Pasinex Resources Ltd. · CSE:PSE

Pasinex Resources — Investor Presentation (October 2016)

21 slides from Pasinex Resources's investor presentation, October 2016

  1. Slide 1: Corporate Presentation October 2016: High Grade Zinc

    Slide 1: Corporate Presentation October 2016: High Grade Zinc

    Corporate Presentation October 2016 High Grade Zinc: Production and growth in Turkey

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information contained in this presentation is provided by Pasinex Resource Limited. (“Pasinex”) for informational purposes only and does not constitute an offer to issue or arrange to issue, or the solicitation of an offer to issue, securities of Pasinex or other financial products. T

  3. Slide 3: Summary

    Slide 3: Summary

    Summary  50% owner of direct shipping (DSO) zinc material.  Now producing both oxide and sulphide DSO product.  Projected total JV sales of 30 million pounds Zn in 2016.  15% higher zinc price increases EBITDA 50%.  Resource expansion drilling underway.  A district play with growth expected fr

  4. Slide 4: Introduction

    Slide 4: Introduction

    Introduction  Pasinex is a 50% owner of an expanding DSO zinc producer from Pinargozu mine.  Pinargozu is a carbonate replacement deposit (CRD) near Adana, central Turkey.  Production grade exceeds 30% Zn as oxide and 48% Zn as sulphide.  Strong local JV partner Akmetal A.S.  Direct shipping to

  5. Slide 5: Capital Structure, Metal Price Performance

    Slide 5: Capital Structure, Metal Price Performance

    Capital Structure, Metal Price Performance Issued and Outstanding 113,892,309 Warrants 27,346,929 Board, Insiders – about 70% shares Options 4,240,000 Total Fully Diluted 145,479,238 Relative one – year performance PSE compared to TSX and Trevali (TV) 24.10.2016 Pasinex Resources Limited 5

  6. Slide 6: Pasinex Management & Board

    Slide 6: Pasinex Management & Board

    Pasinex Management & Board  Steve Williams Board Chairman President, CEO – Metallurgy Financial and legal expert was degree and MBA, Mines in CFO / Director for a number of Australia and Canada, 20 years junior exploration companies. with SGS in Metallurgy, Past  Joachim Rainer Managing Director S

  7. Slide 7: Zinc outlook remains robust

    Slide 7: Zinc outlook remains robust

    Zinc outlook remains robust  Mine closures occurred in 2015.  Expected shortfall in mine supply from 2016.  Zinc price up about 60% in 2016.  Current Zn price around 104 c US / lb. 24.10.2016 Pasinex Resources Limited 7

  8. Slide 8: District Zinc Potential

    Slide 8: District Zinc Potential

    District Zinc Potential  Turkey is very under-explored particularly for base metals.  Red areas show area prospective for Zn exploration where Pasinex operates.  Infrastructure is strong in Turkey. Key to Pasinex being able to ramp up fast to production.  Access to major roads, port (Mersin), ma

  9. Slide 9: Pinargozu Mine site

    Slide 9: Pinargozu Mine site

    Pinargozu Mine site Main city of Adana – 1.8 million Port of Mersin – 2 ½ hrs away. HV power available. Water available. Red – JV licenses, Blue – Akmetal AS license. 24.10.2016 Pasinex Resources Limited 9

  10. Slide 10: Pinargozu Mine - Mineralization

    Slide 10: Pinargozu Mine - Mineralization

    Pinargozu Mine - Mineralization  Blue area indicates inferred mineralization (cut off grade 25% Zn).  Green area shows newer deeper mineralization.  Mineralization predominantly zinc carbonates (oxide) - sulphides in green area.  Mineralized intercepts typically range from 28% Zn to 60% Zn. 24.1

  11. Slide 11: Production from 3 Adits

    Slide 11: Production from 3 Adits

    Production from 3 Adits  New adit at 665 meter level shown during development.  Current production rate 120 tonnes per day of direct shipping product.  New adit allowing production of both oxide and sulphide DSO material. 24.10.2016 Pasinex Resources Limited 11

