Boss Energy Limited · ASX:BOE
Boss Energy — Shareholder Meeting (November 2026)
38 slides from Boss Energy's shareholder meeting presentation, Nov 25, 2026

Slide 1: 2026 Annual General Meeting Addresses
ASX Release 25 November 2026 For personal use only 2026 Annual General Meeting Addresses Boss Energy Limited’s (ASX: BOE; OTCQX: BQSSF) Annual General Meeting will be held in Perth, Australia today, Wednesday 25 November 2026. In accordance with ASX Listing Rule 3.13.3, the address by Chair Peter Bo

Slide 2: Chair address: welcome and shareholder acknowledgement
Chair Mr Peter Botten: Welcome and shareholder acknowledgement For personal use only Good morning, and welcome to Boss Energy’s 2026 Annual General Meeting. My name is Peter Botten. This is my first AGM as Chair of your Company. I acknowledge the Whadjuk Noongar people, the Traditional Custodians of

Slide 3: Chair address: safety and the Honeymoon reset
I believe that experience is relevant to Boss as we deliver the revised Honeymoon plan and assess the opportunity to build a regional uranium production business. For personal use only Safety and responsible operations A stronger operating business must deliver better outcomes for its people and the

Slide 4: Operating progress and the FY2027 transition
Operating progress and the FY2027 transition This work on the new development pathway was undertaken alongside meaningful operating progress. For personal use only In FY2026, Honeymoon production increased by 61 per cent to 1.41 million pounds of drummed U3O8, meeting revised production guidance. C1

Slide 5: Chair address: governance and capital discipline
Oversight of production, wellfield performance, operating costs and capital requirements is embedded in how we govern the business. We will continue to report clearly on progress, explain variances against plan and set out the actions being taken in response. For personal use only The Board’s role i

Slide 6: Chair address: board commitment and outlook
I also recognise that shareholders will want assurance that I can devote the time this role requires. I have advised the Board of my intention to rebalance my other commitments to support my role at Boss. I give shareholders my personal commitment to provide the time and attention needed to lead the

Slide 7: 2026 Annual General Meeting
rsonal use only 2026 Annual General Meeting Boss Energy Reliable, lower-cost, long-life uranium ASX: BOE bossenergy.com OTCQX: BQSSF Boss Energy. A global multi-mine uranium producer 2026 Annual General Meeting 1

Slide 8: Chair Update
rsonal use only 2026 AGM Chair Update Boss Energy. A global multi-mine uranium producer 2026 Annual General Meeting 2

Slide 9: Leadership: The Board
Leadership The Board rsonal use only Substantial board and governance renewal over the past 18 months. • Peter Botten (Chair) – Oct 2026 • Matt Dusci (CEO & MD) - Oct 2025 • Caroline Keats (NED) – Jun 2025 Peter Botten Matt Dusci Caroline Keats Joanne Palmer Wyatt Buck • Joanne Palmer (NED) – Jun 20

Slide 10: The Boss Leadership Team
The Boss Leadership Team Deep operational, technical and corporate expertise rsonal use only Matt Dusci Justin Laird Kathryn Walker Conrad Wilkins Olivier Regnault Chief Executive Officer Chief Financial Officer General Counsel General Manager Head of Technical and Managing Director Services and Pla

Slide 11: CEO/MD Presentation
rsonal use only 2026 AGM CEO/MD Presentation Boss Energy. A global multi-mine uranium producer 2026 Annual General Meeting 5

Slide 12: Disclaimer and Important Notices
Disclaimer and Important Notices This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy”, “Boss” or “Company”). rsonal use only NOT INVESTMENT ADVICE This Presentation does not constitute in any way an offer or invitation to subscribe for

Slide 13: Disclaimer and Important Notices
Disclaimer and Important Notices CURRENCY AND EFFECT OF ROUNDING rsonal use only All dollar (“$”) amounts are in Australian dollars unless otherwise stated. All cost forecasts are in real 2026 terms. A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Pr

Slide 14: FY26 and the year to date
FY26 and the year to date A year of significant achievements Honeymoon reset A structurally rsonal use only completed lower-cost design New Feasibility Study delivered ahead of Wide-spaced wellfields cut life-of-mine schedule, establishing a pathway to at AISC by ~A$30/lb with ~50% less least FY34¹

