Compania De Minas Buenaventura Saa · BVL:BUENAVC1

Compania De Minas Buenaventura Saa — Compañía de Minas Buenaventura — Investor Day (2023)

58 slides from Compania De Minas Buenaventura Saa's investor day presentation, 2023

  1. Slide 1: 2023 Investor Day

    = MORE THAN MINING YEARS 2 0 2 3 Investor Day

  2. Slide 2: Cautionary Statement

    Cautionary Statement.- This presentation contains certain information that may constitute forward-looking information under applicable U.S. securities legislation, including but not limited to information about costs applicable to sales, general and administrative expenses; production volumes; curre

  3. Slide 3: Leadership team with strong and diversified experience

    Leadership team with strong and diversified experience Board of Directors Executive Team Roque Benavides Raúl Benavides William Champion Leandro García Daniel Domínguez Juan Carlos Ortiz (Chairman) (Independent) CEO since 2020 CFO since 2020 COO since 2018 Diego de la Torre Nicole Bernex Marco A. Za

  4. Slide 4: Buenaventura's Strategy

    BUENAVENTURA´S COUNTRY & SUSTAINABILITY MARKET STRATEGY OUTLOOK OPERATIONS GROWTH EXPLORATION PROJECTS & INNOVATION FINANCIALS 4

  5. Slide 5: Buenaventura's Growth Strategy

    BUENAVENTURA’S GROWTH STRATEGY Unlocking Value

  6. Slide 6: Unlocking value through exploration and development for 70 years

    has delivered continuous organic growth through exploration and development for 70 years… …and today, we embark on a journey that goes beyond the extraction of resources. It’s a journey guided by the core elements of our growth strategy: …foster community …prioritize our Strengthened operational par

  7. Slide 7: Focus on four flagship assets position us as a mining leader

    Focus on four flagship assets position us as a mining leader... …through precious and base metals diversification and increased LOM… Yumpag +100MOz-Ag >10 years LOM El Brocal >10 years LOM 12ktpd underground mine San Gabriel Latest project under construction >10 years LOM @ 100kOz-Au Cerro Verde >30

  8. Slide 8: Our DNA of exploring new mineral resources to broaden our portfolio

    …our DNA of exploring new mineral resources to broaden our portfolio. Ag Uchucchacua Yumpag CMC Sulf Coimolache Cu El Brocal Orcopampa Au San Gabriel Trapiche Julcani Cu Cerro MLZ Sulf Tambomayo Verde 8

  9. Slide 9: Country & Market Outlook

    COUNTRY & MARKET OUTLOOK

  10. Slide 10: Country and Sector Outlook

    Country and Sector Outlook Mitigated risk of higher • Mining is a key sector for the mining taxes and new country’s economic recovery. regulation of personnel outsourcing • Special government task force designated to track project progress These initiatives boost exploration, encourage Approved envi

  11. Slide 11: Market Outlook – Copper

    Market Outlook – Copper • Positive copper market outlook driven by two main factors: Market Balance (Kt) • Copper supply will not increase drastically in the upcoming 490 500 years. Challenging permits, regulations, and past decade's 360 limited investments make new copper projects difficult 200 120

  12. Slide 12: Market Outlook – Gold and Silver

    Market Outlook – Gold and Silver Price (USD/Oz) 2,300 2,100 • Prices should remain high due to geopolitical conflicts GOLD 1,900 • The market expects the FED to begin rate cuts in 2024 1,700 • Weak US dollar is also contributing to a higher gold price 1,500 1,300 2018 2019 2020 2021 2022 2023E 2024E

  13. Slide 13: Market Outlook – Zinc and Lead

    Market Outlook – Zinc and Lead Price (USD/t) 4,000 • Zinc demand is expected to struggle in the next few years 3,500 due to weakness in Europe ZINC • Market should turn to deficit by 2028 pushed by the green 3,000 energy transition 2,500 • A 1.2Mt gap expected by 2030 2,000 2018 2019 2020 2021 2022

  14. Slide 14: Sustainability

    SUSTAINABILITY

  15. Slide 15: Our sustainability focus: social impact and energy efficiency

    15 Across the highlands Our sustainability focus: social impact and of Peru energy efficiency Watershed management: • +100Mm3 stored in seven reservoirs mainly for community use • +700k seedlings planted for forestation and water harvesting • +10 hydraulic infrastructure works that carry +500 liters

  16. Slide 16: Ongoing Assessment and Validation of our Sustainability Strategy

    Ongoing Assessment and Validation of our Sustainability Strategy We built our ESG Materiality Matrix that enables us to: Economic and Identify Environmental Social governance main issues that could impact or influence our business, stakeholders or environment SIGNIFICANCE FOR STAKEHOLDERS Plan and m

