. Slide 5: Pre-Feasibility Study - Open Pit, Milling Operation

    | ENCHI PRE-FEASIBILITY STUDY - OPEN PIT, MILLING OPERATION • Pre-Feasibility Study at Enchi highlights the potential for a conventional open pit mining with standard milling and carbon-in-leach (“CIL”) processing operation with robust economics and strong leverage to the gold price • Study led by L

  6. Slide 6: Pre-Feasibility Study - Led by Lycopodium

    | ENCHI PRE-FEASIBILITY STUDY - LED BY LYCOPODIUM • Lycopodium lead study manager for the PFS - Engineering group recognized globally for being a partner of choice • One of the strongest track records in both studies and project execution for West African projects RECENT LYCOPODIUM PROJECTS IN WEST

  7. Slide 7: Pre-Feasibility Study - Overview

    | ENCHI PRE-FEASIBILITY STUDY - OVERVIEW PRE-FEASIBILITY KEY PARAMETERS (All Currencies in US$) • Technically straightforward, open pit and milling operation Key Assumptions • Processing 5.5 Mtpa, contract mining Base Case Gold Price $3,800/oz • Low LOM strip ratio of 4.3, minimal pre-stripping requ

  8. Slide 8: Pre-Feasibility Study - Exploration Upside

    | ENCHI PRE-FEASIBILITY STUDY - EXPLORATION UPSIDE YEARS 1 TO 3 HIGHLIGHTS (All Currencies in US$) • Early production years demonstrate the value upside from Production Profile continued exploration success Average Gold Grade Processed 0.80 g/t Au • Average annual gold production of 130,000 ounces i

  9. Slide 9: Depth Potential - Chirano Comparable

    | ENCHI DEPTH POTENTIAL - CHIRANO COMPARABLE • Asante’s Chirano Gold Mine, located ~50 km northeast of Enchi, hosts plunging zones of high-grade gold mineralization with gold zones and geology comparable to Enchi • Chirano has been in production since 2004, both open pit and underground operations,

  10. Slide 10: Depth Potential - Drilling Success at Boin

    | ENCHI DEPTH POTENTIAL - DRILLING SUCCESS AT BOIN • Drilling at Enchi has intersected wide zones of gold mineralization containing higher grade core structures • Recent limited deeper drilling completed at the Boin Gold Deposit has intercepted gold mineralization down to a vertical depth of 200 to

  11. Slide 11: Pre-Feasibility Study - Production & Cost Profile

    | ENCHI PRE-FEASIBILITY STUDY - PRODUCTION & COST PROFILE • Early production years demonstrate the value from continued exploration success, with ongoing drilling focused on delineating Enchi’s higher-grade potential and success from recent drilling not incorporated into Pre-Feasibility Study Avg. A

  12. Slide 12: Pre-Feasibility Study - After-Tax Cash Flow Profile

    | ENCHI PRE-FEASIBILITY STUDY - AFTER-TAX CASH FLOW PROFILE • Robust cash flow profile with short after-tax payback period of 1.6 years at a gold price of US$3,800/oz • Strong leverage to the gold price, after-tax payback drops to 1.4 years at a spot gold price of US$4,200/oz Cumulative After-Tax Ca

  13. Slide 13: Pre-Feasibility Study - Leverage to the Gold Price

    | ENCHI PRE-FEASIBILITY STUDY - LEVERAGE TO THE GOLD PRICE • Project economics provide strong leverage to the gold price with a quick payback period • Development strategy optimized via transition to open pit mining and standard milling and CIL processing • Pre-Feasibility Study an important technic

  14. Slide 14: Pre-Feasibility Study - Process Flowsheet

    | ENCHI PRE-FEASIBILITY STUDY - PROCESS FLOWSHEET • Standard milling and CIL processing flowsheet selected due to higher gold recoveries from testwork • Processing throughput of 5.5 Mtpa • Process design includes: • Mineral sizer for oxide ore, crushed feed with P80 of 40-50 mm • Jaw crusher for fre

  15. Slide 15: Pre-Feasibility Study - Location & Infrastructure

    | ENCHI PRE-FEASIBILITY STUDY - LOCATION & INFRASTRUCTURE • Location: Town of Enchi located ~10 km west of the Project TOWN OF ENCHI • Paved road and powerline crosses the central portion of the Project leading to the town of Enchi • Fuel, accommodations, food, supplies available • Labour: Region ha