Slide 15: Then and now
Then and now A stronger foundation and a clear direction rsonal use only November 2025 November 2026 Honeymoon Review under way; Enhanced Feasibility New Feasibility Study complete: economic production to Study assumptions in question at least FY34¹ Resource rebuilt on 86,670 m of new drilling and I

Slide 16: Where we are today
Where we are today Uniquely Positioned rsonal use only 1. An established 2. A pathway 3. Financial 4. Exposure to the 5. People and producer for growth strength uranium market capability Honeymoon’s mine, plant and 45.1M lbs at Gould’s Dam and Debt-free, with A$195M in cash, 1.64M lbs3 in inventory

Slide 17: Business Strategy
Business Strategy Building a reliable, lower-cost, long-life uranium business rsonal use only Business Strategy Building a reliable, lower-cost, long-life uranium business Honeymoon — an organic pipeline of deposits with established infrastructure Beyond Honeymoon Deliver and Optimise Build the Regi

Slide 18: Our Business
Our Business An operating mine at the centre of a regional production hub Honeymoon regional production hub 65.9M lbs U₃O₈ across three deposits² Hub aspiration3 rsonal use only 2.5M lbs a year at an AISC of ~A$65/lb by the early 2030s ~75 km 13 km Connected via Connected via Beyond the hub trucked

Slide 19: Honeymoon Operation
Honeymoon Operation The majority of processing infrastructure is now in place rsonal use only An established operating platform One of only three producing uranium mines in Australia One of only two ISR mines in Australia Majority of the capital investment now complete Completed in FY26 5 6 NIMCIX c

Slide 20: Honeymoon ISR mining
Honeymoon ISR mining A proven, low-impact way to recover uranium, used for more than half of world production rsonal use only 1 Inject solution to dissolve uranium in place 2 Recover uranium-rich solution to the plant 3 Recirculate in a closed circuit Low surface disturbance Closed-circuit water Low

Slide 21: Honeymoon: a solid start to FY27, on track for guidance
Honeymoon | FY26 production and Q1 FY27 Honeymoon: a solid start to FY27, on track for guidance Quarterly drummed production (k lbs U₃O₈) FY26 actuals vs FY27 guidance rsonal use only 456 FY26 actual FY27 guidance 386 362 359 Production (U₃O₈) 1.41M lbs 1.25–1.30M lbs C1 cash cost A$39/lb A$51–56/lb

Slide 22: New Feasibility Study and wide-spaced design
New Feasibility Study and wide-spaced design A new foundation for Honeymoon Honeymoon wellfield design ~50% rsonal use only Injector-to-producer spacing matched to the characteristics of the deposit less wellfield infrastructure, while longer contact time lifts recovery and lifts grade in solution b

Slide 23: A lower-cost, longer-life plan for Honeymoon
New Feasibility Study A lower-cost, longer-life plan for Honeymoon rsonal use only NFS production profile, Honeymoon only (M lbs U₃O₈ drummed)¹ ~13.8M lbs over a nine-year operating life, to at least FY34¹ 1.9 1.9 1.9 1.9 1.7 1.5 1.3 1.4 A$50/lb life-of-mine average C1 cost (US$35/lb)¹ A$79/lb life-

Slide 24: First wide-spaced wellfield has commenced leaching
Deliver and Optimise Honeymoon | Wellfield transition First wide-spaced wellfield has commenced leaching rsonal use only Transition to wide-spaced wellfields Prior (Q1 FY27) B6 producing 30 m wellfield spacing* EKT1 flushing 58 m wellfield spacing* Now (Q2 FY27) EKT1 commenced leaching 58 m wellfiel

Slide 25: Production and costs could be meaningfully improved
Build the Regional Production Hub Production and costs could be meaningfully improved rsonal use only Hub production rate Hub AISC Unit cost reduction 2.5M lbs p.a. A$65/lb (US$45/lb) ~A$12/lb lower Aspirational hub rate by the early 2030s, using installed back- Aspirational AISC at hub scale by the

Slide 26: Gould's Dam and Jason's Deposit
Build the regional production hub | Growth through Honeymoon Gould’s Dam and Jason’s Deposit Three deposits, one plant 65.9M lbs U₃O₈¹ More than triples the resource around Honeymoon rsonal use only 45.1M lbs1 at Gould’s Dam and Jason’s Deposit, none of it in the NFS mine plan. Honeymoon learnings a

