Boss Energy Limited · ASX:BOE

Boss Energy — Macquarie Australia Conference 2024

13 slides from Boss Energy's conference presentation, May 9, 2024

  1. Slide 1: Becoming a multi-mine Uranium producer

    For personal use only Becoming a multi-mine Uranium producer Positioned to benefit from a rising Uranium market Macquarie Australia Conference ~ May 2024 ASX: BOE | OTCQX: BQSSF bossenergy.com

  2. Slide 2: Disclaimer and Important Notices

    Disclaimer and Important Notices IMPORTANT: You must read the following before continuing. PAST PERFORMANCE This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy” or Past performance information, including past share price performance of

  3. Slide 3: Boss Strategic Horizons ~ it's all about timing

    Boss has delivered two producing mine and market capital growth of $2B and zero debt BOSS Strategic Horizons ~ it's all about timing For personal use only Vision and Strategy Foundation and Development Organic Growth Mergers & Acquisitions ➢ Become Australia’s Next Uranium ➢ Skilled, committed, stab

  4. Slide 4: On time and on budget to be a multi-mine ISR producer

    On time and on budget to be a multi-mine ISR producer in Two tier One locations in 1st Half 2024 Global Uranium Platform in Tier 1 Locations HONEYMOON (100% ownership): 2.45Mlbs U308 p.a. ALTA MESA (30% ownership): 1.5Mlbs U308 p.a. For personal use only South Australia First drum produced Texas Fir

  5. Slide 5: Partnership combines experience in development, commissioning and operating mining projects

    Partnership combines experience in development, commissioning and operating mining projects globally Leading Development and Operating Experience BOSS ENERGY For personal use only Wyatt Buck (Chair) Duncan Craib (CEO and MD) Jan Honeyman (NED) Bryn Jones (NED) • GM of McArthur River Uranium Mine • F

  6. Slide 6: ISR and IX are proven cost-effective uranium mines

    ISR and IX are proven cost-effective uranium mines and ESG friendly relative to traditional mining In-Situ Recovery Mining and Ion Exchange In-Situ Recovery (ISR) Ion Exchange (IX) For personal use only Most common method of uranium recovery globally Proven technology ISR accounts for ~ 60% global u

  7. Slide 7: Uranium prices are trading at 16-year highs

    Uranium prices are trading at 16-year highs ~ Term US$80/ lb U308 and Spot ~ US$ 93/ lb U308 price 4 Key Uranium Industry Considerations 1 Supply to 2030 is tight across the cycle, and if Russia cuts supply to the US in response For personal use only Supply is tight to US sanctions on Russian supply

  8. Slide 8: Uranium prices have yet to peak and likely to overshoot

    Uranium prices have yet to peak and likely to overshoot in near term due to lack of new production Spot and Term prices For personal use only Boss has entered into two binding sales agreement to sell ~1.8 Mlbs U308 in total to two major Western utilities in the period to 2032. Reasons for net increa

  9. Slide 9: The supply deficit is forecast to grow

    The supply deficit is forecast to grow as reserves for existing mines are exhausted and insufficient production planned to replace it Global uranium supply & demand ~ structural deficit Base Case Uranium Supply / Demand (UXC) Uncovered Requirements (UXC) For personal use only Source: UXC Uranium Mar

  10. Slide 10: Uranium prices have never been this high at the start of a contracting cycle

    Uranium prices have never been this high at the start of a contracting cycle Contracting activity and strategy Boss has entered into two For personal use only binding sales agreement to sell 1.8Mlbs U308 to major European / US power utilities over 8yrs from 2024 to 2032 Alta Mesa Central Processing

  11. Slide 11: Multi-mines in two tier locations: Asset Portfolio Highlights

    MUTLI-MINES in TWO TIER 1 locations, only 4 currently world-wide with more than 1 producing asset Asset Portfolio Highlights Resource tables For personal use only Boss’ post transaction asset portfolio Honeymoon Project Contained U3O8 Honeymoon Tonnes (Mt) Grade (%U3O8) (Mlbs) Ownership % 100 Measur

  12. Slide 12: Substantial Exploration Target of 58Mlbs to 190Mlbs

    Substantial Exploration Target of 58Mlbs to 190Mlbs at grades up to 1,080ppm U3O81 Honeymoon Exploration Potential • Following strong infill drilling results at Gould’s Dam, Jasons, Billeroo and Sunset. Boss is now preparing for technical and For personal use only economic studies on developing the

  13. Slide 13: Keep in touch

    For personal use only Keep in touch +61 (8) 6263 4494 boss@bossenergy.com ASX: BOE | OTCQX: BQSSF

Boss Energy — Macquarie Australia Conference 2024 on 6ix