  17. Slide 17: Sustainability priorities: Community, Environment and Climate

    17 Sustainability priorities: Community, Environment and Climate Focusing on Community Engagement, Environmental Compliance, and Mitigating Climate Change Impact through Watershed Initiatives Environment and Climate change: Inclusive business model, Developing projects with value closing gaps promot

  18. Slide 18: Exploration

    EXPLORATION

  19. Slide 19: Mineral Resources & Reserves

    Mineral Resources & Reserves Exploration is within our DNA: 4.8 +7% 4.6 Focus on Gold, Silver & Copper 4.3 GOLD (MOz-Au) 2.2 2.0 Historical Production 2.6 2.3 North: 1 La Zanja (Au): 1.7 Moz 2021 2022 2023 2 Coimolache (Au): 1.6 Moz +49% Central: 297 12 209 SILVER (MOz-Ag) 3 Uchucchacua (Ag): 315 Mo

  20. Slide 20: Robust pipeline of Brownfield & Greenfield exploration projects

    Robust pipeline of Brownfield & Greenfield exploration projects Resource Yumpag delineation • Yumpag: 113.1Moz Ag (M&I + Inf) CMC-Sulfides • CMC-Sulfides: 4.7Mt Cu eq (Ind+Inf) OP & 0.7Mt Cu eq (Ind+Inf) UG MLZ-Sulfides • MLZ-Sulfides: Continued growth of the project’s potential Bx 4 Don Jorge Drill

  21. Slide 21: Robust pipeline of Brownfield & Greenfield exploration projects

    Robust pipeline of Brownfield & Greenfield exploration projects Resource delineation • Yumpag: 113.1Moz Ag (M&I + Inf) • CMC-Sulfides: 4.7Mt Cu eq (Ind+Inf) OP & 0.7Mt Cu eq (Ind+Inf) UG Yumpag • MLZ-Sulfides: Continued growth of the project’s potential CMC-Sulfides MLZ-Sulfides Gold/Silver Copper B

  22. Slide 22: Yumpag: +110 million ounces of high-grade silver

    Yumpag: +110 million ounces of high-grade silver N New discovery of high-grade silver mineralization (+20ozAg). • First infill drilling program on Tomasa was successfully completed, including the best hole to date: 107.2m at 54.5oz/t Ag • 87% increase in M&I resources from 35Moz to 65Moz Ag Litholog

  23. Slide 23: Coimolache: Large copper-gold sulfide project in northern Peru

    Coimolache: Large copper-gold sulfide project in northern Peru • Large-scale copper-gold sulfide project  2km long by 1km wide • The second infill drilling campaign completed  20.5km from 45 DDH • Copper Eq grade increased by 23% from the previous estimate on improved geological understanding of m

  24. Slide 24: La Zanja: Moving from oxides to sulfides

    La Zanja: Moving from oxides to sulfides • 42.7km drilled to date on 3 breccia-pipes has led to initial resources of: • Deep holes confirm the system is open at depth  8.5m at 1.4%Cu and 8.3g/tAu (Alba) • Directional drilling is expected to start in 3Q24 Exploration Upside: • New blind breccia pipe

  25. Slide 25: Operations

    OPERATIONS

  26. Slide 26: Diverse Operations with World Class Potential

    Diverse Operations with World Class Potential Operates in the three most important Mining Districts of Peru with Diversified Portfolio in Tier 1 Jurisdictions great infrastructure 1 Coimolache - O/P Transition from Gold to Copper Sulfide 3 Uchucchacua - U/G 2 La Zanja - O/P Resume operation & ramp-u

  27. Slide 27: Production Guidance Reflects Growth and Diversification

    Production Guidance Reflects Growth and Diversification 215 - 220 9.5 – 10.0 56 - 58 2023 kOz MOz kton 2024 170 - 180 13.0 – 14.0 50 - 55 kOz MOz kton 2025 165 - 185 kOz 14.0 – 16.0 MOz 50 - 60 kton 220 - 240 14.0 – 16.0 50 - 60 2026 kOz MOz kton 27 Guidance figures include 100% BVN, 100% El Brocal,

  28. Slide 28: El Brocal Mine: Large Scale & Long-Life Copper Mine

    El Brocal Mine: Large Scale & Long-Life Copper Mine El Brocal Mine EL Brocal Copper 200 Contribution Copper Production (kt) 150 Open Pit N 100 Mine Trapiche Project (FS) Coimolache Project (SS) 50 UG Mine El Brocal Mine - Inferred Resources 0 Central 2024 2025 2026 2027 2028 2029 2040 2030 2031 2032

  29. Slide 29: Uchucchacua

    Uchucchacua Resume Operations Uchucchacua Mine Operations Uchucchacua Mine SE Polymetallic Areas NW HUANTAJALLA CARMEN SOCORRO MINE MINE MINE Underground mine productivity increased 20% with mine sectorization 4450 Developed a new metallurgical process that 4120 optimizes the value of the mineral Mi