Slide 27: Balance sheet preserved through a capital-intensive year
Strong balance sheet Balance sheet preserved through a capital-intensive year Cash and liquid assets, 30 September 2026 (A$M) Revenue doubled, back in profit rsonal use only No debt at any point through the reset FY26 revenue of A$151.1M (FY25: A$75.6M). Net profit after tax of A$2.5M, an A$36.7M im

Slide 28: Inventory and leverage to a strengthening uranium price
Uranium inventory | Strategically under-contracted Inventory and leverage to a strengthening uranium price Drummed U₃O₈ inventory (M lbs) 1.64M lbs ~A$211M rsonal use only Built while selling 1.4M lbs in FY26 of U₃O₈ held: more than a year of FY27 illustrative market value2, vs A$124M production boo

Slide 29: Uranium market: demand is built, being built and extended
Uranium market Demand is built, being built and being extended rsonal use only New reactors scheduled to start, GWe Policy has moved firmly behind nuclear 141 GWe in the pipeline, 86 GWe already under construction Governments in the US, China, India, Japan and Europe are building nuclear into long-t

Slide 30: Uranium market: supply is not keeping pace
Uranium market Supply is not keeping pace and a structural gap is emerging Uranium supply and demand, M lbs U₃O₈ a year Existing mines are depleting rsonal use only Output from today’s operating mines falls by around 40% 450 between 2030 and 2040 as major mines reach the end of their 400 lives. 350

Slide 31: Safety at Honeymoon: we must do better
Safety, health and wellbeing Safety at Honeymoon: we must do better Honeymoon TRIFR1, 12-month rolling average rsonal use only Our injury rate rose in FY26. Every injury affects a person, their family and Above FY25 levels and above where it needs to be their colleagues, and we are focused on sustai

Slide 32: A strong team and culture
Our people, culture and values A strong team and culture Strengthened leadership rsonal use only Strengthened leadership team: 46% of leaders are new to their roles in the past 12 months. Deep ISR technical capability Specialists in hydrogeology, geochemistry, wellfields and processing, with experie

Slide 33: Delivering today. Building long-term value.
In closing Delivering today. Building long-term value. rsonal use only Reset delivered Delivering operationally Strong balance sheet Regional growth A lower-cost plan to at least On track for FY27 guidance as Debt-free, with 1.64M lbs of Gould’s Dam and Jason’s FY34 the wellfield transition inventor

Slide 34: Questions
2026 Annual General Meeting Questions rsonal use only A stronger foundation. A clear direction. Boss Energy. A global multi-mine uranium producer 2026 Annual General Meeting 28

Slide 35: Contact Information
rsonal use only Contact Information +61 (8) 6263 4494 ASX: BOE boss@bossenergy.com OTCQX: BQSSF Boss Energy. A global multi-mine uranium producer 2026 Annual General Meeting 29

Slide 36: Appendices
rsonal use only Appendices Boss Energy. A global multi-mine uranium producer 2026 Annual General Meeting 30

Slide 37: Gould's Dam and Jason's Deposit Mineral Resource
Appendix 1 - Gould’s Dam and Jason’s Deposit Mineral Resource Table 1: Gould’s Dam Mineral Resource (reported 19 March 2026) Table 2: Jason’s Deposit Mineral Resource (reported 19 March 2026) Grade Metal Grade Metal Resource Classification M lbs Resource Classification M lbs rsonal use only Mt ppm U

Slide 38: Honeymoon Mineral Resource
Appendix 1 - Honeymoon Mineral Resource Table 3: Honeymoon Mineral Resource (reported 27 August 2026) Grade Metal Resource Classification M lbs rsonal use only Mt ppm U3O8 Kt U3O8 U3O8 Indicated 12.1 510 6.2 13.7 Inferred 9.3 350 3.2 7.1 TOTAL 21.4 440 9.4 20.8 Honeymoon Project Mineral Resource Est
Source: ASX announcement, Nov 25, 2026
More decks from Boss Energy Limited
Q1 FY27 Earnings Presentation15 slides · Oct 28, 2026
Investor Day (September 2026)87 slides · Sep 15, 2026
Investor Presentation (September 2026)88 slides · Sep 15, 2026
FY2026 Earnings Presentation44 slides · Aug 27, 2026
Diggers & Dealers Mining Forum 202618 slides · Aug 4, 2026
Q4 FY2026 Earnings Presentation13 slides · Jul 30, 2026