Catalina Resources Limited · ASX:CTN

Catalina Resources — Investor Presentation (November 2024)

16 slides from Catalina Resources's investor presentation, Nov 22, 2024

  1. Slide 1: Corporate Presentation November 2024

    Corporate Presentation November 2024

  2. Slide 2: Disclaimer and compliance statement

    Disclaimer and compliance statement • This presentation contains only a brief overview of Catalina Resources Ltd (“Catalina“ and/ or “the Company” ) and its activities and operations. The contents of this presentation, including matters relating to the geology of the Company’s projects, may rely on

  3. Slide 3: Corporate Overview

    Corporate Overview • Shares on issue* ~ 1,238 m ▪ Sanjay Loyalka, FAIM, ACA, B.Com (Hons) Chairman ➢ 30 years’ experience in Metals and Mining - Corporate Finance, Commercial and General • Options* ~ 32.5 m Management. • Cash* ~A$ 2.65 m ➢ Former roles have included Founder CEO of Aditya Birla Miner

  4. Slide 4: Project Portfolio

    Project Portfolio NB: Kookynie West not shown in figure above as is under sale agreement with Kobold Metals

  5. Slide 5: Laverton Project

    Laverton Project • Located within the Laverton Gold Province, an exceptionally well mineralised terrain in the Eastern Goldfields, Western Australia. • The region hosts several world class deposits of gold, nickel, and rare earth elements (REE) including Sunrise Dam (>10Moz Au10), Granny Smith (>8Mo

  6. Slide 6: Laverton Project

    Laverton Project • Aircore drilling in March 2024 & September 2024 by Catalina intersected broad zones of gold mineralization in the supergene (oxidized) zone • Mineralized gold intervals returned best results including 6,10 : ➢ LVAC049 44m @ 1.01g/t Au from 44m (includes 4m @ 2.22g/t Au, 4m @ 1.96g

  7. Slide 7: Laverton Project

    Laverton Project • Catalina aircore drilling also targeted point source magnetic anomalies considered to be shallow mafic to ultramafic intrusions prospective for REE mineralization. The Mt Weld REE mine is just 5km to the south. • Mineralized REE intervals returned best results including 6,10 : ➢ L

  8. Slide 8: Lachlan Fold Belt Project

    Lachlan Fold Belt Project Rock Lodge • The project is located in the Lachlan Fold Belt, a high-profile mining and exploration region that contains several major gold, copper-gold and silver deposits. These include Newcrest Mining Ltd’s Cadia-Ridgeway Mine, Evolution Mining Ltd’s Lake Cowal Mine, and

  9. Slide 9: Lachlan Fold Belt Project

    Lachlan Fold Belt Project Altered Sulphidic Rock Lodge sediments vein - Two pre-collared NQ diamond holes (SRLRCD001-2) were drilled in November 2024 to test under the historic workings and previous drilling to a downhole depth of ~300m. - The holes intersected broad zones of alteration and veining

  10. Slide 10: Lachlan Fold Belt Project

    Lachlan Fold Belt Project 8m @ 1.089 Au, ‘1m @ 5.4g/t Au, 55.6g/t Ag, 212g Bi ‘2m @ 2.7glt Au, 11.897 Ag, 2m @ 2.13g/t Au, 2497 Ag, 1m @ 4.2g/ Au, 29690 Bi, 0.07% Cu 0.28% Cu b [2m @ 0.78g/t Au, 1.99" Ag, 300g/t Bi, 0.48% Cu 7m @ 0.339) Au, -13gitAg, 0.06% Cu 12% Cu ne/Shale ‘ones ene 4 Siltstone 0.

  11. Slide 11: Lachlan Fold Belt Project

    Lachlan Fold Belt Project Rock Lodge ▪ Significantly RC drill holes also intersected anomalous copper, bismuth and cadmium indicating the mineralization may be intrusion related with implication for the tonnage potential. 8 ▪ Rocklodge represents a large hydrothermal alteration system with a late br

  12. Slide 12: Nelson Bay Iron Project

    Nelson Bay Iron Project • Developed from initial DSO discovery in 2010 to production in 2013 in Benchmark cost and time - First company to mine DSO Iron Ore in Tasmania. • Proximal to Savage River Magnetite (Grange Resources , ASX : GRR). • DSO Iron Ore production and shipments - November 2013 to Ju

  13. Slide 13: Nelson Bay Iron Project

    Nelson Bay Iron Project ▪ Re-permitting – DSO Project ➢ Development Application made to Council in August 2018 for new permit for DSO operations only to replace old permit issued in 2012 ❖ Recommence previously developed DSO Pit ❖ Deepening of existing DSO Pit (~30m) to approximately 80m ❖ Over prev

  14. Slide 14: Strategy

    Strategy Project incubation (identify Advance projects using Realise value and acquire portfolio of under modern exploration explored projects) techniques development, mining, JV, sale ❖ The Company has built a portfolio of projects in highly prospective terranes ➢ FY 2021 : Lachlan Fold Belt ➢ FY 2

  15. Slide 15: Connect with us

    Connect with us Unit 38, 18 Stirling Highway Nedlands, WA 6009 T: +61 8 ​6118 1672 E: info@catalinaresources.com.au W: www.catalinaresources.com.au

  16. Slide 16: References

    References 1 Westaway, J., Lily Pond Well Project: Annual Report for period 1 Jan 1999 to 31 Dec 1999. Sons of Gwalia WAMEX Report 1999 (A60870). 2 Ida H Gold Mine: Mindat (https://www.mindat.org/loc-268922.html). 3 Great Southern Mining Ltd (ASX: GSN) announcement, 21st July 2021; Indicated Mineral

Catalina Resources — Investor Presentation (November 2024) on 6ix