  30. Slide 30: Yumpag

    Yumpag Start-Up Yumpag Mine (high grade) Yumpag 14.0 Silver Production (M Oz) Surface Infrastructure almost 100% 12.0 implemented. At Q2.2024, energy supply 10.0 from the national grid will be concluded 8.0 The first areas mined confirm the high silver 6.0 content of the ore with an average of 25 Oz

  31. Slide 31: Yumpag

    Yumpag Start-Up Yumpag Mine (high grade) 31

  32. Slide 32: Coimolache

    Coimolache Transition from Gold to Copper Sulfide Copper-Gold project Cost competitive assets Sulfide Copper-Gold overlaps evaluating opportunities to best in established mining jurisdictions current Au-oxide mine footprint exploit significant Mineral Resource Potential base Oxide Pit Limit Sulfide

  33. Slide 33: Growth Projects

    GROWTH PROJECTS

  34. Slide 34: Continuous Pipeline of Projects

    Copper 34 Gold Continuous Pipeline of Projects Silver Othes Increase value through our diversified portfolio focusing on projects with LOM ↑10 years Exploration Dorita Mulanan Chaska Bx 4 Llicllao La Zanja Coimolache Mayra Sulfides El Sulfides Brocal Tinka 10Y Anama- San Gaby ray Trapiche Gabriel Yu

  35. Slide 35: San Gabriel: Our next large gold project

    San Gabriel: Our next large gold project Progress as of: Item Description Project Milestones 1Q23 2Q23 3Q23 1 Engineering 66% 81% 90% San Gabriel campsite First gold 2 Procurement 85% 85% 89% completed bar 3 Construction 3% 7% 14% Start UG mining Finish Earthworks contractor contractor 4 Commissioni

  36. Slide 36: San Gabriel: Project components

    San Gabriel: Project components FRESH WATER DAM MINE PORTAL SAN GABRIEL CAMP WASTE DUMP 36

  37. Slide 37: San Gabriel: Our commitment to sustainable mining

    San Gabriel: Our commitment to sustainable mining 3 5 3 1 4 WASTE DUMP 2 5 STOCKPILE 1 CRUSHING 2 PROCESSING PLANT 4 OFFICES AND LABORATORY PROCESSING PLANT PLATFORM 37

  38. Slide 38: Trapiche: Our next large copper project

    Trapiche: Our next large copper project Metallurgical laboratory on site Trapiche Schedule Variability testing Viable external 2nd campaign access EIAd file Approve EIAd issue 3Q23 4Q23 2025 2026 Feasibility Power line right-of- Complete Power study finish pass at 30% line right of pass Feasibility

  39. Slide 39: Trapiche: Project components

    Trapiche: Project components Signed: Cusco ENRICHED ORE OXIDE & TRANSITIONAL 54km LEACH PAD ORE LEACH PAD CC. Mollocco Área de Amortiguamiento Ayacucho Reserva Cotahuasi CC. Mollebamba TRAPICHE National Highway National Highway OPEN PIT Arequipa SX/EW-AREA Qda. Arpa Orcco Power line: 66,1km TRAPICHE

  40. Slide 40: Financials

    FINANCIALS

  41. Slide 41: Nine-Months 2023 Financial Highlights: Strong on copper

    Nine-Months 2023 Financial Highlights: Strong on copper Copper output growth, higher metal prices, and dividends from Cerro Verde drove cash generation Revenue Dividends from Cerro Verde(2) Cash Position US$ 570 M US$ 150 M US$ 222 M (2023E = US$ 800 – 860 M) Revenue Mix CAPEX(3) Net Debt Cu Au Ag U

  42. Slide 42: Increase Margins and Cash Generation

    Increase Margins and Cash Generation Cost optimization Improving business performance by identifying and implementing efficient operational processes Capital allocation Strategically distributing financial resources to optimize returns and support long-term goals, with a main focus on capital expend

  43. Slide 43: Increased Margins and Cashflow by Redefining Mining and Metallurgical Processes

    Increased Margins and Cashflow by Redefining Mining and Metallurgical Processes, Plus Decreased G&A 6,584 6,613 6,300 6,250 6,150 6,050 Copper El Brocal 5,133 • Become self-operators of mining activities. Gradual US$/TMF-Cu implementation since 2024 • Optimizing stopes, reducing preparation meters •

  44. Slide 44: Capital Allocation

    Capital Allocation Prioritizing available resources with a focus on San Gabriel, leading to limited dividends in the coming years. This financial discipline will yield higher and steadier future dividends Prioritization of Cash proceeds: Maintenance capex for 1 continuing operations Shaping the rock