  16. Slide 16: Pre-Feasibility Study - Proposed Site Layout

    | ENCHI PRE-FEASIBILITY STUDY - PROPOSED SITE LAYOUT • Project accessible from Accra (capital of Ghana) on sealed roads with paved and gravel roads providing access to deposits • Relatively flat terrain with rolling hills, existing road access to all deposits • Ore to be trucked from four deposits t

  17. Slide 17: Pre-Feasibility Study - Mining Schedule

    | ENCHI PRE-FEASIBILITY STUDY - MINING SCHEDULE PRODUCTION DETAILS BY DEPOSIT • Open pit mining utilizing contract mining Tonnes Grade Avg. Recovery Gold Produced • Conventional truck and shovel operation Deposit (Mt) (g/t Au) (%) (payable ozs) Strip Ratio Boin 15.9 0.84 89.7% 384,615 6.5 • Mining t

  18. Slide 18: Pre-Feasibility Study - Capital Cost Details

    | ENCHI PRE-FEASIBILITY STUDY - CAPITAL COST DETAILS • Capital cost estimate based on open pit mining utilizing CAPITAL COST DETAILS (All Currencies in US$) contract mining and mill processing at 5.5 Mtpa Capital Cost Items Initial Sustaining Closure Life-of-Mine Construction Distributables $34.3 -

  19. Slide 19: Pre-Feasibility Study - Operating Cost Details

    | ENCHI PRE-FEASIBILITY STUDY - OPERATING COST DETAILS • Costs based on a detailed annual mining and processing OPERATING COST DETAILS (All Currencies in US$) schedule, including variations in haulage profiles Operating Cost Items LOM (US$M) US$/tonne ore US$/oz Au Mining $880 $17.15 $923 • Mining C

  20. Slide 20: Enchi - Mineral Reserve and Resource Estimate

    | ENCHI - MINERAL RESERVE AND RESOURCE ESTIMATE • The Mineral Reserves are based on the conversion of MINERAL RESERVE & RESOURCE DETAILS Indicated Mineral Resources within the current pit design Deposit Tonnes Grade (g/t Au) Contained Au (oz) Probable Mineral Reserve Estimate • Inaugural reserves at

  21. Slide 21: Slide 21

  22. Slide 22: Ghana - Africa's Top Gold Jurisdiction

    | GHANA - AFRICA’S TOP GOLD JURISDICTION GHANA 1 Ghana is Africa's largest gold producer, 6th largest worldwide 1) and produces more gold per square km than Nevada 2) 2 Ghana’s stable, democratic government supports mining 3) 3 Mining and gold are essential to Ghana’s economy and tax base 4) 4 Ghana

  23. Slide 23: Ghana - Pro-Development with Production Growth

    | GHANA - PRO-DEVELOPMENT WITH PRODUCTION GROWTH • Strong presence of senior gold producers, 4 of the top 10 operating in-country 1. China 2. Russia • Zijin acquisition of Akyem from Newmont added a fourth major gold producer 3. Australia 4. Canada 5. Peru 6. Ghana 7. USA 8. Uzbekistan Top • Strong

  24. Slide 24: Enchi - On Trend with Prominent Gold Mines in Ghana

    | ENCHI - ON TREND WITH PROMINENT GOLD MINES IN GHANA • Enchi located on a prolific gold belt that hosts numerous multi-million-ounce operating gold mines Sefwi-Bibiani Belt Newmont - Ahafo 20.0Moz Asante - Bibiani 6.5Moz Asante - Chirano 5.5Moz Turaco - Afema 4.6Moz Newcore Gold - Enchi 1,502,000 o

  25. Slide 25: Enchi - Gold Project with Size and Scale Potential

    | ENCHI - GOLD PROJECT WITH SIZE AND SCALE POTENTIAL • Established Gold Resource, shallow oxide resources open for expansion along strike and at depth • 1,502,000 ozs Indicated resource at 0.56 g/t, 626,000 ozs Inferred resource at 0.49 g/t • District Scale Exploration, 248 km2 property with +25 tar

  26. Slide 26: Enchi Gold Project - 80,000-Metre Drill Program

    | ENCHI GOLD PROJECT - 80,000-METRE DRILL PROGRAM • 80,000-metre resource growth and infill drill program underway • First phase (28,000 metres) completed - focused on near-surface mineralization with a goal of infill drilling for resource conversion • Second phase underway - focused on targeting th