  12. Slide 12: Production from multiple faces

    Slide 12: Production from multiple faces

    Production from multiple faces  New adit at 665 meter level in 3D view.  Mineralization in green and red.  Underground drifting in pink. 24.10.2016 Pasinex Resources Limited 12

  13. Slide 13: Recent sulphide drill results - a new discovery

    Slide 13: Recent sulphide drill results - a new discovery

    Recent sulphide drill results - a new discovery Core Length Drill Hole # Zn Grade %** Core Recovery %*** From (metres) Interval Metres* PPU16-018 9.8 49.4 58.2 21.6 PPU16-020 8 55.6 84.7 18.5 including 4.9 62.5 90.8 21.6 PPU16-024 8.6 40.8 65.1 23.5 and 3.3 54.7 79.7 45.7 PPU16-028 10 54.4 78.4 27 i

  14. Slide 14: Significant JV Production increase 2016 YTD vs 2015

    Slide 14: Significant JV Production increase 2016 YTD vs 2015

    Significant JV Production increase 2016 YTD vs 2015 Wet Dry Cum Wet Cum Dry Lot Moistur Assay Date of sale Type weight Weight Weight Weight # e% % Zn (tonnes) (tonnes) (tonnes) (tonnes) 2014 / 2014 / 2015 total 2015 total 1 24/04/2015 Oxide 5,002.100 6.26 4,688.911 5,002.100 4,688.911 33.08 2 05/05/

  15. Slide 15: District Exploration potential

    Slide 15: District Exploration potential

    District Exploration potential 24.10.2016 Pasinex Resources Limited 15

  16. Slide 16: Exploration Conceptual Model

    Slide 16: Exploration Conceptual Model

    Exploration Conceptual Model  Carbonate replacement Zn geological model.  Current Pinargozu operation is high up in the “manto” – could be a deep system.  Skarn opportunity (marble seen at Pinargozu). 24.10.2016 Pasinex Resources Limited 16

  17. Slide 17: Annual Project JV EBITDA Sensitivity

    Slide 17: Annual Project JV EBITDA Sensitivity

    Annual Project JV EBITDA Sensitivity Leverage: 15% price increase increases EBITDA 50% 33% mining increase increases EBITDA 96% Combined gives 75% increase in EBITDA Zinc Price in US $ per lb /US $ per tonne Tonnes per day Tonnes per day/year $0,60/ $0,69/ $0,79/ $0,91/ $1,05/ $1,21/ $1.322 $1.520 $

  18. Slide 18: Pinargozu Strategy

    Slide 18: Pinargozu Strategy

    Pinargozu Strategy  Strategy  Expand annual JV zinc production rate to 50 million pounds in 2017.  Increase resources to over 1 million tonnes to support over ten years mining.  Establish district exploration opportunities, identify additional resources.  Status  Three adits from hillside now

  19. Slide 19: Zinc outlook remains robust

    Slide 19: Zinc outlook remains robust

    Zinc outlook remains robust  One year price chart shows recovery.  Forecasts: tightening supply following closures, price risk is to the upside. 24.10.2016 Pasinex Resources Limited 19

  20. Slide 20: Pasinex Summary

    Slide 20: Pasinex Summary

    Pasinex Summary  A primary zinc production company.  50% interest in Pinargozu mine, Turkey.  22,000 tpa JV zinc production in 2017.  Resource expansion, drills turning.  Large land position in a CRD zinc district.  Tightly held by few major shareholders.  15% lift in prices gives 50% EBITDA

  21. Slide 21: Contact Details

    Slide 21: Contact Details

    Contact Details  Canada Main Office  Office of President, Canada Pasinex Resources Limited Tel +1 416 861 9659 steve.williams@pasinex.com 82 Richmond Street E Toronto, ON M5C 1P1 Tel +1 416 861 9659  General Information info@pasinex.com  Adana Office, Turkey  CHF Investor Relations Zeytinli Mah

Source: Internet Archive copy of pasinex.com

More decks from Pasinex Resources Ltd.

All 12 Pasinex Resources decks