  45. Slide 45: Investing in value generation

    Investing in value generation Intensive CAPEX phase to take our flagships to the next level In US$ millions Sustaining Capex (+/- 5%) San Gabriel Growth Capex (+/- 5%) • Concrete Batch Plant, for concrete installation works (USD 4M, 2023) 330 310 • Concrete Installation, for process plant and infras

  46. Slide 46: Securing the liquidity to finance our upcoming growth projects

    Securing the liquidity to finance our upcoming growth projects Revolving Credit Facilities Negotiating the final terms and conditions of the facilities with local banks Term 1 $100M Committed $60M - $100M In negotiation Rate 7.0% - 9.0% 30 months (matching corporate bond duration) Bond refinancing:

  47. Slide 47: Free cash flow generation

    Metal prices: Free cash flow generation (in US$ millions) Au ($/Oz) Ag ($/Oz) Cu ($/TMF) Zn ($/TMF) Pb ($/TMF) 1,700 22.0 8,500 2,500 2,000 Striking the right balance between our short and long-term objectives FX = 3.75 PEN/USD Uchucchacua/Yumpag San Gabriel full year of operations starts operations

  48. Slide 48: Buenaventura's Growth Strategy

    BUENAVENTURA’S GROWTH STRATEGY Unlocking Value

  49. Slide 49: Au Ag Cu production outlook

    200 79 197.0 150 Au kOz-Au 100 GOLD 50 - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 20.0 15.0 MOz-Ag 47 107.9 AgSILVER 10.0 5.0 - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 150 125 100 Kton-Cu 29 63.5 Cu COPPER 75 50 25 - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32'

  50. Slide 50: San Gabriel will allow BVN to stabilize production

    200 79 197.0 150 San Gabriel will allow Au kOz-Au 100 BVN to stabilize production GOLD 50 ↑175 kOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 20.0 15.0 MOz-Ag 47 107.9 AgSILVER 10.0 5.0 - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 150 125 100 Kton-Cu 29 63.5 Cu COPPER

  51. Slide 51: Yumpag + Tomasa will boost silver production

    200 79 197.0 150 San Gabriel will allow Au kOz-Au 100 BVN to stabilize production GOLD 50 ↑175 kOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 20.0 15.0 Yumpag + Tomasa MOz-Ag 47 107.9 Ag 10.0 will boost BVN’s production to SILVER 5.0 ↑15 MOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28'

  52. Slide 52: El Brocal transition to a 100% copper producer

    200 79 197.0 150 San Gabriel will allow Au kOz-Au 100 BVN to stabilize production GOLD 50 ↑175 kOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 20.0 15.0 Yumpag + Tomasa MOz-Ag 47 107.9 Ag 10.0 will boost BVN’s production to SILVER 5.0 ↑15 MOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28'

  53. Slide 53: Trapiche will turn BVN to a world class copper producer

    200 79 197.0 150 San Gabriel will allow Au kOz-Au 100 BVN to stabilize production GOLD 50 ↑175 kOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 20.0 15.0 Yumpag + Tomasa MOz-Ag 47 107.9 Ag 10.0 will boost BVN’s production to SILVER 5.0 ↑15 MOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28'

  54. Slide 54: Focus on four flagship assets, building our pipeline of diverse projects

    Focus on four flagship assets, building our pipeline of diverse projects and increased LOM position us as a mining leader... Ag Yumpag Yumpag producing at full potential Cu El Brocal El Brocal underground mine expansion @ 12ktpd Au San Gabriel San Gabriel ramp-up and first gold bar Cu Cerro Verde Ce

  55. Slide 55: 2023 Investor Day

    = MORE THAN MINING YEARS 2 0 2 3 Investor Day

  56. Slide 56: Appendix

    xs Q a LL a. a <x

  57. Slide 57: Securing the liquidity to finance our upcoming growth projects

    Securing the liquidity to finance our upcoming growth projects We have made significant progress towards improving Buenaventura's financial health, which will allow for continued growth 2022 2025  Sale of BVN’s total stake in → Bond refinancing Yanacocha ($300M) will initiate  Newmont transferred

  58. Slide 58: CMC Sulfides will boost BVN copper production

    250 79 197.0 200 CMC Sulfides will allow Au 150 kOz-Au BVN to stabilize production 100 GOLD 50 ↑175 kOz/yr - 20' 21' 22' 23' 24' 25' 26' 27' 28' 29' 30' 31' 32' 33' 25.0 20.0 Yumpag + Tomasa MOz-Au 47 107.9 15.0 Ag 10.0 will boost BVN’s production to SILVER 5.0 ↑15 MOz/yr - 20' 21' 22' 23' 24' 25' 2

Compañía de Minas Buenaventura — Investor Day (2023) on 6ix