  27. Slide 27: Enchi - Results from Diamond Drilling at Boin

    | ENCHI - RESULTS FROM DIAMOND DRILLING AT BOIN • Diamond drilling at Enchi’s Boin Gold Deposit intersected high-grade mineralization in the upper portions of the fresh mineralization within three high-grade zones, targeting mineralization at depth within 200 to 350 vertical metres • Results not inc

  28. Slide 28: Enchi - Visible Gold in Diamond Drilling at Boin

    | ENCHI - VISIBLE GOLD IN DIAMOND DRILLING AT BOIN • Diamond drilling intersecting high-grade gold mineralization, encountered first visible gold by drilling on the Project • Drilling in 2026 includes some of the strongest results to date, highlighting the high-grade potential at Enchi and future re

  29. Slide 29: Enchi - Results from Diamond Drilling at Sewum

    | ENCHI - RESULTS FROM DIAMOND DRILLING AT SEWUM • Diamond drilling at Enchi’s Sewum Gold Deposit continues to intersect wide zones of shallow gold mineralization • Drilling encountered gold mineralization above the mineral resource grade and below the limits of the pits that constrain the Mineral R

  30. Slide 30: Slide 30

  31. Slide 31: Newcore Gold - Top Tier Leadership Team

    | NEWCORE GOLD - TOP TIER LEADERSHIP TEAM Management Team & Strategic Advisor Luke Alexander Danny Lee Greg Smith Mal Karwowska Dan Wilson Alan Pangbourne President, CEO & Director CFO VP, Exploration VP, Corporate Dev. & IR Country Manager Strategic Advisor (Technical) Board of Directors | Diverse

  32. Slide 32: Newcore Gold - Corporate Snapshot

    | NEWCORE GOLD - CORPORATE SNAPSHOT Share Structure and Market Valuation Share Ownership Basic Shares Outstanding 312.7M High Net Worth & Options Outstanding 9.0M Retail Investors 33% RSUs/PSUs Outstanding 9.6M Fully Diluted Shares Outstanding 331.3M Share Price (C$) (June 24, 2026) $0.37 Management

  33. Slide 33: Newcore Gold - Strong Dedication to ESG & CSR

    | NEWCORE GOLD - STRONG DEDICATION TO ESG & CSR • Strong commitment to the environment, good governance and community relations • Adding value for all stakeholder for sustainable growth long-term • Newcore Gold’s ESG is guided by nine of the U.N. Sustainable Development Goals • Priority is ensuring

  34. Slide 34: Newcore Gold - Unlocking the Value Potential at Enchi

    | NEWCORE GOLD - UNLOCKING THE VALUE POTENTIAL AT ENCHI 80,000 METRE DRILLING PROGRAM Drilling Underway at Newcore’s Enchi Gold Project in Ghana focused on resource expansion and exploration FUNDED FOR DRILLING & DEVELOPMENT ~$18.8 million cash as of May 2026, post equity financing Funded for drilli

  35. Slide 35: Key Takeaways

    KEY TAKEAWAYS Top-Tier Management & Board Own 12% of Equity Strong Capital Structure Strong Institutional Investor Support Established Resource Base Multi-Million-Ounce Gold District Advancing Development Strong Economics in Pre-Feasibility Study District-Scale Exploration - Drilling Underway Signif

  36. Slide 36: Learn More About the Newcore Opportunity

    IN THE LEARN MORE ABOUT THE NEWCORE OPPORTUNITY BUSINESS OF GOLD CONTACT INFORMATION Mal Karwowska, VP, Corporate Development & IR TSX-V: NCAU Office: +1 (604) - 484 - 4399 Email: info@newcoregold.com OTCQX: NCAUF www.newcoregold.com Linkedin, logo icon Circle, facebook icon Channel, circle, logo, m

  37. Slide 37: Enchi Gold Project Technical Disclosure

    | ENCHI GOLD PROJECT TECHNICAL DISCLOSURE 2026 Pre-Feasibility Study (“PFS”) Non-IFRS Financial Measures 1. The PFS was announced on June 24, 2026 and is based upon the Company’s Mineral Resource Estimate for The Company has included certain non-IFRS financial measures in this presentation, such as

  38. Slide 38: Enchi Gold Project Technical Disclosure (Continued)

    | ENCHI GOLD PROJECT TECHNICAL DISCLOSURE (CONTINUED) Mineral Resource Estimate Mineral Reserve Estimate 1. Canadian Institute of Mining Metallurgy and Petroleum ("CIM") definition standards were followed for the 1. Canadian Institute of Mining Metallurgy and Petroleum ("CIM") definition standards w

Newcore Gold — Technical Presentation (June 2026) on 6ix